Combined Notice of Filings #1, 5617-5619 [2018-02531]
Download as PDF
5617
Federal Register / Vol. 83, No. 27 / Thursday, February 8, 2018 / Notices
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, telephone
at (202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Title: Electric Fees, Annual Charges,
Waivers, and Exemptions.
OMB Control No.: 1902–0132
Type of Request: Three-year extension
of the FERC–582 information collection
requirements with no changes to the
current reporting requirements.
Abstract: The information required by
FERC–582 is contained within 18 Code
of Federal Regulations (CFR) Part 381 1
and Part 382.2
The Commission uses the FERC–582
to implement the statutory provisions of
the Independent Offices Appropriation
Act of 1952 (IOAA) 3 which authorizes
the Commission to establish fees for its
services. In addition, the Omnibus
Budget Reconciliation Act of 1986
(OBRA) 4 authorizes the Commission to
assess and collect fees and annual
charges in any fiscal year in amounts
equal to all the costs incurred by the
Commission in that fiscal year.
To comply with the FERC–582
respondents submit to the Commission
the sum of the megawatt-hours (MWh)
of all unbundled transmission
(including MWh delivered in wheeling
transactions and MWh delivered in
exchange transactions) and the
megawatt-hours of all bundled
wholesale power sales (to the extent the
bundled wholesale power sales were not
separately reported as unbundled
transmission). The data collected within
the FERC–582 is drawn directly from
the FERC Form 1 5 transmission data.
The Commission sums the costs of its
electric regulatory program and
subtracts all electric regulatory program
filing fee collections to determine the
total collectible electric regulatory
program costs. Then, the Commission
uses the data submitted under FERC–
582 to determine the total megawatthours of transmission of electric energy
in interstate commerce.
Respondents (e.g. public utilities,
power marketers) subject to these
annual charges must submit FERC–582
data to the Commission by April 30 of
each year.6 The Commission issues bills
for annual charges to respondents.
Then, respondents must pay the charges
within 45 days of the Commission’s
issuance of the bill.
Respondents file requests for waivers
and exemptions of fees and charges 7
based on need. The Commission’s staff
uses the filer’s financial information to
evaluate the request for a waiver or
exemption of the obligation to pay a fee
or an annual charge.
Estimate of Annual Burden: 8 The
Commission estimates the total Public
Reporting Burden for this information
collection as:
FERC–82—ELECTRIC FEES; ANNUAL CHARGES; WAIVERS; AND EXEMPTIONS
Number of
respondents
Annual
number of
responses per
respondent
Total
number of
responses
Average burden cost
per
response
Total annual burden
hours & total annual
Cost per
respondent
(1)
(2)
(1) × (2) = (3)
(4)
(3) * (4) = (5)
(5) / (1) = (5)
1 hour; $76.50 ...........
67 hours; $5,125.50 ..
FERC–582 9 .................
67
1
daltland on DSKBBV9HB2PROD with NOTICES
The total estimated annual cost
burden to respondents is $5,125.50 [67
hours * $76.50/hour 10 = $5,125.50]
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
1 Title 18 CFR, Sections 381.105, 381.106,
381.108, 381.302, and 381.305.
2 Title 18 CFR, Sections 382.102, 382.103,
382.105, 382.106, and 382.201.
3 31 U.S.C. 9701.
4 42 U.S.C. 7178.
5 Annual Report of Major Electric Utility (OMB
Control No. 1902–0021).
6 18 CFR 382.201.
VerDate Sep<11>2014
17:18 Feb 07, 2018
Jkt 244001
67
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: February 2, 2018.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
CFR 381 and 382.
is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
explanation of what is included in the information
collection burden, refer to 5 Code of Federal
Regulations 1320.3.
9 Includes requirements of 18 CFR Part 381.105
(methods of payment), Part 381.106 (waiver), Part
8 Burden
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
[FR Doc. 2018–02533 Filed 2–7–18; 8:45 am]
7 18
$76.50
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–51–000.
Applicants: MDU Resources Group,
Inc.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of MDU Resources
Group, Inc.
Filed Date: 1/31/18.
381.108 (exemption), Part 381.302 (declaratory
order), Part 381.303 (review of DOE remedial order),
Part 381.304 (DOE denial of adjustment, and Part
381.305 (OGC interpretation).
