Lock 12 Hydro Partners, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 6009-6010 [2018-02784]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 83, No. 29 / Monday, February 12, 2018 / Notices
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmt (Pivotal 34691 to
Sequent 49016) to be effective 2/1/2018.
Filed Date: 2/1/18.
Accession Number: 20180201–5074.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: RP18–411–000.
Applicants: Gulf Crossing Pipeline
Company LLC.
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmt (Newfield 18 to SW
Energy 1945) to be effective 2/2/2018.
Filed Date: 2/1/18.
Accession Number: 20180201–5088.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: RP18–412–000.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing:
Volume No. 2—Neg Rate
Nonconforming Mitsui Co Cameron
LNG SP326297 to be effective 3/1/2018.
Filed Date: 2/1/18.
Accession Number: 20180201–5107.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: RP18–413–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing: Neg
Rate Agmt (DTE 41614) to be effective
2/1/2018.
Filed Date: 2/1/18.
Accession Number: 20180201–5111.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: RP18–414–000.
Applicants: Great Lakes Gas
Transmission Limited Par.
Description: Great Lakes Gas
Transmission Limited Partnership
submits its Semi-Annual Transporter’s
Use Report under RP18–414.
Filed Date: 1/31/18.
Accession Number: 20180131–5294.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: RP18–416–000.
Applicants: Viking Gas Transmission
Company.
Description: § 4(d) Rate Filing: Update
to Title Page Negotiated Rate
Agreements to be effective 3/2/2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5082.
Comments Due: 5 p.m. ET 2/14/18.
Docket Numbers: RP18–417–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: § 4(d) Rate Filing: TPC
Administrative Filing to be effective 3/
5/2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5119.
Comments Due: 5 p.m. ET 2/14/18.
Docket Numbers: RP18–418–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2018–02–02 BP, CP to be effective
2/3/2018.
VerDate Sep<11>2014
19:23 Feb 09, 2018
Jkt 244001
Filed Date: 2/2/18.
Accession Number: 20180202–5165.
Comments Due: 5 p.m. ET 2/14/18.
Docket Numbers: RP18–419–000.
Applicants: Dominion Energy Cove
Point LNG, LP.
Description: § 4(d) Rate Filing:
DECP—Liquefaction Project (CP13–113)
Services, Neg. Rates, & Nonconforming
SAs to be effective 3/5/2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5189.
Comments Due: 5 p.m. ET 2/14/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–02772 Filed 2–9–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13214–015]
Lock 12 Hydro Partners, LLC; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Request for a
non-capacity amendment to the license.
b. Project No.: 13214–015.
c. Date Filed: December 15, 2017.
d. Applicant: Lock 12 Hydro Partners,
LLC.
e. Name of Project: Ravenna
Hydroelectric Project.
f. Location: This project will be
located at the Kentucky River
Authority’s Lock and Dam No. 12 on the
Kentucky River, near the Town of
Ravenna, in Estill County, Kentucky.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
6009
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. David
Brown Kinloch, Lock 12 Hydro Partners,
LLC, 414 S. Wenzel Street, Louisville,
KY 40204, (502) 589–0975.
i. FERC Contact: Zeena Aljibury, (202)
502–6065, zeena.aljibury@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
March 8, 2018.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–13214–015.
k. Description of Request: Lock 12
Hydro Partners, LLC requests approval
for an amendment to the license for the
Ravenna Hydroelectric Project. Lock 12
Hydro Partners, LLC is proposing to
change the powerhouse design
approved in the license to simplify the
project’s design and better protect the
generating equipment during extreme
floods that can occur on the Kentucky
River. Lock 12 Hydro Partners, LLC is
proposing to use 5 Flygt submersible
turbine-generators with a total
generating capacity of 2.64 megawatts
(MW), as opposed to the authorized 4
conventional Kaplan turbines (also with
a total generating capacity of 2.64 MW).
