Commission Information Collection Activities (Ferc-725x); Comment Request; Extension, 5416-5417 [2018-02408]
Download as PDF
5416
Federal Register / Vol. 83, No. 26 / Wednesday, February 7, 2018 / Notices
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is February 21,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: February 1, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–02407 Filed 2–6–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC18–9–000]
Commission Information Collection
Activities (Ferc–725x); Comment
Request; Extension
Federal Energy Regulatory
Commission.
ACTION: Notice of information collection
and request for comments.
sradovich on DSK3GMQ082PROD with NOTICES
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the currently
approved information collection, FERC–
SUMMARY:
VerDate Sep<11>2014
18:17 Feb 06, 2018
Jkt 244001
725X (Mandatory Reliability Standards:
Voltage and Reactive (VAR) Standards).
DATES: Comments on the collection of
information are due April 9, 2018.
ADDRESSES: You may submit comments
(identified by Docket No. IC18–9–000)
by either of the following methods:
• eFiling at Commission’s website:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, telephone
at (202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION: Title:
FERC–725X, Mandatory Reliability
Standards: Voltage and Reactive (VAR)
Standards.
OMB Control No.: 1902–0278.
Type of Request: Three-year extension
of the FERC–725X information
collection requirements with no changes
to the current reporting requirements.
Abstract: Pursuant to Section 215 of
the Federal Power Act (FPA), NERC
established the Voltage and Reactive
(‘‘VAR’’) group of Reliability Standards,
which consists of two continent-wide
Reliability Standards, VAR–001–4 and
VAR–002–3. These two standards were
designed to maintain voltage stability on
the Bulk-Power System, protect
transmission, generation, distribution,
and customer equipment, and support
the reliable operation of the Bulk-Power
System. Voltage stability is the ability of
a power system to maintain acceptable
voltage levels throughout the system
under normal operating conditions and
following a disturbance. Failure to
maintain acceptable voltage levels (i.e.,
voltage levels become too high or too
low) may cause violations of System
Operating Limits (‘‘SOLs’’) and
Interconnection Reliability Operating
Limits (‘‘IROLs’’), result in damage to
Bulk-Power System equipment, and
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
thereby threaten the reliable operation
of the Bulk-Power System.
Reliability Standard VAR–001–4 1
• Specify a system-wide voltage
schedule (which is either a range or a
target value with an associated tolerance
band) as part of its plan to operate
within SOLs and IROLs, and to provide
the voltage schedule to its Reliability
Coordinator and adjacent Transmission
Operators upon request (Requirement
R1);
• Schedule sufficient reactive
resources to regulate voltage levels
(Requirement R2);
• Operate or direct the operation of
devices to regulate transmission voltage
and reactive flows (Requirement R3);
• Develop a set of criteria to exempt
generators from certain requirements
under Reliability Standard VAR–002–3
related to voltage or Reactive Power
schedules, automatic voltage
regulations, and notification
(Requirement R4);
• Specify a voltage or Reactive Power
schedule (which is either a range or a
target value with an associated tolerance
band) for generators at either the high or
low voltage side of the generator stepup transformer, provide the schedule to
the associated Generator Operator,
direct the Generator Operator to comply
with that schedule in automatic voltage
control mode, provide the Generator
Operator the notification requirements
for deviating from the schedule, and, if
requested, provide the Generator
Operator the criteria used to develop the
schedule (Requirement R5); and
• Communicate step-up transformer
tap changes, the time frame for
completion, and the justification for
these changes to Generator Owners
(Requirement R6).
Reliability Standard VAR–002–3 2
• Operate each of its generators
connected to the interconnected
transmission system in automatic
voltage control mode or in a different
control mode as instructed by the
Transmission Operator, unless the
Generator Operator (1) is exempted
pursuant to the criteria developed under
VAR–001–4, Requirement R4, or (2)
makes certain notifications to the
Transmission Operator specifying the
reasons it cannot so operate
(Requirement R1);
• Maintain the Transmission
Operator’s generator voltage or Reactive
Power schedule, unless the Generator
Operator (1) is exempted pursuant to the
criteria developed under VAR–001–4,
1 Applies
2 Applies
E:\FR\FM\07FEN1.SGM
to transmission operators only.
to transmission operators only.
