Brookfield White Pine Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 5415 [2018-02410]
Download as PDF
Federal Register / Vol. 83, No. 26 / Wednesday, February 7, 2018 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 11834–066]
sradovich on DSK3GMQ082PROD with NOTICES
Brookfield White Pine Hydro, LLC;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Federal Energy Regulatory
Commission and is available for public
inspection:
a. Type of Application: Amendment
of Project License.
b. Project No: 11834–066.
c. Date Filed: September 18, 2017 and
January 31, 2018.
d. Applicant: Brookfield White Pine
Hydro, LLC (licensee).
e. Name of Project: Upper and Middle
Dams Storage Hydroelectric Project.
f. Location: The project is located on
the Rapid River in Oxford and Franklin
counties, Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Kelly Maloney,
License Compliance Manager,
Brookfield White Pine Hydro, LLC, 150
Main Street Lewiston, ME 04240.
kelly.maloney@
brookfieldrenewable.com.
i. FERC Contact: Michael Calloway at
202–502–8041, or michael.calloway@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file motions to intervene,
protests, and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–11834–066.
k. Description of Request: The
licensee requests that the Commission
amend the project license to change the
Angler Use Survey schedule and
include a new Water Quality Certificate
VerDate Sep<11>2014
18:17 Feb 06, 2018
Jkt 244001
issued by the State of Maine on the
January 31, 2018. The Water Quality
Certificate was amended to reflect the
change in the Angler Use Survey
schedule. Under the proposal, Lake
Angler Surveys at Richardson and
Mooselookmeguntic Lakes will be
conducted in 2019, then next in 2024
and every five years thereafter. The
River Surveys at Upper Dam Pool, Rapid
River, and Magalloway River will be
conducted in 2021, and again in 2026,
and every five years thereafter.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
202–502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call 202–502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’; ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
5415
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the amendment
application. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: February 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–02410 Filed 2–6–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–772–000]
New Mexico Wind, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding New
Mexico Wind, LLC‘s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
E:\FR\FM\07FEN1.SGM
07FEN1
Agencies
[Federal Register Volume 83, Number 26 (Wednesday, February 7, 2018)]
[Notices]
[Page 5415]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-02410]
[[Page 5415]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 11834-066]
Brookfield White Pine Hydro, LLC; Notice of Application Accepted
for Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Federal Energy Regulatory Commission and is available
for public inspection:
a. Type of Application: Amendment of Project License.
b. Project No: 11834-066.
c. Date Filed: September 18, 2017 and January 31, 2018.
d. Applicant: Brookfield White Pine Hydro, LLC (licensee).
e. Name of Project: Upper and Middle Dams Storage Hydroelectric
Project.
f. Location: The project is located on the Rapid River in Oxford
and Franklin counties, Maine.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Kelly Maloney, License Compliance Manager,
Brookfield White Pine Hydro, LLC, 150 Main Street Lewiston, ME 04240.
[email protected].
i. FERC Contact: Michael Calloway at 202-502-8041, or
[email protected].
j. Deadline for filing comments, motions to intervene, and protests
is 30 days from the issuance of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file motions
to intervene, protests, and comments using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426. The first page of any filing should
include docket number P-11834-066.
k. Description of Request: The licensee requests that the
Commission amend the project license to change the Angler Use Survey
schedule and include a new Water Quality Certificate issued by the
State of Maine on the January 31, 2018. The Water Quality Certificate
was amended to reflect the change in the Angler Use Survey schedule.
Under the proposal, Lake Angler Surveys at Richardson and
Mooselookmeguntic Lakes will be conducted in 2019, then next in 2024
and every five years thereafter. The River Surveys at Upper Dam Pool,
Rapid River, and Magalloway River will be conducted in 2021, and again
in 2026, and every five years thereafter.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC
20426, or by calling 202-502-8371. This filing may also be viewed on
the Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 866-208-3676 or email
[email protected], for TTY, call 202-502-8659. A copy is also
available for inspection and reproduction at the address in item (h)
above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS''; ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to the amendment application. Agencies may obtain copies of the
application directly from the applicant. A copy of any protest or
motion to intervene must be served upon each representative of the
applicant specified in the particular application. If an intervener
files comments or documents with the Commission relating to the merits
of an issue that may affect the responsibilities of a particular
resource agency, they must also serve a copy of the document on that
resource agency. A copy of all other filings in reference to this
application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Dated: February 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-02410 Filed 2-6-18; 8:45 am]
BILLING CODE 6717-01-P