Natural Gas Pipeline Company of America LLC; Notice of Schedule for Environmental Review of the Herscher Northwest Storage Field Abandonment Project, 6013 [2018-02778]
Download as PDF
Federal Register / Vol. 83, No. 29 / Monday, February 12, 2018 / Notices
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on February 16, 2018.
Dated: February 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–02780 Filed 2–9–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–12–000]
daltland on DSKBBV9HB2PROD with NOTICES
Natural Gas Pipeline Company of
America LLC; Notice of Schedule for
Environmental Review of the Herscher
Northwest Storage Field Abandonment
Project
On October 31, 2017, Natural Gas
Pipeline Company of America LLC
(Natural) filed an application in Docket
No. CP18–12–000 requesting permission
pursuant to Section 7(b) of the Natural
Gas Act to abandon certain facilities.
The proposed project is known as the
Herscher Northwest Storage Field
Abandonment Project (Project), and is
located in Kankakee County, Illinois.
On November 8, 2017, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
VerDate Sep<11>2014
19:23 Feb 09, 2018
Jkt 244001
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA—April 12, 2018
90-Day Federal Authorization Decision
Deadline—July 11, 2018
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
Natural proposes to abandon in place
injection/withdrawal wells, pipeline
laterals, and observation wells, and
abandon by removal Compressor Station
202 and ancillary aboveground facilities
belonging to its Herscher Northwest
natural gas storage field in Kankakee,
Illinois. Natural would also abandon in
place approximately 15.3 billion cubic
feet of non-recoverable cushion gas.
Background
On January 2, 2018 the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
proposed Herscher Northwest Storage
Field Abandonment Project and Request
for Comments on Environmental Issues
(NOI). The NOI was sent to affected
landowners; federal, state, and local
government agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties; and local libraries
and newspapers. In response to the NOI,
the Commission received comments
from the U.S. Environmental Protection
Agency (EPA). The primary issue raised
by the EPA is potential impacts on
groundwater.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
6013
website (www.ferc.gov). Using the
eLibrary link, select General Search
from the eLibrary menu, enter the
selected date range and Docket Number
excluding the last three digits (i.e.,
CP18–12), and follow the instructions.
For assistance with access to eLibrary,
the helpline can be reached at (866)
208–3676, TTY (202) 502–8659, or at
FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: February 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–02778 Filed 2–9–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–807–000]
Pinal Central Energy Center, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding Pinal
Central Energy Center, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is February 26,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
E:\FR\FM\12FEN1.SGM
12FEN1
Agencies
[Federal Register Volume 83, Number 29 (Monday, February 12, 2018)]
[Notices]
[Page 6013]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-02778]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-12-000]
Natural Gas Pipeline Company of America LLC; Notice of Schedule
for Environmental Review of the Herscher Northwest Storage Field
Abandonment Project
On October 31, 2017, Natural Gas Pipeline Company of America LLC
(Natural) filed an application in Docket No. CP18-12-000 requesting
permission pursuant to Section 7(b) of the Natural Gas Act to abandon
certain facilities. The proposed project is known as the Herscher
Northwest Storage Field Abandonment Project (Project), and is located
in Kankakee County, Illinois.
On November 8, 2017, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA--April 12, 2018
90-Day Federal Authorization Decision Deadline--July 11, 2018
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
Natural proposes to abandon in place injection/withdrawal wells,
pipeline laterals, and observation wells, and abandon by removal
Compressor Station 202 and ancillary aboveground facilities belonging
to its Herscher Northwest natural gas storage field in Kankakee,
Illinois. Natural would also abandon in place approximately 15.3
billion cubic feet of non-recoverable cushion gas.
Background
On January 2, 2018 the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the proposed Herscher Northwest
Storage Field Abandonment Project and Request for Comments on
Environmental Issues (NOI). The NOI was sent to affected landowners;
federal, state, and local government agencies; elected officials;
environmental and public interest groups; Native American tribes; other
interested parties; and local libraries and newspapers. In response to
the NOI, the Commission received comments from the U.S. Environmental
Protection Agency (EPA). The primary issue raised by the EPA is
potential impacts on groundwater.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the eLibrary link, select General
Search from the eLibrary menu, enter the selected date range and Docket
Number excluding the last three digits (i.e., CP18-12), and follow the
instructions. For assistance with access to eLibrary, the helpline can
be reached at (866) 208-3676, TTY (202) 502-8659, or at
[email protected]. The eLibrary link on the FERC website also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: February 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-02778 Filed 2-9-18; 8:45 am]
BILLING CODE 6717-01-P