10 The Commission staff thinks that the average
respondent for this collection is similarly situated
to the Commission, in terms of salary plus benefits.
Based upon FERC’s 2017 annual average of
$158,754 (for salary plus benefits), the average
hourly cost is $76.50/hour.
E:\FR\FM\08FEN1.SGM
08FEN1
daltland on DSKBBV9HB2PROD with NOTICES
5618
Federal Register / Vol. 83, No. 27 / Thursday, February 8, 2018 / Notices
Accession Number: 20180131–5295.
Comments Due: 5 p.m. ET 2/21/18.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–40–000.
Applicants: Upstream Wind Energy
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Upstream Wind
Energy LLC.
Filed Date: 2/2/18.
Accession Number: 20180202–5044.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: EG18–41–000.
Applicants: New Mexico Wind, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of New Mexico Wind,
LLC.
Filed Date: 2/2/18.
Accession Number: 20180202–5054.
Comments Due: 5 p.m. ET 2/23/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–752–001.
Applicants: Duke Energy Carolinas,
LLC.
Description: Tariff Amendment:
Amendments to CEPCI NITSA (SA No.
447) and Meter Agreement (SA No. 448)
to be effective 1/1/2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5021.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18–780–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Notices of Cancellation of GIAs &
Service Agreements SunEdison LLC to
be effective 4/4/2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5001.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18–781–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended LGIA RE Gaskell West, RE
Gaskell West 1, RE Gaskell West 2, SA
No. 184 to be effective 2/3/2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5002.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18–782–000.
Applicants: American Transmission
Systems, Incorporated, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ATSI submits Revised Interconnection
Agreement No. 3994 to be effective 4/4/
2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5020.
VerDate Sep<11>2014
17:18 Feb 07, 2018
Jkt 244001
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18–783–000.
Applicants: MISO Transmission
Owners.
Description: Expedited Petition of the
certain MISO Transmission Owners for
Waiver of Tariff Provisions and
Shortened Answer Date.
Filed Date: 2/1/18.
Accession Number: 20180201–5136.
Comments Due: 5 p.m. ET 2/22/18.
Docket Numbers: ER18–784–000.
Applicants: Upstream Wind Energy
LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization to be effective 4/4/2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5022.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18–784–001.
Applicants: Upstream Wind Energy
LLC.
Description: Tariff Amendment:
Supplement to Application for MarketBased Rate Authorization to be effective
4/4/2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5060.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18–785–000.
Applicants: Public Service Company
of New Hampshire.
Description: § 205(d) Rate Filing:
Large Interconnection Agreement with
GSP Newington Station to be effective
1/10/2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5070.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18–786–000.
Applicants: Public Service Company
of New Hampshire.
Description: § 205(d) Rate Filing:
Large Interconnection Agreement with
GSP White Lake to be effective 1/10/
2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5072.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18–787–000.
Applicants: Public Service Company
of New Hampshire.
Description: § 205(d) Rate Filing:
Small Interconnection Agreement with
GSP Lost Nation to be effective 1/10/
2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5074.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18–788–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Consumers Energy Company.
Description: § 205(d) Rate Filing:
2018–02–02 Consumers Attachment O
Filing re Settlement in ER16–1188;
ER17–1655 to be effective 3/31/2018.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
Filed Date: 2/2/18.
Accession Number: 20180202–5085.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18–789–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA No.
4822; Queue AC1–019 to be effective 3/
23/2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5086.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18–790–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing: 2–2–
18 Unexecuted Agreement, City and
County of San Francisco WDT (SA 27 to
be effective 2/3/2018.
Filed Date: 2/2/18.
Accession Number: 20180202–5120.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18–791–000.
Applicants: Massachusetts Electric
Company.
Description: Tariff Cancellation:
Notice of Cancellation of Service Agmt
IA–MECO–31–01 & Notice Waiver
Request to be effective 12/21/2016.
Filed Date: 2/2/18.
Accession Number: 20180202–5123.
Comments Due: 5 p.m. ET 2/23/18.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH18–5–000.
Applicants: Cross & Company, PLLC.
Description: GEP Bison Holdings, Inc.
submits FERC 65–A Exemption
Notification.
