Brookfield White Pine Hydro LLC; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the PAD and Scoping Document, and Identification of Issues and Associated Study Requests, 5090-5092 [2018-02229]
Download as PDF
5090
Federal Register / Vol. 83, No. 24 / Monday, February 5, 2018 / Notices
Applicants: Grid Power Direct, LLC.
Description: Baseline eTariff Filing:
Grid Power Direct MBR Application to
be effective 3/31/2018.
Filed Date: 1/29/18.
Accession Number: 20180129–5220.
Comments Due: 5 p.m. ET 2/20/18.
Docket Numbers: ER18–725–000.
Applicants: Public Service Company
of New Mexico.
Description: § 205(d) Rate Filing:
Modifications to NITSA/NOA between
PNM and Tri-State to be effective
1/1/2018.
Filed Date: 1/29/18.
Accession Number: 20180129–5249.
Comments Due: 5 p.m. ET 2/20/18.
Docket Numbers: ER18–726–000.
Applicants: Public Service Company
of New Mexico.
Description: § 205(d) Rate Filing:
Modification to Contract P0695 between
PNM and Western to be effective
1/1/2018.
Filed Date: 1/29/18.
Accession Number: 20180129–5293.
Comments Due: 5 p.m. ET 2/20/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 29, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–02225 Filed 2–2–18; 8:45 am]
BILLING CODE 6717–01–P
sradovich on DSK3GMQ082PROD with NOTICES
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commissioner and Staff
Attendance at North American Electric
Reliability Corporation Meetings
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the Commission
VerDate Sep<11>2014
18:08 Feb 02, 2018
Jkt 244001
and/or Commission staff may attend the
following meetings:
North American Electric Reliability
Corporation, Member Representatives
Committee and Board of Trustees
Meetings, Board of Trustees Corporate
Governance and Human Resources
Committee, Finance and Audit
Committee, Compliance Committee,
and Standards Oversight and
Technology Committee Meetings
Hilton Fort Lauderdale Marina, 1881 SE
17th Street, Fort Lauderdale, FL
33316
February 7 (8:00 a.m.–5:00 p.m. eastern
time) and February 8 (8:30 a.m.–12:00
p.m. eastern time), 2018
Further information regarding these
meetings may be found at: https://
www.nerc.com/Pages/Calendar.aspx.
The discussions at the meetings,
which are open to the public, may
address matters at issue in the following
Commission proceedings:
Docket No. RR17–6, North American
Electric Reliability Corporation
For further information, please
contact Jonathan First, 202–502–8529,
or jonathan.first@ferc.gov.
correspondence should be forwarded to:
Mr. Michael Rickly P.E., Manager,
Hydrodyne Energy, LLC, 1700 Joyce
Ave., Columbus, OH 43219, Phone:
614–297–9877, Cell: 614–648–2466,
Fax: 614–297–9878, Email: mike@
rickly.com.
Dated: January 30, 2018.
Kimberly D. Bose,
Secretary.
a. Type of Filing: Notice of Intent to
File License Application for a New
License and Commencing Pre-filing
Process.
b. Project No.: 2530–054.
c. Dated Filed: November 30, 2017.
d. Submitted By: Brookfield White
Pine Hydro LLC (White Pine Hydro).
e. Name of Project: Hiram
Hydroelectric Project.
f. Location: On the Saco River in the
towns of Hiram, Baldwin, Brownfield,
and Denmark, within Oxford and
Cumberland Counties, Maine. The
project does not occupy United States
lands.
g. Filed Pursuant to: 18 CFR part 5 of
the Commission’s Regulations.
h. Potential Applicant Contact: Frank
Dunlap, Licensing Specialist, Brookfield
Renewable, Brookfield White Pine
Hydro LLC, 150 Maine Street, Lewiston,
Maine 04240; (207) 755–5603;
frank.dunlap@brookfieldrenewable.com.
i. FERC Contact: Allan Creamer at
(202) 502–8365, or email at
allan.creamer@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item o below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
[FR Doc. 2018–02240 Filed 2–2–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3932–011]
Hydrodyne Industries, LLC; Hydrodyne
Energy, LLC; Notice of Transfer of
Exemption
1. By letter filed January 17, 2018,
George S. Cook, Manager, Hydrodyne
Industries, LLC, exemptee and Michael
Rickly P.E., Manager, Hydrodyne
Energy, LLC informed the Commission
that the exemption from licensing for
the Little River Hydroelectric Project
No. 3932, originally issued May 4,
1982 1 has been transferred to
Hydrodyne Energy, LLC. The project is
located on the Little River in
Montgomery County, North Carolina.
