Pinal Central Energy Center, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 6013-6014 [2018-02779]

Download as PDF Federal Register / Vol. 83, No. 29 / Monday, February 12, 2018 / Notices become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on February 16, 2018. Dated: February 6, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–02780 Filed 2–9–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–12–000] daltland on DSKBBV9HB2PROD with NOTICES Natural Gas Pipeline Company of America LLC; Notice of Schedule for Environmental Review of the Herscher Northwest Storage Field Abandonment Project On October 31, 2017, Natural Gas Pipeline Company of America LLC (Natural) filed an application in Docket No. CP18–12–000 requesting permission pursuant to Section 7(b) of the Natural Gas Act to abandon certain facilities. The proposed project is known as the Herscher Northwest Storage Field Abandonment Project (Project), and is located in Kankakee County, Illinois. On November 8, 2017, the Federal Energy Regulatory Commission (Commission or FERC) issued its Notice of Application for the Project. Among other things, that notice alerted agencies issuing federal authorizations of the VerDate Sep<11>2014 19:23 Feb 09, 2018 Jkt 244001 requirement to complete all necessary reviews and to reach a final decision on a request for a federal authorization within 90 days of the date of issuance of the Commission staff’s Environmental Assessment (EA) for the Project. This instant notice identifies the FERC staff’s planned schedule for the completion of the EA for the Project. Schedule for Environmental Review Issuance of EA—April 12, 2018 90-Day Federal Authorization Decision Deadline—July 11, 2018 If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. Project Description Natural proposes to abandon in place injection/withdrawal wells, pipeline laterals, and observation wells, and abandon by removal Compressor Station 202 and ancillary aboveground facilities belonging to its Herscher Northwest natural gas storage field in Kankakee, Illinois. Natural would also abandon in place approximately 15.3 billion cubic feet of non-recoverable cushion gas. Background On January 2, 2018 the Commission issued a Notice of Intent to Prepare an Environmental Assessment for the proposed Herscher Northwest Storage Field Abandonment Project and Request for Comments on Environmental Issues (NOI). The NOI was sent to affected landowners; federal, state, and local government agencies; elected officials; environmental and public interest groups; Native American tribes; other interested parties; and local libraries and newspapers. In response to the NOI, the Commission received comments from the U.S. Environmental Protection Agency (EPA). The primary issue raised by the EPA is potential impacts on groundwater. Additional Information In order to receive notification of the issuance of the EA and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 6013 website (www.ferc.gov). Using the eLibrary link, select General Search from the eLibrary menu, enter the selected date range and Docket Number excluding the last three digits (i.e., CP18–12), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: February 6, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–02778 Filed 2–9–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–807–000] Pinal Central Energy Center, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding Pinal Central Energy Center, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is February 26, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be E:\FR\FM\12FEN1.SGM 12FEN1 6014 Federal Register / Vol. 83, No. 29 / Monday, February 12, 2018 / Notices listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 6, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–02779 Filed 2–9–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14673–001] daltland on DSKBBV9HB2PROD with NOTICES Lock +TM Hydro Friends Fund II; Notice of Surrender of Preliminary Permit Take notice that Lock +TM Hydro Friends Fund II, permittee for the proposed Coffeeville Lock and Dam Hydroelectric Project, has requested that its preliminary permit be terminated. The permit was issued on June 3, 2016, and would have expired on May 31, 2019.1 The project would have been located on the Tombigbee River, in Clark and Choctaw Counties, Alabama. The preliminary permit for Project No. 14673 will remain in effect until the close of business, March 8, 2018. If the Commission is closed on this day, then the permit remains in effect until the close of business on the next day in which the Commission is open.2 New applications for this site may not be submitted until after the permit surrender is effective. 