Filed Date: 2/1/18.
Accession Number: 20180201–5154.
Comments Due: 5 p.m. ET 2/22/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\08FEN1.SGM
08FEN1
Federal Register / Vol. 83, No. 27 / Thursday, February 8, 2018 / Notices
Dated: February 2, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–02531 Filed 2–7–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP18–37–000; CP18–38–000]
daltland on DSKBBV9HB2PROD with NOTICES
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Sierrita Gas Pipeline LLC
Sierrita Compressor Expansion Project
and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Sierrita Compressor Expansion
Project involving construction and
operation of facilities by Sierrita Gas
Pipeline LLC (Sierrita) in Pima County,
Arizona. The Commission will use this
EA in its decision-making process to
determine whether the project is in the
public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
You can make a difference by providing
us with your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. To ensure that your
comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before March 5,
2018.
If you sent comments on this project
to the Commission before the opening of
this docket on December 21, 2017, you
will need to file those comments in
Docket No. CP18–37–000 to ensure they
are considered as part of this
proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
VerDate Sep<11>2014
17:18 Feb 07, 2018
Jkt 244001
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
Sierrita provided landowners with a
fact sheet prepared by the FERC entitled
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need To Know?’’
This fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is also available for
viewing on the FERC website
(www.ferc.gov).
Public Participation
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has expert staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on eRegister. If you are filing a
comment on a particular project, please
select ‘‘Comment on a Filing’’ as the
filing type; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (CP18–37–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Summary of the Proposed Project
Sierrita proposes to construct and
operate new natural gas compression,
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
5619
metering, and pipeline facilities on its
existing Line No. 2177 in Pima County,
Arizona. Sierrita is also requesting
approval to amend its existing Natural
Gas Act Section 3 authorization and
Presidential Permit for the project’s
increased capacity. Specifically, the
project would increase Sierrita’s
authorized capacity of its existing
international border crossing near
Sasabe, Arizona from approximately
200,846 Dekatherms per day to 631,389
Dekatherms per day (627,000,000 cubic
feet per day).
The Sierrita Compressor Expansion
Project would consist of the following
facilities, all in Pima County:
• One new 15,900 horsepower
compressor station (Sierrita Compressor
Station);
• suction and discharge piping and
various station yard auxiliary facilities
to connect the Sierrita Compressor
Station with Line No. 2177;
• one new 10-inch Ultrasonic meter
at the existing San Joaquin Meter
Station on Line No. 2177; and
• the relocation of the existing
‘‘Mainline Valve 2’’ and an associated
inspection tool launcher and receiver
from milepost 1.2 to milepost 6.5 on
Line No. 2177.
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 18.7 acres of land
for the aboveground and auxiliary
facilities. Following construction,
Sierrita would maintain about 15.7 acres
for permanent operation of the
compressor station including station
piping and auxiliary facilities, and
about 1.1 acres for operation of the
mainline valve. The remaining acreage
would be restored and revert to former
uses.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 2 to
discover and address concerns the
public may have about proposals. This
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called eLibrary or from the
Commission’s Public Reference Room, 888 First
Street NE, Washington, DC 20426, or call (202) 502–
8371. For instructions on connecting to eLibrary,
refer to the last page of this notice.
2 We, us, and our refer to the environmental staff
of the Commission’s Office of Energy Projects.
E:\FR\FM\08FEN1.SGM
08FEN1
Agencies
[Federal Register Volume 83, Number 27 (Thursday, February 8, 2018)]
[Notices]
[Pages 5617-5619]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-02531]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-51-000.
Applicants: MDU Resources Group, Inc.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of MDU Resources Group, Inc.
Filed Date: 1/31/18.
[[Page 5618]]
Accession Number: 20180131-5295.
Comments Due: 5 p.m. ET 2/21/18.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG18-40-000.
Applicants: Upstream Wind Energy LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Upstream Wind Energy LLC.
Filed Date: 2/2/18.
Accession Number: 20180202-5044.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: EG18-41-000.
Applicants: New Mexico Wind, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of New Mexico Wind, LLC.
Filed Date: 2/2/18.
Accession Number: 20180202-5054.
Comments Due: 5 p.m. ET 2/23/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-752-001.