The transfer of an exemption does not
require Commission approval.
2. Hydrodyne Energy, LLC is now the
exemptee of the Little River
Hydroelectric Project No. 3932. All
1 Order Granting Exemption From Licensing of a
Small Hydroelectric Project of 5 Megawatts or Less.
American Hydro Power Company, 19 FERC
¶ 62,191 (1982).
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Dated: January 30, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–02241 Filed 2–2–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2530–054]
Brookfield White Pine Hydro LLC;
Notice of Intent To File License
Application, Filing of Pre-Application
Document (PAD), Commencement of
Pre-Filing Process, and Scoping;
Request for Comments on the PAD
and Scoping Document, and
Identification of Issues and Associated
Study Requests
E:\FR\FM\05FEN1.SGM
05FEN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 83, No. 24 / Monday, February 5, 2018 / Notices
the preparation of the environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
k. With this notice, we are initiating
informal consultation with: (1) The U.S.
Fish and Wildlife Service and/or the
National Marine Fisheries Service under
section 7 of the Endangered Species Act
and the joint agency regulations
thereunder at 50 CFR part 402; and (2)
the State Historic Preservation Officer,
as required by section 106, National
Historical Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
White Pine Hydro as the Commission’s
non-federal representative for carrying
out informal consultation, pursuant to
section 7 of the Endangered Species Act
and section 106 of the National Historic
Preservation Act.
m. White Pine Hydro filed with the
Commission a Pre-Application
Document (PAD; including a proposed
process plan and schedule), pursuant to
18 CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room, or may be viewed on
the Commission’s website (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits in the docket number
field, to access the document. For
assistance, contact FERC Online
Support at FERCONlineSupport@
ferc.gov, or toll free at 1–866–208–3676,
or for TTY, (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in
paragraph h.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. With this notice, we are soliciting
comments on the PAD and Commission
staff’s Scoping Document 1 (SD1), as
well as study requests. All comments on
the PAD and SD1, as well as study
requests should be sent to the address
above in paragraph h. In addition, all
comments on the PAD and SD1, study
requests, requests for cooperating
agency status, and all communications
to and from Commission staff related to
the merits of the potential application
must be filed with the Commission.
Documents may be filed electronically
via the internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s website https://
www.ferc.gov/docs-filing/efiling.asp.
VerDate Sep<11>2014
18:08 Feb 02, 2018
Jkt 244001
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
send a paper copy to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
All filings with the Commission must
include on the first page, the project
name (Hiram Hydroelectric Project and
number (P–2530–054), and bear the
appropriate heading: ‘‘Comments on
Pre-Application Document,’’ ‘‘Study
Requests,’’ ‘‘Comments on Scoping
Document 1,’’ ‘‘Request for Cooperating
Agency Status,’’ or ‘‘Communications to
and from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by March 30, 2018.
p. Although our current intent is to
prepare an environmental assessment
(EA), there is the possibility that an
Environmental Impact Statement (EIS)
will be required. Nevertheless, the
meetings listed below will satisfy the
NEPA scoping requirements,
irrespective of whether an EA or EIS is
issued by the Commission.
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the time and place noted
below. The daytime meeting will focus
on resource agency, Indian tribes, and
non-governmental organization
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested agencies,
Indian tribes, organizations, and
individuals to attend one or both of the
meetings, and to assist staff in
identifying particular study needs, as
well as the scope of environmental
issues to be addressed in the
environmental document. The times
and locations of these meetings are as
follows:
Evening Scoping Meeting
Date: Wednesday, February 28, 2018.
Time: 6:30 p.m.
Location: Baldwin Community
Center, Conference Room, 534
Pequawket Trail, ME 113, West
Baldwin, ME 04091.
Phone: Danielle Taylor at (207) 625–
9107.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
5091
Daytime Scoping Meeting
Date: Thursday, March 1, 2018.
