Lock +TM, 6014 [2018-02787]

Download as PDF 6014 Federal Register / Vol. 83, No. 29 / Monday, February 12, 2018 / Notices listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 6, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–02779 Filed 2–9–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14673–001] daltland on DSKBBV9HB2PROD with NOTICES Lock +TM Hydro Friends Fund II; Notice of Surrender of Preliminary Permit Take notice that Lock +TM Hydro Friends Fund II, permittee for the proposed Coffeeville Lock and Dam Hydroelectric Project, has requested that its preliminary permit be terminated. The permit was issued on June 3, 2016, and would have expired on May 31, 2019.1 The project would have been located on the Tombigbee River, in Clark and Choctaw Counties, Alabama. The preliminary permit for Project No. 14673 will remain in effect until the close of business, March 8, 2018. If the Commission is closed on this day, then the permit remains in effect until the close of business on the next day in which the Commission is open.2 New applications for this site may not be submitted until after the permit surrender is effective. 1 154 2 18 FERC ¶ 62,094 (2016). CFR 385.2007(a)(2) (2017). VerDate Sep<11>2014 19:23 Feb 09, 2018 Jkt 244001 Dated: February 6, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–02787 Filed 2–9–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Number: PR18–27–000. Applicants: NorthWestern Corporation. Description: Tariff filing per 284.123(b),(e)/: Revised Rate Schedules for Transportation and Storage Service (D2017.11.86) to be effective 1/1/2018; Filing Type: 980. Filed Date: 1/31/18. Accession Number: 201801315068. Comments/Protests Due: 5 p.m. ET 2/ 21/18. Docket Numbers: RP17–913–002. Applicants: Natural Gas Pipeline Company of America. Description: Compliance filing Compliance Filing. Filed Date: 2/1/18. Accession Number: 20180201–5112. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–408–000. Applicants: Northern Natural Gas Company. Description: § 4(d) Rate Filing: 20180201 Annual PRA to be effective 4/ 1/2018. Filed Date: 2/1/18. Accession Number: 20180201–5041. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–409–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Amendment to Neg Rate Agmt (FPL 41619–17) to be effective 2/1/2018. Filed Date: 2/1/18. Accession Number: 20180201–5071. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–410–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmt (Pivotal 34691 to Sequent 49016) to be effective 2/1/2018. Filed Date: 2/1/18. Accession Number: 20180201–5074. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–411–000. Applicants: Gulf Crossing Pipeline Company LLC. PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmt (Newfield 18 to SW Energy 1945) to be effective 2/2/2018. Filed Date: 2/1/18. Accession Number: 20180201–5088. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–412–000. Applicants: Tennessee Gas Pipeline Company, L.L.C. Description: § 4(d) Rate Filing: Volume No. 2—Neg Rate Nonconforming Mitsui Co Cameron LNG SP326297 to be effective 3/1/2018. Filed Date: 2/1/18. Accession Number: 20180201–5107. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–413–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Neg Rate Agmt (DTE 41614) to be effective 2/1/2018. Filed Date: 2/1/18. Accession Number: 20180201–5111. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–414–000. Applicants: Great Lakes Gas Transmission Limited Par. Description: Great Lakes Gas Transmission Limited Partnership submits its Semi-Annual Transporter’s Use Report under RP18–414. Filed Date: 1/31/18. Accession Number: 20180131–5294. Comments Due: 5 p.m. ET 2/12/18. Docket Numbers: RP18–416–000. Applicants: Viking Gas Transmission Company. Description: § 4(d) Rate Filing: Update to Title Page Negotiated Rate Agreements to be effective 3/2/2018. Filed Date: 2/2/18. Accession Number: 20180202–5082. Comments Due: 5 p.m. ET 2/14/18. Docket Numbers: RP18–417–000. Applicants: Trailblazer Pipeline Company LLC. Description: § 4(d) Rate Filing: TPC Administrative Filing to be effective 3/ 5/2018. Filed Date: 2/2/18. Accession Number: 20180202–5119. Comments Due: 5 p.m. ET 2/14/18. Docket Numbers: RP18–418–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: Neg Rate 2018–02–02 BP, CP to be effective 2/3/2018. Filed Date: 2/2/18. Accession Number: 20180202–5165. Comments Due: 5 p.m. ET 2/14/18. Docket Numbers: RP18–419–000. Applicants: Dominion Energy Cove Point LNG, LP. Description: § 4(d) Rate Filing: DECP—Liquefaction Project (CP13–113) E:\FR\FM\12FEN1.SGM 12FEN1

Agencies

[Federal Register Volume 83, Number 29 (Monday, February 12, 2018)]
[Notices]
[Page 6014]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-02787]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14673-001]


Lock +TM Hydro Friends Fund II; Notice of Surrender of 
Preliminary Permit

    Take notice that Lock +TM Hydro Friends Fund II, 
permittee for the proposed Coffeeville Lock and Dam Hydroelectric 
Project, has requested that its preliminary permit be terminated. The 
permit was issued on June 3, 2016, and would have expired on May 31, 
2019.\1\ The project would have been located on the Tombigbee River, in 
Clark and Choctaw Counties, Alabama.
---------------------------------------------------------------------------

    \1\ 154 FERC ] 62,094 (2016).
---------------------------------------------------------------------------

    The preliminary permit for Project No. 14673 will remain in effect 
until the close of business, March 8, 2018. If the Commission is closed 
on this day, then the permit remains in effect until the close of 
business on the next day in which the Commission is open.\2\ New 
applications for this site may not be submitted until after the permit 
surrender is effective.
---------------------------------------------------------------------------

    \2\ 18 CFR 385.2007(a)(2) (2017).

    Dated: February 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-02787 Filed 2-9-18; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.