Lock 12 Hydro Partners, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 6009-6010 [2018-02784]

Download as PDF daltland on DSKBBV9HB2PROD with NOTICES Federal Register / Vol. 83, No. 29 / Monday, February 12, 2018 / Notices Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmt (Pivotal 34691 to Sequent 49016) to be effective 2/1/2018. Filed Date: 2/1/18. Accession Number: 20180201–5074. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–411–000. Applicants: Gulf Crossing Pipeline Company LLC. Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmt (Newfield 18 to SW Energy 1945) to be effective 2/2/2018. Filed Date: 2/1/18. Accession Number: 20180201–5088. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–412–000. Applicants: Tennessee Gas Pipeline Company, L.L.C. Description: § 4(d) Rate Filing: Volume No. 2—Neg Rate Nonconforming Mitsui Co Cameron LNG SP326297 to be effective 3/1/2018. Filed Date: 2/1/18. Accession Number: 20180201–5107. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–413–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Neg Rate Agmt (DTE 41614) to be effective 2/1/2018. Filed Date: 2/1/18. Accession Number: 20180201–5111. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–414–000. Applicants: Great Lakes Gas Transmission Limited Par. Description: Great Lakes Gas Transmission Limited Partnership submits its Semi-Annual Transporter’s Use Report under RP18–414. Filed Date: 1/31/18. Accession Number: 20180131–5294. Comments Due: 5 p.m. ET 2/12/18. Docket Numbers: RP18–416–000. Applicants: Viking Gas Transmission Company. Description: § 4(d) Rate Filing: Update to Title Page Negotiated Rate Agreements to be effective 3/2/2018. Filed Date: 2/2/18. Accession Number: 20180202–5082. Comments Due: 5 p.m. ET 2/14/18. Docket Numbers: RP18–417–000. Applicants: Trailblazer Pipeline Company LLC. Description: § 4(d) Rate Filing: TPC Administrative Filing to be effective 3/ 5/2018. Filed Date: 2/2/18. Accession Number: 20180202–5119. Comments Due: 5 p.m. ET 2/14/18. Docket Numbers: RP18–418–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: Neg Rate 2018–02–02 BP, CP to be effective 2/3/2018. VerDate Sep<11>2014 19:23 Feb 09, 2018 Jkt 244001 Filed Date: 2/2/18. Accession Number: 20180202–5165. Comments Due: 5 p.m. ET 2/14/18. Docket Numbers: RP18–419–000. Applicants: Dominion Energy Cove Point LNG, LP. Description: § 4(d) Rate Filing: DECP—Liquefaction Project (CP13–113) Services, Neg. Rates, & Nonconforming SAs to be effective 3/5/2018. Filed Date: 2/2/18. Accession Number: 20180202–5189. Comments Due: 5 p.m. ET 2/14/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified date(s). Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–02772 Filed 2–9–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13214–015] Lock 12 Hydro Partners, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Request for a non-capacity amendment to the license. b. Project No.: 13214–015. c. Date Filed: December 15, 2017. d. Applicant: Lock 12 Hydro Partners, LLC. e. Name of Project: Ravenna Hydroelectric Project. f. Location: This project will be located at the Kentucky River Authority’s Lock and Dam No. 12 on the Kentucky River, near the Town of Ravenna, in Estill County, Kentucky. PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 6009 g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. David Brown Kinloch, Lock 12 Hydro Partners, LLC, 414 S. Wenzel Street, Louisville, KY 40204, (502) 589–0975. i. FERC Contact: Zeena Aljibury, (202) 502–6065, zeena.aljibury@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: March 8, 2018. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–13214–015. k. Description of Request: Lock 12 Hydro Partners, LLC requests approval for an amendment to the license for the Ravenna Hydroelectric Project. Lock 12 Hydro Partners, LLC is proposing to change the powerhouse design approved in the license to simplify the project’s design and better protect the generating equipment during extreme floods that can occur on the Kentucky River. Lock 12 Hydro Partners, LLC is proposing to use 5 Flygt submersible turbine-generators with a total generating capacity of 2.64 megawatts (MW), as opposed to the authorized 4 conventional Kaplan turbines (also with a total generating capacity of 2.64 MW). The 5 Flygt turbine-generators would have a total hydraulic capacity of 2,193 cubic feet per second (cfs), as opposed to the total hydraulic capacity authorized for the Kaplan units of 2,100 cfs. The applicant states that this slight increase in the maximum hydraulic capacity should have no impact on fish entrainment since the inlet speed at the trashrack would still be well below the maximum inlet speed of 1.5 feet per second in the project license. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be E:\FR\FM\12FEN1.SGM 12FEN1 daltland on DSKBBV9HB2PROD with NOTICES 6010 Federal Register / Vol. 83, No. 29 / Monday, February 12, 2018 / Notices viewed on the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208- 3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the amendment. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. VerDate Sep<11>2014 19:23 Feb 09, 2018 Jkt 244001 A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: February 6, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–02784 Filed 2–9–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–784–000] Upstream Wind Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Upstream Wind Energy LLC‘s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is February 26, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 6, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–02776 Filed 2–9–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7569–006] University of Notre Dame; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. Please note that this application was previously noticed by the Commission on October 3, 2017. However, due to a clerical error, the Commission is reissuing this notice for public comment. There have been no significant changes to the exemptee’s application since the October 3, 2017. a. Type of Application: Application to amend 5 MW exemption from licensing. b. Project No.: 7569–006. c. Date Filed: April 24, 2017, and supplemented on September 21, 2017. d. Applicant: University of Notre Dame. e. Name of Project: South Bend Hydroelectric Project. f. Location: The project is located on the St. Joseph River in St. Joseph County, Indiana. g. Filed Pursuant to: 18 CFR 4.104 (2016). h. Applicant Contact: Mr. Paul A. Kempf, University of Notre Dame, 100 Facilities Building, Notre Dame, IN 46556, (574) 631–0142. E:\FR\FM\12FEN1.SGM 12FEN1

