Water Facilities Authority a Joint Power Agency; Notice of Application for Surrender of Exemption, Soliciting Comments, Motions To Intervene, and Protests, 5095-5096 [2018-02230]

Download as PDF Federal Register / Vol. 83, No. 24 / Monday, February 5, 2018 / Notices Street, Hamilton, MT 59840; phone: 406–384–0080. FERC Contact: Monir Chowdhury; phone: (202) 502–6736. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–14865–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14865) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: January 30, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–02242 Filed 2–2–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission sradovich on DSK3GMQ082PROD with NOTICES [Project No. 10532–006] Water Facilities Authority a Joint Power Agency; Notice of Application for Surrender of Exemption, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Proceeding: Application for surrender of conduit exemption. VerDate Sep<11>2014 18:08 Feb 02, 2018 Jkt 244001 b. Project No.: 10532–006. c. Date Filed: January 18, 2018. d. Licensee: Water Facilities Authority a Joint Power Agency (WFA–JPA). e. Name of Project: WFA–JPA Regional Water Supply Energy Recovery Facilities Project. f. Location: The project is located on a water transmission pipeline near the City of Ontario, San Bernardino, California. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Licensee Contact: Ms. Chelsea Murphy, Natural Resources Project Manager, SWCA Environmental Consultants, 150 South Arroyo Parkway, Second Floor, Pasadena, California, Telephone: (626) 240–0587 ext. 6609, cmurphy@swca.com. i. FERC Contact: Ms. Rebecca Martin, (202) 502–6012, Rebecca.Martin@ ferc.gov. j. Deadline for filing comments, interventions, and protests is February 28, 2018. The Commission strongly encourages electronic filing. Please file motions to intervene, protests and comments using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–10532–006. k. Description of Request: The project consists of the existing water supply transmission system and one powerhouse containing one turbine generating unit with a total rated capacity of 225 kilowatts (kW). The project has not operated since October 7, 2005. The demand for water at the project has been around 0.5 million gallons per day (MGD). The minimum required flow required to operate the hydrogenerator is 6.1 MGD. As a result, the exemptee, has determined it would like to surrender the exemption. Electricity to the hydrogenerator has been permanently disconnected. No ground disturbance is associated with the proposed surrender and project features will remain in place. l. This filing may be viewed on the Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 5095 Enter the docket number (P–10532–006) excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction in the Commission’s Public Reference Room located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .212 and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to the surrender application that is the subject of this notice. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they E:\FR\FM\05FEN1.SGM 05FEN1 5096 Federal Register / Vol. 83, No. 24 / Monday, February 5, 2018 / Notices must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: January 29, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–02230 Filed 2–2–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–724–000] sradovich on DSK3GMQ082PROD with NOTICES Grid Power Direct, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Grid Power Direct, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is February 20, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies VerDate Sep<11>2014 18:08 Feb 02, 2018 Jkt 244001 of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 30, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–02239 Filed 2–2–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP18–360–000. Applicants: Transcontinental Gas Pipe Line Company. Description: § 4(d) Rate Filing: DPEs— New York Bay to be effective 2/25/2018. Filed Date: 1/25/18. Accession Number: 20180125–5042. Comments Due: 5 p.m. ET 2/6/18. Docket Numbers: RP18–361–000. Applicants: Big Sandy Pipeline, LLC. Description: Compliance filing Big Sandy Fuel Filing Effective 3–1–2018. Filed Date: 1/25/18. Accession Number: 20180125–5045. Comments Due: 5 p.m. ET 2/6/18. Docket Numbers: RP18–362–000. Applicants: Southern LNG Company, L.L.C. Description: § 4(d) Rate Filing: Dredging Surcharge Cost Adjustment— 2018 to be effective 3/1/2018. Filed Date: 1/25/18. Accession Number: 20180125–5112. Comments Due: 5 p.m. ET 2/6/18. Docket Numbers: RP18–363–000. Applicants: Transcontinental Gas Pipe Line Company. Description: § 4(d) Rate Filing: Rate Schedule S–2 Tracker effective 02–01– 18 to be effective 2/1/2018. PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 Filed Date: 1/25/18. Accession Number: 20180125–5164. Comments Due: 5 p.m. ET 2/6/18. Docket Numbers: RP18–364–000. Applicants: Stagecoach Pipeline & Storage Company LLC. Description: § 4(d) Rate Filing: Stagecoach Pipeline & Storage Company LLC—Filing of Tariff Changes to be effective 3/1/2018. Filed Date: 1/26/18. Accession Number: 20180126–5078. Comments Due: 5 p.m. ET 2/7/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and § 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 29, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–02227 Filed 2–2–18; 8:45 am] BILLING CODE 6717–01–P FEDERAL COMMUNICATIONS COMMISSION [CG Docket No. 17–22; DA 18–13] Termination of Dormant Proceedings Federal Communications Commission. ACTION: Notice of availability. AGENCY: In this document, the Consumer and Governmental Affairs Bureau announces the availability of the FCC order terminating, as dormant, certain docketed Commission proceedings. SUMMARY: The dockets are terminated as of February 5, 2018. FOR FURTHER INFORMATION CONTACT: Micah Caldwell, Consumer and Governmental Affairs Bureau at (202) 418–1316 or by email at Micah.Caldwell@fcc.gov. SUPPLEMENTARY INFORMATION: The Commission’s Order, Termination of DATES: E:\FR\FM\05FEN1.SGM 05FEN1