The 5 Flygt turbine-generators would
have a total hydraulic capacity of 2,193
cubic feet per second (cfs), as opposed
to the total hydraulic capacity
authorized for the Kaplan units of 2,100
cfs. The applicant states that this slight
increase in the maximum hydraulic
capacity should have no impact on fish
entrainment since the inlet speed at the
trashrack would still be well below the
maximum inlet speed of 1.5 feet per
second in the project license.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
E:\FR\FM\12FEN1.SGM
12FEN1
daltland on DSKBBV9HB2PROD with NOTICES
6010
Federal Register / Vol. 83, No. 29 / Monday, February 12, 2018 / Notices
viewed on the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208- 3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title COMMENTS,
PROTEST, or MOTION TO INTERVENE
as applicable; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the amendment.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
VerDate Sep<11>2014
19:23 Feb 09, 2018
Jkt 244001
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: February 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–02784 Filed 2–9–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–784–000]
Upstream Wind Energy LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of
Upstream Wind Energy LLC‘s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is February 26,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: February 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–02776 Filed 2–9–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7569–006]
University of Notre Dame; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection. Please note that
this application was previously noticed
by the Commission on October 3, 2017.
However, due to a clerical error, the
Commission is reissuing this notice for
public comment. There have been no
significant changes to the exemptee’s
application since the October 3, 2017.
a. Type of Application: Application to
amend 5 MW exemption from licensing.
b. Project No.: 7569–006.
c. Date Filed: April 24, 2017, and
supplemented on September 21, 2017.
d. Applicant: University of Notre
Dame.
e. Name of Project: South Bend
Hydroelectric Project.
f. Location: The project is located on
the St. Joseph River in St. Joseph
County, Indiana.
g. Filed Pursuant to: 18 CFR 4.104
(2016).
h. Applicant Contact: Mr. Paul A.
Kempf, University of Notre Dame, 100
Facilities Building, Notre Dame, IN
46556, (574) 631–0142.
E:\FR\FM\12FEN1.SGM
12FEN1
Agencies
[Federal Register Volume 83, Number 29 (Monday, February 12, 2018)]
[Notices]
[Pages 6009-6010]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-02784]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13214-015]
Lock 12 Hydro Partners, LLC; Notice of Application Accepted for
Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Request for a non-capacity amendment to the
license.
b. Project No.: 13214-015.
c. Date Filed: December 15, 2017.
d. Applicant: Lock 12 Hydro Partners, LLC.
e. Name of Project: Ravenna Hydroelectric Project.
f. Location: This project will be located at the Kentucky River
Authority's Lock and Dam No. 12 on the Kentucky River, near the Town of
Ravenna, in Estill County, Kentucky.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. David Brown Kinloch, Lock 12 Hydro
Partners, LLC, 414 S. Wenzel Street, Louisville, KY 40204, (502) 589-
0975.
i. FERC Contact: Zeena Aljibury, (202) 502-6065,
[email protected].
j. Deadline for filing comments, motions to intervene, and
protests: March 8, 2018.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, comments, or recommendations using the
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-13214-015.
k. Description of Request: Lock 12 Hydro Partners, LLC requests
approval for an amendment to the license for the Ravenna Hydroelectric
Project. Lock 12 Hydro Partners, LLC is proposing to change the
powerhouse design approved in the license to simplify the project's
design and better protect the generating equipment during extreme
floods that can occur on the Kentucky River. Lock 12 Hydro Partners,
LLC is proposing to use 5 Flygt submersible turbine-generators with a
total generating capacity of 2.64 megawatts (MW), as opposed to the
authorized 4 conventional Kaplan turbines (also with a total generating
capacity of 2.64 MW). The 5 Flygt turbine-generators would have a total
hydraulic capacity of 2,193 cubic feet per second (cfs), as opposed to
the total hydraulic capacity authorized for the Kaplan units of 2,100
cfs. The applicant states that this slight increase in the maximum
hydraulic capacity should have no impact on fish entrainment since the
inlet speed at the trashrack would still be well below the maximum
inlet speed of 1.5 feet per second in the project license.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC
20426, or by calling (202) 502-8371. This filing may also be
[[Page 6010]]
viewed on the Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208- 3676 or email
[email protected], for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO
INTERVENE as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions
to intervene, or protests must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). All comments,
motions to intervene, or protests should relate to project works which
are the subject of the amendment. Agencies may obtain copies of the
application directly from the applicant. A copy of any protest or
motion to intervene must be served upon each representative of the
applicant specified in the particular application. If an intervener
files comments or documents with the Commission relating to the merits
of an issue that may affect the responsibilities of a particular
resource agency, they must also serve a copy of the document on that
resource agency. A copy of all other filings in reference to this
application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Dated: February 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-02784 Filed 2-9-18; 8:45 am]
BILLING CODE 6717-01-P