Agencies

[Federal Register Volume 83, Number 29 (Monday, February 12, 2018)]
[Notices]
[Pages 6009-6010]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-02784]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13214-015]


Lock 12 Hydro Partners, LLC; Notice of Application Accepted for 
Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Request for a non-capacity amendment to the 
license.
    b. Project No.: 13214-015.
    c. Date Filed: December 15, 2017.
    d. Applicant: Lock 12 Hydro Partners, LLC.
    e. Name of Project: Ravenna Hydroelectric Project.
    f. Location: This project will be located at the Kentucky River 
Authority's Lock and Dam No. 12 on the Kentucky River, near the Town of 
Ravenna, in Estill County, Kentucky.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. David Brown Kinloch, Lock 12 Hydro 
Partners, LLC, 414 S. Wenzel Street, Louisville, KY 40204, (502) 589-
0975.
    i. FERC Contact: Zeena Aljibury, (202) 502-6065, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: March 8, 2018.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, or recommendations using the 
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-13214-015.
    k. Description of Request: Lock 12 Hydro Partners, LLC requests 
approval for an amendment to the license for the Ravenna Hydroelectric 
Project. Lock 12 Hydro Partners, LLC is proposing to change the 
powerhouse design approved in the license to simplify the project's 
design and better protect the generating equipment during extreme 
floods that can occur on the Kentucky River. Lock 12 Hydro Partners, 
LLC is proposing to use 5 Flygt submersible turbine-generators with a 
total generating capacity of 2.64 megawatts (MW), as opposed to the 
authorized 4 conventional Kaplan turbines (also with a total generating 
capacity of 2.64 MW). The 5 Flygt turbine-generators would have a total 
hydraulic capacity of 2,193 cubic feet per second (cfs), as opposed to 
the total hydraulic capacity authorized for the Kaplan units of 2,100 
cfs. The applicant states that this slight increase in the maximum 
hydraulic capacity should have no impact on fish entrainment since the 
inlet speed at the trashrack would still be well below the maximum 
inlet speed of 1.5 feet per second in the project license.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling (202) 502-8371. This filing may also be

[[Page 6010]]

viewed on the Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208- 3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO 
INTERVENE as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions 
to intervene, or protests must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). All comments, 
motions to intervene, or protests should relate to project works which 
are the subject of the amendment. Agencies may obtain copies of the 
application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. If an intervener 
files comments or documents with the Commission relating to the merits 
of an issue that may affect the responsibilities of a particular 
resource agency, they must also serve a copy of the document on that 
resource agency. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: February 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-02784 Filed 2-9-18; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.