1 154 2 18 FERC ¶ 62,094 (2016). CFR 385.2007(a)(2) (2017). VerDate Sep<11>2014 19:23 Feb 09, 2018 Jkt 244001 Dated: February 6, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–02787 Filed 2–9–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Number: PR18–27–000. Applicants: NorthWestern Corporation. Description: Tariff filing per 284.123(b),(e)/: Revised Rate Schedules for Transportation and Storage Service (D2017.11.86) to be effective 1/1/2018; Filing Type: 980. Filed Date: 1/31/18. Accession Number: 201801315068. Comments/Protests Due: 5 p.m. ET 2/ 21/18. Docket Numbers: RP17–913–002. Applicants: Natural Gas Pipeline Company of America. Description: Compliance filing Compliance Filing. Filed Date: 2/1/18. Accession Number: 20180201–5112. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–408–000. Applicants: Northern Natural Gas Company. Description: § 4(d) Rate Filing: 20180201 Annual PRA to be effective 4/ 1/2018. Filed Date: 2/1/18. Accession Number: 20180201–5041. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–409–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Amendment to Neg Rate Agmt (FPL 41619–17) to be effective 2/1/2018. Filed Date: 2/1/18. Accession Number: 20180201–5071. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–410–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmt (Pivotal 34691 to Sequent 49016) to be effective 2/1/2018. Filed Date: 2/1/18. Accession Number: 20180201–5074. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–411–000. Applicants: Gulf Crossing Pipeline Company LLC. PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmt (Newfield 18 to SW Energy 1945) to be effective 2/2/2018. Filed Date: 2/1/18. Accession Number: 20180201–5088. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–412–000. Applicants: Tennessee Gas Pipeline Company, L.L.C. Description: § 4(d) Rate Filing: Volume No. 2—Neg Rate Nonconforming Mitsui Co Cameron LNG SP326297 to be effective 3/1/2018. Filed Date: 2/1/18. Accession Number: 20180201–5107. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–413–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Neg Rate Agmt (DTE 41614) to be effective 2/1/2018. Filed Date: 2/1/18. Accession Number: 20180201–5111. Comments Due: 5 p.m. ET 2/13/18. Docket Numbers: RP18–414–000. Applicants: Great Lakes Gas Transmission Limited Par. Description: Great Lakes Gas Transmission Limited Partnership submits its Semi-Annual Transporter’s Use Report under RP18–414. Filed Date: 1/31/18. Accession Number: 20180131–5294. Comments Due: 5 p.m. ET 2/12/18. Docket Numbers: RP18–416–000. Applicants: Viking Gas Transmission Company. Description: § 4(d) Rate Filing: Update to Title Page Negotiated Rate Agreements to be effective 3/2/2018. Filed Date: 2/2/18. Accession Number: 20180202–5082. Comments Due: 5 p.m. ET 2/14/18. Docket Numbers: RP18–417–000. Applicants: Trailblazer Pipeline Company LLC. Description: § 4(d) Rate Filing: TPC Administrative Filing to be effective 3/ 5/2018. Filed Date: 2/2/18. Accession Number: 20180202–5119. Comments Due: 5 p.m. ET 2/14/18. Docket Numbers: RP18–418–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: Neg Rate 2018–02–02 BP, CP to be effective 2/3/2018. Filed Date: 2/2/18. Accession Number: 20180202–5165. Comments Due: 5 p.m. ET 2/14/18. Docket Numbers: RP18–419–000. Applicants: Dominion Energy Cove Point LNG, LP. Description: § 4(d) Rate Filing: DECP—Liquefaction Project (CP13–113) E:\FR\FM\12FEN1.SGM 12FEN1

Agencies

[Federal Register Volume 83, Number 29 (Monday, February 12, 2018)]
[Notices]
[Pages 6013-6014]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-02779]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER18-807-000]


Pinal Central Energy Center, LLC; Supplemental Notice That 
Initial Market-Based Rate Filing Includes Request for Blanket Section 
204 Authorization

    This is a supplemental notice in the above-referenced proceeding 
Pinal Central Energy Center, LLC's application for market-based rate 
authority, with an accompanying rate tariff, noting that such 
application includes a request for blanket authorization, under 18 CFR 
part 34, of future issuances of securities and assumptions of 
liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is February 26, 2018.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet 
access who will eFile a document and/or be

[[Page 6014]]

listed as a contact for an intervenor must create and validate an 
eRegistration account using the eRegistration link. Select the eFiling 
link to log on and submit the intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the website that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
[email protected]. or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: February 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-02779 Filed 2-9-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.