07FEN1
5417
Federal Register / Vol. 83, No. 26 / Wednesday, February 7, 2018 / Notices
Requirement R4, or (2) complies with
the notification requirements for
deviations as established by the
Transmission Owner pursuant to VAR–
001–4, Requirement R5 (Requirement
R2);
• Notify the Transmission Operator of
a change in status of its voltage
controlling device within 30 minutes,
unless the status is restored within that
time period (Requirement R3); and
• Notify the Transmission Operator of
a change in reactive capability due to
factors other than those described in
VAR–002–3, Requirement R3 within 30
minutes unless the capability has been
restored during that time period
(Requirement R4).
• Provide information on its step-up
transformers and auxiliary transformers
within 30 days of a request from the
Transmission Operator or Transmission
Planner (Requirement R5); and
• Comply with the Transmission
Operator’s step-up transformer tap
change directives unless compliance
would violate safety, an equipment
rating, or applicable laws, rules or
regulations (Requirement R6).
Type of Respondents: Generator
owners and transmission operators.
Estimate of Annual Burden 3: The
Commission estimates the annual public
reporting burden for the information
collection as:
FERC–725X, MANDATORY RELIABILITY STANDARDS: VOLTAGE AND REACTIVE (VAR) STANDARDS
Number of
respondents 4
Annual
number of
responses per
respondent
Total number
of responses
Average
burden and cost
per response 5
Total annual burden
hours and total annual
cost
Cost per
respondent ($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
160 hrs.; .........................
$10,899.20 .....................
80 hrs.; ...........................
5,449.60 .........................
120 hrs.; .........................
8,174.40 .........................
28,960 hrs.; ....................
$1,972,755 .....................
75,520 hrs.; ....................
5,144,422 .......................
113,280 hrs.; ..................
7,716,634 .......................
217,760 hrs.; ..................
14,833,811 .....................
.
VAR–001–4 .............
(Requirement R1) ...
VAR–002–3 .............
(Requirement R1) ...
VAR–002–3 .............
(Requirement R2) ...
181 (TOP) ......
1
181
944 (GOP) .....
1
944
944 (GOP) .....
1
944
Total .................
........................
1,932
........................
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: February 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–02408 Filed 2–6–18; 8:45 am]
sradovich on DSK3GMQ082PROD with NOTICES
BILLING CODE 6717–01–P
3 The Commission defines burden as the total
time, effort, or financial resources expended by
persons to generate, maintain, retain, or disclose or
provide information to or for a Federal agency. For
further explanation of what is included in the
VerDate Sep<11>2014
18:17 Feb 06, 2018
Jkt 244001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR18–26–000.
Applicants: Southern California Gas
Company.
Description: Tariff filing per
284.123(b),(e)+(g): OSHD Rate Revision
Filing to be effective 1/1/2018.
Filed Date: 1/30/18.
Accession Number: 201801305012.
Comments Due: 5 p.m. ET 2/20/18.
284.123(g) Protests Due: 5 p.m. ET 4/
2/18.
Docket Number: PR17–60–001.
Applicants: Atmos Pipeline-Texas.
Description: Tariff filing per
284.123(b),(e)/: Amendment to Non
Statutory Filing Jan 2018.
Filed Date: 1/25/18.
Accession Number: 201801255005.
Comments/Protests Due: 5 p.m. ET 2/
15/18.
Docket Number: PR17–60–002.
information collection burden, reference 5 Code of
Federal Regulations 1320.3.
4 TOP = transmission operator; GOP = generator
operators.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
$10,899.20
5,449.60
8,174.40
Applicants: Atmos Pipeline-Texas.
Description: Tariff filing per
284.123(b),(e)/: Amendment to Non
Statutory Filing Jan 2018 to be effective
9/1/2017.
Filed Date: 1/25/18.
Accession Number: 201801255165.
Comments/Protests Due: 5 p.m. ET 2/
15/18.
Docket Numbers: RP18–374–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Compliance filing
Second Compliance Filing in Docket
No. CP15–517–000 to be effective 2/1/
2018.
Filed Date: 1/30/18.
Accession Number: 20180130–5009.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: RP18–375–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2018–01–30 Antero to be effective
2/1/2018.
Filed Date: 1/30/18.