Time: 9:00 a.m.
Location: Brookfield Renewable
Offices, Moosehead Room, 150 Main
Street, Lewiston, ME 04240.
Phone: Frank Dunlap at (207) 755–
5603.
SD1, which outlines the subject areas
to be addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Follow the directions
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Environmental Site Review
The potential applicant and
Commission staff will conduct an
Environmental Site Review of the
project on Thursday, March 1, 2018,
starting at 2:00 p.m. All participants
should meet at White Pine Hydro’s
Hiram Dam, located at 45 Hiram Dam
Road, Baldwin, ME 04091. All
participants are responsible for their
own transportation. Anyone with
questions about the site visit should
contact Mr. Frank Dunlap of White Pine
Hydro at (207) 755–5603 on or before
February 20, 2018.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this notice.
E:\FR\FM\05FEN1.SGM
05FEN1
5092
Federal Register / Vol. 83, No. 24 / Monday, February 5, 2018 / Notices
Meeting Procedures
The meetings will be recorded by a
stenographer. The transcripts will be
placed in the public record for the
project.
Dated: January 29, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–02229 Filed 2–2–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
sradovich on DSK3GMQ082PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP11–1711–000.
Applicants: Texas Gas Transmission,
LLC.
Description: Report Filing: 2017 Cash
Out Filing.
Filed Date: 1/29/18.
Accession Number: 20180129–5075.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: RP13–886–003.
Applicants: Southern Natural Gas
Company, L.L.C.
Description: Compliance filing
Petition to Amend Stipulation and
Agreement under RP13–886.
Filed Date: 1/29/18.
Accession Number: 20180129–5286.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: RP17–197–008.
Applicants: Dominion Energy Cove
Point LNG, LP.
Description: Compliance filing
DECP—RP17–197 Settlement
Compliance—Appendix D to be
effective 3/1/2018.
Filed Date: 1/29/18.
Accession Number: 20180129–5076.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: RP18–365–000.
Applicants: Nautilus Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing:
Nautilus Section-Based Baseline Tariff
to be effective 3/15/2018.
Filed Date: 1/29/18.
Accession Number: 20180129–5063.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: RP18–366–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Bay State Releases eff
2–1–2018 to be effective 2/1/2018.
Filed Date: 1/29/18.
Accession Number: 20180129–5067.
VerDate Sep<11>2014
18:08 Feb 02, 2018
Jkt 244001
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: RP18–367–000.
Applicants: Kinder Morgan Illinois
Pipeline LLC.
Description: Penalty Revenue
Crediting Report of Kinder Morgan
Illinois Pipeline LLC.
Filed Date: 1/29/18.
Accession Number: 20180129–5068.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: RP18–368–000.
Applicants: Columbia Gulf
Transmission, LLC.
Description: Compliance filing
Cameron Access Rate Implementation
Compliance CP15–109 to be effective
3/1/2018.
Filed Date: 1/29/18.
Accession Number: 20180129–5070.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: RP18–369–000.
Applicants: Sea Robin Pipeline
Company, LLC.
Description: § 4(d) Rate Filing: Revise
Quality Provisions to be effective
3/1/2018.
Filed Date: 1/29/18.
Accession Number: 20180129–5071.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: RP18–370–000.
Applicants: Kinder Morgan Illinois
Pipeline LLC.
Description: § 4(d) Rate Filing:
Removal of Negotiated Rate Agreement
to be effective 3/1/2018.
Filed Date: 1/29/18.
Accession Number: 20180129–5087.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: RP18–371–000.
Applicants: Kinder Morgan Louisiana
Pipeline LLC.
Description: Penalty Revenue
Crediting Report of Kinder Morgan
Louisiana Pipeline LLC.
Filed Date: 1/29/18.
Accession Number: 20180129–5137.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: RP18–372–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Transportation Service Agreement
Update Filing (City of Mesa) to be
effective 3/1/2018.
Filed Date: 1/29/18.
Accession Number: 20180129–5252.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: RP18–373–000.
Applicants: Wyoming Interstate
Company, L.L.C.
Description: § 4(d) Rate Filing: Fuel
and L&U Update to be effective
3/1/2018.
Filed Date: 1/29/18.
Accession Number: 20180129–5253.