Applicants: Duke Energy Carolinas, LLC.
Description: Tariff Amendment: Amendments to CEPCI NITSA (SA No.
447) and Meter Agreement (SA No. 448) to be effective 1/1/2018.
Filed Date: 2/2/18.
Accession Number: 20180202-5021.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18-780-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Notices of Cancellation of
GIAs & Service Agreements SunEdison LLC to be effective 4/4/2018.
Filed Date: 2/2/18.
Accession Number: 20180202-5001.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18-781-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Amended LGIA RE Gaskell
West, RE Gaskell West 1, RE Gaskell West 2, SA No. 184 to be effective
2/3/2018.
Filed Date: 2/2/18.
Accession Number: 20180202-5002.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18-782-000.
Applicants: American Transmission Systems, Incorporated, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: ATSI submits Revised
Interconnection Agreement No. 3994 to be effective 4/4/2018.
Filed Date: 2/2/18.
Accession Number: 20180202-5020.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18-783-000.
Applicants: MISO Transmission Owners.
Description: Expedited Petition of the certain MISO Transmission
Owners for Waiver of Tariff Provisions and Shortened Answer Date.
Filed Date: 2/1/18.
Accession Number: 20180201-5136.
Comments Due: 5 p.m. ET 2/22/18.
Docket Numbers: ER18-784-000.
Applicants: Upstream Wind Energy LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization to be effective 4/4/2018.
Filed Date: 2/2/18.
Accession Number: 20180202-5022.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18-784-001.
Applicants: Upstream Wind Energy LLC.
Description: Tariff Amendment: Supplement to Application for
Market-Based Rate Authorization to be effective 4/4/2018.
Filed Date: 2/2/18.
Accession Number: 20180202-5060.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18-785-000.
Applicants: Public Service Company of New Hampshire.
Description: Sec. 205(d) Rate Filing: Large Interconnection
Agreement with GSP Newington Station to be effective 1/10/2018.
Filed Date: 2/2/18.
Accession Number: 20180202-5070.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18-786-000.
Applicants: Public Service Company of New Hampshire.
Description: Sec. 205(d) Rate Filing: Large Interconnection
Agreement with GSP White Lake to be effective 1/10/2018.
Filed Date: 2/2/18.
Accession Number: 20180202-5072.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18-787-000.
Applicants: Public Service Company of New Hampshire.
Description: Sec. 205(d) Rate Filing: Small Interconnection
Agreement with GSP Lost Nation to be effective 1/10/2018.
Filed Date: 2/2/18.
Accession Number: 20180202-5074.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18-788-000.
Applicants: Midcontinent Independent System Operator, Inc.,
Consumers Energy Company.
Description: Sec. 205(d) Rate Filing: 2018-02-02 Consumers
Attachment O Filing re Settlement in ER16-1188; ER17-1655 to be
effective 3/31/2018.
Filed Date: 2/2/18.
Accession Number: 20180202-5085.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18-789-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of WMPA
No. 4822; Queue AC1-019 to be effective 3/23/2018.
Filed Date: 2/2/18.
Accession Number: 20180202-5086.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18-790-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: 2-2-18 Unexecuted Agreement,
City and County of San Francisco WDT (SA 27 to be effective 2/3/2018.
Filed Date: 2/2/18.
Accession Number: 20180202-5120.
Comments Due: 5 p.m. ET 2/23/18.
Docket Numbers: ER18-791-000.
Applicants: Massachusetts Electric Company.
Description: Tariff Cancellation: Notice of Cancellation of Service
Agmt IA-MECO-31-01 & Notice Waiver Request to be effective 12/21/2016.
Filed Date: 2/2/18.
Accession Number: 20180202-5123.
Comments Due: 5 p.m. ET 2/23/18.
Take notice that the Commission received the following public
utility holding company filings:
Docket Numbers: PH18-5-000.
Applicants: Cross & Company, PLLC.
Description: GEP Bison Holdings, Inc. submits FERC 65-A Exemption
Notification.
Filed Date: 2/1/18.
Accession Number: 20180201-5154.
Comments Due: 5 p.m. ET 2/22/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
[[Page 5619]]
Dated: February 2, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-02531 Filed 2-7-18; 8:45 am]
BILLING CODE 6717-01-P