Accession Number: 20180130–5155.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: RP18–376–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing:
Amended Negotiated Rate Agreement5 The estimate for hourly cost is $68.12/hour.
This figure is the average salary plus benefits for an
electrical engineer (Occupation Code: 17–2071)
from the Bureau of Labor Statistics at https://
www.bls.gov/oes/current/naics2_22.htm.
E:\FR\FM\07FEN1.SGM
07FEN1
Agencies
[Federal Register Volume 83, Number 26 (Wednesday, February 7, 2018)]
[Notices]
[Pages 5416-5417]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-02408]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. IC18-9-000]
Commission Information Collection Activities (Ferc-725x); Comment
Request; Extension
AGENCY: Federal Energy Regulatory Commission.
ACTION: Notice of information collection and request for comments.
-----------------------------------------------------------------------
SUMMARY: In compliance with the requirements of the Paperwork Reduction
Act of 1995, the Federal Energy Regulatory Commission (Commission or
FERC) is soliciting public comment on the currently approved
information collection, FERC-725X (Mandatory Reliability Standards:
Voltage and Reactive (VAR) Standards).
DATES: Comments on the collection of information are due April 9, 2018.
ADDRESSES: You may submit comments (identified by Docket No. IC18-9-
000) by either of the following methods:
eFiling at Commission's website: https://www.ferc.gov/docs-filing/efiling.asp.
Mail/Hand Delivery/Courier: Federal Energy Regulatory
Commission, Secretary of the Commission, 888 First Street NE,
Washington, DC 20426.
Instructions: All submissions must be formatted and filed in
accordance with submission guidelines at: https://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support
by email at [email protected], or by phone at: (866) 208-3676
(toll-free), or (202) 502-8659 for TTY.
Docket: Users interested in receiving automatic notification of
activity in this docket or in viewing/downloading comments and
issuances in this docket may do so at https://www.ferc.gov/docs-filing/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email
at [email protected], telephone at (202) 502-8663, and fax at
(202) 273-0873.
SUPPLEMENTARY INFORMATION: Title: FERC-725X, Mandatory Reliability
Standards: Voltage and Reactive (VAR) Standards.
OMB Control No.: 1902-0278.
Type of Request: Three-year extension of the FERC-725X information
collection requirements with no changes to the current reporting
requirements.
Abstract: Pursuant to Section 215 of the Federal Power Act (FPA),
NERC established the Voltage and Reactive (``VAR'') group of
Reliability Standards, which consists of two continent-wide Reliability
Standards, VAR-001-4 and VAR-002-3. These two standards were designed
to maintain voltage stability on the Bulk-Power System, protect
transmission, generation, distribution, and customer equipment, and
support the reliable operation of the Bulk-Power System. Voltage
stability is the ability of a power system to maintain acceptable
voltage levels throughout the system under normal operating conditions
and following a disturbance. Failure to maintain acceptable voltage
levels (i.e., voltage levels become too high or too low) may cause
violations of System Operating Limits (``SOLs'') and Interconnection
Reliability Operating Limits (``IROLs''), result in damage to Bulk-
Power System equipment, and thereby threaten the reliable operation of
the Bulk-Power System.
Reliability Standard VAR-001-4 \1\
---------------------------------------------------------------------------
\1\ Applies to transmission operators only.
---------------------------------------------------------------------------
Specify a system-wide voltage schedule (which is either a
range or a target value with an associated tolerance band) as part of
its plan to operate within SOLs and IROLs, and to provide the voltage
schedule to its Reliability Coordinator and adjacent Transmission
Operators upon request (Requirement R1);
Schedule sufficient reactive resources to regulate voltage
levels (Requirement R2);
Operate or direct the operation of devices to regulate
transmission voltage and reactive flows (Requirement R3);
Develop a set of criteria to exempt generators from
certain requirements under Reliability Standard VAR-002-3 related to
voltage or Reactive Power schedules, automatic voltage regulations, and
notification (Requirement R4);
Specify a voltage or Reactive Power schedule (which is
either a range or a target value with an associated tolerance band) for
generators at either the high or low voltage side of the generator
step-up transformer, provide the schedule to the associated Generator
Operator, direct the Generator Operator to comply with that schedule in
automatic voltage control mode, provide the Generator Operator the
notification requirements for deviating from the schedule, and, if
requested, provide the Generator Operator the criteria used to develop
the schedule (Requirement R5); and
Communicate step-up transformer tap changes, the time
frame for completion, and the justification for these changes to
Generator Owners (Requirement R6).