Agencies

[Federal Register Volume 83, Number 24 (Monday, February 5, 2018)]
[Notices]
[Pages 5095-5096]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-02230]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 10532-006]


Water Facilities Authority a Joint Power Agency; Notice of 
Application for Surrender of Exemption, Soliciting Comments, Motions To 
Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Proceeding: Application for surrender of conduit 
exemption.
    b. Project No.: 10532-006.
    c. Date Filed: January 18, 2018.
    d. Licensee: Water Facilities Authority a Joint Power Agency (WFA-
JPA).
    e. Name of Project: WFA-JPA Regional Water Supply Energy Recovery 
Facilities Project.
    f. Location: The project is located on a water transmission 
pipeline near the City of Ontario, San Bernardino, California.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Licensee Contact: Ms. Chelsea Murphy, Natural Resources Project 
Manager, SWCA Environmental Consultants, 150 South Arroyo Parkway, 
Second Floor, Pasadena, California, Telephone: (626) 240-0587 ext. 
6609, [email protected].
    i. FERC Contact: Ms. Rebecca Martin, (202) 502-6012, 
[email protected].
    j. Deadline for filing comments, interventions, and protests is 
February 28, 2018. The Commission strongly encourages electronic 
filing. Please file motions to intervene, protests and comments using 
the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-10532-006.
    k. Description of Request: The project consists of the existing 
water supply transmission system and one powerhouse containing one 
turbine generating unit with a total rated capacity of 225 kilowatts 
(kW). The project has not operated since October 7, 2005. The demand 
for water at the project has been around 0.5 million gallons per day 
(MGD). The minimum required flow required to operate the hydrogenerator 
is 6.1 MGD. As a result, the exemptee, has determined it would like to 
surrender the exemption. Electricity to the hydrogenerator has been 
permanently disconnected. No ground disturbance is associated with the 
proposed surrender and project features will remain in place.
    l. This filing may be viewed on the Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
10532-006) excluding the last three digits in the docket number field 
to access the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of 
new filings and issuances related to this or other pending projects. 
For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction in the Commission's 
Public Reference Room located at 888 First Street NE, Room 2A, 
Washington, DC 20426, or by calling (202) 502-8371.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.212 and .214. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to the surrender application that is the subject of this notice. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they

[[Page 5096]]

must also serve a copy of the document on that resource agency. A copy 
of all other filings in reference to this application must be 
accompanied by proof of service on all persons listed in the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b) and 385.2010.

    Dated: January 29, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-02230 Filed 2-2-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.