Comments Due: 5 p.m. ET 2/12/18.
The filings are accessible in the
Commission’s eLibrary system by
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 30, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–02243 Filed 2–2–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2759–007;
ER10–2732–014; ER10–2733–014;
ER10–2734–014; ER10–2736–014;
ER10–2737–014; ER10–2741–014;
ER10–2749–014; ER10–2752–014;
ER12–2492–010; ER12–2493–010;
ER12–2494–010; ER12–2495–010;
ER12–2496–010; ER16–2455–004;
ER16–2456–004; ER16–2457–004;
ER16–2458–004; ER16–2459–004;
ER14–264–004; ER10–2631–007; ER10–
1437–007; ER13–815–005.
Applicants: Bridgeport Energy LLC,
Emera Energy Services Inc., Emera
Energy U.S. Subsidiary No. 1, Inc.,
Emera Energy U.S. Subsidiary No. 2,
Inc., Emera Energy Services Subsidiary
No. 1 LLC, Emera Energy Services
Subsidiary No. 2 LLC, Emera Energy
Services Subsidiary No. 3 LLC, Emera
Energy Services Subsidiary No. 4 LLC,
Emera Energy Services Subsidiary No. 5
LLC, Emera Energy Services Subsidiary
No. 6 LLC, Emera Energy Services
Subsidiary No. 7 LLC, Emera Energy
Services Subsidiary No. 8 LLC, Emera
Energy Services Subsidiary No. 9 LLC,
Emera Energy Services Subsidiary No.
10 LLC, Emera Energy Services
Subsidiary No. 11 LLC, Emera Energy
Services Subsidiary No. 12 LLC, Emera
Energy Services Subsidiary No. 13 LLC,
E:\FR\FM\05FEN1.SGM
05FEN1
Agencies
[Federal Register Volume 83, Number 24 (Monday, February 5, 2018)]
[Notices]
[Pages 5090-5092]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-02229]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2530-054]
Brookfield White Pine Hydro LLC; Notice of Intent To File License
Application, Filing of Pre-Application Document (PAD), Commencement of
Pre-Filing Process, and Scoping; Request for Comments on the PAD and
Scoping Document, and Identification of Issues and Associated Study
Requests
a. Type of Filing: Notice of Intent to File License Application for
a New License and Commencing Pre-filing Process.
b. Project No.: 2530-054.
c. Dated Filed: November 30, 2017.
d. Submitted By: Brookfield White Pine Hydro LLC (White Pine
Hydro).
e. Name of Project: Hiram Hydroelectric Project.
f. Location: On the Saco River in the towns of Hiram, Baldwin,
Brownfield, and Denmark, within Oxford and Cumberland Counties, Maine.
The project does not occupy United States lands.
g. Filed Pursuant to: 18 CFR part 5 of the Commission's
Regulations.
h. Potential Applicant Contact: Frank Dunlap, Licensing Specialist,
Brookfield Renewable, Brookfield White Pine Hydro LLC, 150 Maine
Street, Lewiston, Maine 04240; (207) 755-5603;
[email protected].
i. FERC Contact: Allan Creamer at (202) 502-8365, or email at
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item o below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in
[[Page 5091]]
the preparation of the environmental document cannot also intervene.
See 94 FERC ] 61,076 (2001).
k. With this notice, we are initiating informal consultation with:
(1) The U.S. Fish and Wildlife Service and/or the National Marine
Fisheries Service under section 7 of the Endangered Species Act and the
joint agency regulations thereunder at 50 CFR part 402; and (2) the
State Historic Preservation Officer, as required by section 106,
National Historical Preservation Act, and the implementing regulations
of the Advisory Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating White Pine Hydro as the
Commission's non-federal representative for carrying out informal
consultation, pursuant to section 7 of the Endangered Species Act and
section 106 of the National Historic Preservation Act.
m. White Pine Hydro filed with the Commission a Pre-Application
Document (PAD; including a proposed process plan and schedule),
pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room, or may be viewed on the Commission's website
(https://www.ferc.gov) using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field, to
access the document. For assistance, contact FERC Online Support at
[email protected], or toll free at 1-866-208-3676, or for TTY,
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in paragraph h.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
o. With this notice, we are soliciting comments on the PAD and
Commission staff's Scoping Document 1 (SD1), as well as study requests.