Reliability Standard VAR-002-3 \2\
---------------------------------------------------------------------------
\2\ Applies to transmission operators only.
---------------------------------------------------------------------------
Operate each of its generators connected to the
interconnected transmission system in automatic voltage control mode or
in a different control mode as instructed by the Transmission Operator,
unless the Generator Operator (1) is exempted pursuant to the criteria
developed under VAR-001-4, Requirement R4, or (2) makes certain
notifications to the Transmission Operator specifying the reasons it
cannot so operate (Requirement R1);
Maintain the Transmission Operator's generator voltage or
Reactive Power schedule, unless the Generator Operator (1) is exempted
pursuant to the criteria developed under VAR-001-4,
[[Page 5417]]
Requirement R4, or (2) complies with the notification requirements for
deviations as established by the Transmission Owner pursuant to VAR-
001-4, Requirement R5 (Requirement R2);
Notify the Transmission Operator of a change in status of
its voltage controlling device within 30 minutes, unless the status is
restored within that time period (Requirement R3); and
Notify the Transmission Operator of a change in reactive
capability due to factors other than those described in VAR-002-3,
Requirement R3 within 30 minutes unless the capability has been
restored during that time period (Requirement R4).
Provide information on its step-up transformers and
auxiliary transformers within 30 days of a request from the
Transmission Operator or Transmission Planner (Requirement R5); and
Comply with the Transmission Operator's step-up
transformer tap change directives unless compliance would violate
safety, an equipment rating, or applicable laws, rules or regulations
(Requirement R6).
Type of Respondents: Generator owners and transmission operators.
Estimate of Annual Burden \3\: The Commission estimates the annual
public reporting burden for the information collection as:
---------------------------------------------------------------------------
\3\ The Commission defines burden as the total time, effort, or
financial resources expended by persons to generate, maintain,
retain, or disclose or provide information to or for a Federal
agency. For further explanation of what is included in the
information collection burden, reference 5 Code of Federal
Regulations 1320.3.
FERC-725X, Mandatory Reliability Standards: Voltage and Reactive (VAR) Standards
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Annual number
Number of respondents \4\ of responses Total number Average burden and cost per response Total annual burden hours and total Cost per
per respondent of responses \5\ annual cost respondent ($)
(1)....................... (2) (1) * (2) = (4)................................... (3) * (4) = (5)....................... (5) / (1)
(3)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
VAR-001-4........................... 181 (TOP)................. 1 181 160 hrs.;............................. 28,960 hrs.;.......................... $10,899.20
(Requirement R1).................... $10,899.20............................ $1,972,755............................
VAR-002-3........................... 944 (GOP)................. 1 944 80 hrs.;.............................. 75,520 hrs.;.......................... 5,449.60
(Requirement R1).................... 5,449.60.............................. 5,144,422.............................
VAR-002-3........................... 944 (GOP)................. 1 944 120 hrs.;............................. 113,280 hrs.;......................... 8,174.40
(Requirement R2).................... 8,174.40.............................. 7,716,634.............................
-----------------------------------------------------------------------------------------------------------------------------------------------------------
Total........................... .......................... 1,932 .............. 217,760 hrs.;......................... ......................................
14,833,811............................
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Comments: Comments are invited on: (1) Whether the collection of
information is necessary for the proper performance of the functions of
the Commission, including whether the information will have practical
utility; (2) the accuracy of the agency's estimate of the burden and
cost of the collection of information, including the validity of the
methodology and assumptions used; (3) ways to enhance the quality,
utility and clarity of the information collection; and (4) ways to
minimize the burden of the collection of information on those who are
to respond, including the use of automated collection techniques or
other forms of information technology.
---------------------------------------------------------------------------
\4\ TOP = transmission operator; GOP = generator operators.
\5\ The estimate for hourly cost is $68.12/hour. This figure is
the average salary plus benefits for an electrical engineer
(Occupation Code: 17-2071) from the Bureau of Labor Statistics at
https://www.bls.gov/oes/current/naics2_22.htm.
Dated: February 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-02408 Filed 2-6-18; 8:45 am]
BILLING CODE 6717-01-P