Lock +TM, 6014 [2018-02787]
Download as PDF
6014
Federal Register / Vol. 83, No. 29 / Monday, February 12, 2018 / Notices
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: February 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–02779 Filed 2–9–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14673–001]
daltland on DSKBBV9HB2PROD with NOTICES
Lock +TM Hydro Friends Fund II; Notice
of Surrender of Preliminary Permit
Take notice that Lock +TM Hydro
Friends Fund II, permittee for the
proposed Coffeeville Lock and Dam
Hydroelectric Project, has requested that
its preliminary permit be terminated.
The permit was issued on June 3, 2016,
and would have expired on May 31,
2019.1 The project would have been
located on the Tombigbee River, in
Clark and Choctaw Counties, Alabama.
The preliminary permit for Project
No. 14673 will remain in effect until the
close of business, March 8, 2018. If the
Commission is closed on this day, then
the permit remains in effect until the
close of business on the next day in
which the Commission is open.2 New
applications for this site may not be
submitted until after the permit
surrender is effective.
1 154
2 18
FERC ¶ 62,094 (2016).
CFR 385.2007(a)(2) (2017).
VerDate Sep<11>2014
19:23 Feb 09, 2018
Jkt 244001
Dated: February 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–02787 Filed 2–9–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR18–27–000.
Applicants: NorthWestern
Corporation.
Description: Tariff filing per
284.123(b),(e)/: Revised Rate Schedules
for Transportation and Storage Service
(D2017.11.86) to be effective 1/1/2018;
Filing Type: 980.
Filed Date: 1/31/18.
Accession Number: 201801315068.
Comments/Protests Due: 5 p.m. ET 2/
21/18.
Docket Numbers: RP17–913–002.
Applicants: Natural Gas Pipeline
Company of America.
Description: Compliance filing
Compliance Filing.
Filed Date: 2/1/18.
Accession Number: 20180201–5112.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: RP18–408–000.
Applicants: Northern Natural Gas
Company.
Description: § 4(d) Rate Filing:
20180201 Annual PRA to be effective 4/
1/2018.
Filed Date: 2/1/18.
Accession Number: 20180201–5041.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: RP18–409–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing:
Amendment to Neg Rate Agmt (FPL
41619–17) to be effective 2/1/2018.
Filed Date: 2/1/18.
Accession Number: 20180201–5071.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: RP18–410–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmt (Pivotal 34691 to
Sequent 49016) to be effective 2/1/2018.
Filed Date: 2/1/18.
Accession Number: 20180201–5074.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: RP18–411–000.
Applicants: Gulf Crossing Pipeline
Company LLC.
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmt (Newfield 18 to SW
Energy 1945) to be effective 2/2/2018.
Filed Date: 2/1/18.
Accession Number: 20180201–5088.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: RP18–412–000.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing:
Volume No. 2—Neg Rate
Nonconforming Mitsui Co Cameron
LNG SP326297 to be effective 3/1/2018.
Filed Date: 2/1/18.
Accession Number: 20180201–5107.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: RP18–413–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing: Neg
Rate Agmt (DTE 41614) to be effective
2/1/2018.
Filed Date: 2/1/18.
Accession Number: 20180201–5111.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: RP18–414–000.
Applicants: Great Lakes Gas
Transmission Limited Par.
Description: Great Lakes Gas
Transmission Limited Partnership
submits its Semi-Annual Transporter’s
Use Report under RP18–414.
Filed Date: 1/31/18.
Accession Number: 20180131–5294.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: RP18–416–000.
Applicants: Viking Gas Transmission
Company.
Description: § 4(d) Rate Filing: Update
to Title Page Negotiated Rate
Agreements to be effective 3/2/2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5082.
Comments Due: 5 p.m. ET 2/14/18.
Docket Numbers: RP18–417–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: § 4(d) Rate Filing: TPC
Administrative Filing to be effective 3/
5/2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5119.
Comments Due: 5 p.m. ET 2/14/18.
Docket Numbers: RP18–418–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2018–02–02 BP, CP to be effective
2/3/2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5165.
Comments Due: 5 p.m. ET 2/14/18.
Docket Numbers: RP18–419–000.
Applicants: Dominion Energy Cove
Point LNG, LP.
Description: § 4(d) Rate Filing:
DECP—Liquefaction Project (CP13–113)
E:\FR\FM\12FEN1.SGM
12FEN1
Agencies
[Federal Register Volume 83, Number 29 (Monday, February 12, 2018)]
[Notices]
[Page 6014]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-02787]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14673-001]
Lock +TM Hydro Friends Fund II; Notice of Surrender of
Preliminary Permit
Take notice that Lock +TM Hydro Friends Fund II,
permittee for the proposed Coffeeville Lock and Dam Hydroelectric
Project, has requested that its preliminary permit be terminated. The
permit was issued on June 3, 2016, and would have expired on May 31,
2019.\1\ The project would have been located on the Tombigbee River, in
Clark and Choctaw Counties, Alabama.
---------------------------------------------------------------------------
\1\ 154 FERC ] 62,094 (2016).
---------------------------------------------------------------------------
The preliminary permit for Project No. 14673 will remain in effect
until the close of business, March 8, 2018. If the Commission is closed
on this day, then the permit remains in effect until the close of
business on the next day in which the Commission is open.\2\ New
applications for this site may not be submitted until after the permit
surrender is effective.
---------------------------------------------------------------------------
\2\ 18 CFR 385.2007(a)(2) (2017).
Dated: February 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-02787 Filed 2-9-18; 8:45 am]
BILLING CODE 6717-01-P