All comments on the PAD and SD1, as well as study requests should be
sent to the address above in paragraph h. In addition, all comments on
the PAD and SD1, study requests, requests for cooperating agency
status, and all communications to and from Commission staff related to
the merits of the potential application must be filed with the
Commission. Documents may be filed electronically via the internet. See
18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
website https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, send a paper copy to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
All filings with the Commission must include on the first page, the
project name (Hiram Hydroelectric Project and number (P-2530-054), and
bear the appropriate heading: ``Comments on Pre-Application Document,''
``Study Requests,'' ``Comments on Scoping Document 1,'' ``Request for
Cooperating Agency Status,'' or ``Communications to and from Commission
Staff.'' Any individual or entity interested in submitting study
requests, commenting on the PAD or SD1, and any agency requesting
cooperating status must do so by March 30, 2018.
p. Although our current intent is to prepare an environmental
assessment (EA), there is the possibility that an Environmental Impact
Statement (EIS) will be required. Nevertheless, the meetings listed
below will satisfy the NEPA scoping requirements, irrespective of
whether an EA or EIS is issued by the Commission.
Scoping Meetings
Commission staff will hold two scoping meetings in the vicinity of
the project at the time and place noted below. The daytime meeting will
focus on resource agency, Indian tribes, and non-governmental
organization concerns, while the evening meeting is primarily for
receiving input from the public. We invite all interested agencies,
Indian tribes, organizations, and individuals to attend one or both of
the meetings, and to assist staff in identifying particular study
needs, as well as the scope of environmental issues to be addressed in
the environmental document. The times and locations of these meetings
are as follows:
Evening Scoping Meeting
Date: Wednesday, February 28, 2018.
Time: 6:30 p.m.
Location: Baldwin Community Center, Conference Room, 534 Pequawket
Trail, ME 113, West Baldwin, ME 04091.
Phone: Danielle Taylor at (207) 625-9107.
Daytime Scoping Meeting
Date: Thursday, March 1, 2018.
Time: 9:00 a.m.
Location: Brookfield Renewable Offices, Moosehead Room, 150 Main
Street, Lewiston, ME 04240.
Phone: Frank Dunlap at (207) 755-5603.
SD1, which outlines the subject areas to be addressed in the
environmental document, was mailed to the individuals and entities on
the Commission's mailing list. Copies of SD1 will be available at the
scoping meetings, or may be viewed on the web at https://www.ferc.gov
using the ``eLibrary'' link. Follow the directions for accessing
information in paragraph n. Based on all oral and written comments, a
Scoping Document 2 (SD2) may be issued. SD2 may include a revised
process plan and schedule, as well as a list of issues, identified
through the scoping process.
Environmental Site Review
The potential applicant and Commission staff will conduct an
Environmental Site Review of the project on Thursday, March 1, 2018,
starting at 2:00 p.m. All participants should meet at White Pine
Hydro's Hiram Dam, located at 45 Hiram Dam Road, Baldwin, ME 04091. All
participants are responsible for their own transportation. Anyone with
questions about the site visit should contact Mr. Frank Dunlap of White
Pine Hydro at (207) 755-5603 on or before February 20, 2018.
Meeting Objectives
At the scoping meetings, staff will: (1) Initiate scoping of the
issues; (2) review and discuss existing conditions and resource
management objectives; (3) review and discuss existing information and
identify preliminary information and study needs; (4) review and
discuss the process plan and schedule for pre-filing activity that
incorporates the time frames provided for in Part 5 of the Commission's
regulations and, to the extent possible, maximizes coordination of
federal, state, and tribal permitting and certification processes; and
(5) discuss the appropriateness of any federal or state agency or
Indian tribe acting as a cooperating agency for development of an
environmental document.
Meeting participants should come prepared to discuss their issues
and/or concerns. Please review the PAD in preparation for the scoping
meetings. Directions on how to obtain a copy of the PAD and SD1 are
included in item n. of this notice.
[[Page 5092]]
Meeting Procedures
The meetings will be recorded by a stenographer. The transcripts
will be placed in the public record for the project.
Dated: January 29, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-02229 Filed 2-2-18; 8:45 am]
BILLING CODE 6717-01-P