Transwestern Pipeline Company, LLC; Notice of Request Under Blanket Authorization, 4194-4195 [2018-01790]
Download as PDF
4194
Federal Register / Vol. 83, No. 20 / Tuesday, January 30, 2018 / Notices
Description: § 4(d) Rate Filing: Duke
K410135 Release for 2018–01–13 to be
effective 1/13/2018.
Filed Date: 1/16/18.
Accession Number: 20180116–5072.
Comments Due: 5 p.m. ET 1/29/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 24, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–01700 Filed 1–29–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meeting of the
California Independent System Operator
Corporation:
daltland on DSKBBV9HB2PROD with NOTICES
Review of Reliability Must-Run and
Capacity Procurement Mechanism
January 30, 2018, 10:00 a.m.–3:00 p.m.
(PST)
The above-referenced meeting will be
held at: California Independent System
Operator Corporation, 250 Outcropping
Way, Folsom, CA 95630.
The above-referenced meeting is open
to stakeholders.
Further information may be found at
www.caiso.com.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. ER18–230, Gilroy Energy
Center, LLC
Docket No. ER18–240, Metcalf Energy
Center, LLC
VerDate Sep<11>2014
18:18 Jan 29, 2018
Jkt 244001
Docket No. ER18–641, California
Independent System Operator,
Corporation
For more information, contact: Saeed
Farrokhpay, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission, (916) 294–0322,
saeed.farrokhpay@ferc.gov.
Dated: January 23, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–01794 Filed 1–29–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–47–000]
Transwestern Pipeline Company, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on January 16, 2018,
Transwestern Pipeline Company, LLC
(Transwestern), 1300 Main Street,
Houston, Texas 7700, filed a Prior
Notice Request pursuant to sections
157.205, 157.208 and 157.210 of the
Commission’s regulations under the
Natural Gas Act (NGA) for authorization
to: (1) Construct, own, operate and
maintain certain modifications to its
existing compressor units at its WT–1
Compressor Station (WT–1 Station) in
Lea County, New Mexico; and (2)
increase capacity on its West Texas
Lateral between the WT–1 Station and
Compressor Station 9 up to 130,000
thousand cubic feet per day of natural
gas, all as more fully set forth in the
application, which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
Application should be directed to Mr.
Kelly Allen, Manager, Regulatory Affairs
Department for Transwestern Pipeline
Company, LLC, 1300 Main Street,
Houston, Texas 77002, or call 713–989–
2606, or by email Kelly.Allen@
energytransfer.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
E:\FR\FM\30JAN1.SGM
30JAN1
Federal Register / Vol. 83, No. 20 / Tuesday, January 30, 2018 / Notices
Commission’s website (www.ferc.gov)
under the e-Filing link. Persons unable
to file electronically should submit an
original and 5 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: January 24, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–01790 Filed 1–29–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Projects Nos. 1940–029 and 1966–054]
daltland on DSKBBV9HB2PROD with NOTICES
Wisconsin Public Service Corporation;
Notice of Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission or FERC)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the applications
for new licenses for the 2.6-megawatt
(MW) Tomahawk Hydroelectric Project
(FERC Project No. 1940–029) and the
17.24–MW Grandfather Falls
Hydroelectric Project (FERC Project No.
1966–054) and has prepared a single
environmental assessment (EA) that
includes both projects. Both projects are
located on the Wisconsin River in
Lincoln County, Wisconsin.
The EA contains the staff’s analysis of
the potential environmental impacts of
the projects and concludes that
licensing the projects, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at
www.ferc.gov using the eLibrary link.
For each project, enter the docket
number, excluding the last three digits,
in the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov; toll-free
at 1–866–208–3676; or for TTY, (202)
502–8659.
You may also register online at
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
VerDate Sep<11>2014
18:18 Jan 29, 2018
Jkt 244001
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice. The
Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
numbers P–1940–029 or P–1966–054, as
appropriate.
For further information, contact Lee
Emery at (202) 502–8379 or by email at
lee.emery@ferc.gov.
Dated: January 24, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–01787 Filed 1–29–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–50–000.
Applicants: South Carolina Electric &
Gas Company.
Description: Application for Federal
Power Act Section 203 Approval and
Request for Expedited Consideration of
South Carolina Electric & Gas Company,
et al.
Filed Date: 1/22/18.
Accession Number: 20180122–5200.
Comments Due: 5 p.m. ET 2/12/18.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–32–000.
Applicants: Gray Hawk Solar, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Gray Hawk Solar,
LLC.
Filed Date: 1/23/18.
Accession Number: 20180123–5065.
Comments Due: 5 p.m. ET 2/13/18.
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
4195
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–426–003.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Missouri River Energy Services Member
Formula Rate (Denison) Compliance
Filing to be effective 2/1/2017.
Filed Date: 1/22/18.
Accession Number: 20180122–5159.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18–360–001.
Applicants: Entergy Arkansas, Inc.
Description: Tariff Amendment: EAI–
AECI LBA Agreement Errata to be
effective 12/1/2017.
Filed Date: 1/22/18.
Accession Number: 20180122–5167.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18–692–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–01–22_SA 3084 St. Joseph Phase
II–NIPSCO GIA (J351) to be effective
1/5/2018.
Filed Date: 1/22/18.
Accession Number: 20180122–5151.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18–693–000,
Applicants: NorthWestern
Corporation.
Description: Tariff Cancellation:
Notice of Cancellation; SA 804, Fast
Process Agreement with MDT (Fox
Farm Road) to be effective 1/23/2018.
Filed Date: 1/22/18.
Accession Number: 20180122–5158.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18–694–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing: La
Paloma Generating Company GSFA and
GIA Amendment (SA 18) to be effective
1/23/2018.
Filed Date: 1/22/18.
Accession Number: 20180122–5177.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18–695–000.
Applicants: Baltimore Gas and
Electric Company, PECO Energy
Company.
Description: Request for
Abandonment Costs Recovery PreApproval for PJM RTEP Project 9A of
Baltimore Gas and Electric Company, et
al.
Filed Date: 1/22/18.
Accession Number: 20180122–5196.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18–696–000.
Applicants: Summer Energy
Northeast, LLC.
Description: § 205(d) Rate Filing: REP
Energy LLC Name Change to Summer
E:\FR\FM\30JAN1.SGM
30JAN1
Agencies
[Federal Register Volume 83, Number 20 (Tuesday, January 30, 2018)]
[Notices]
[Pages 4194-4195]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-01790]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-47-000]
Transwestern Pipeline Company, LLC; Notice of Request Under
Blanket Authorization
Take notice that on January 16, 2018, Transwestern Pipeline
Company, LLC (Transwestern), 1300 Main Street, Houston, Texas 7700,
filed a Prior Notice Request pursuant to sections 157.205, 157.208 and
157.210 of the Commission's regulations under the Natural Gas Act (NGA)
for authorization to: (1) Construct, own, operate and maintain certain
modifications to its existing compressor units at its WT-1 Compressor
Station (WT-1 Station) in Lea County, New Mexico; and (2) increase
capacity on its West Texas Lateral between the WT-1 Station and
Compressor Station 9 up to 130,000 thousand cubic feet per day of
natural gas, all as more fully set forth in the application, which is
on file with the Commission and open to public inspection. The filing
may also be viewed on the web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at [email protected] or call toll-
free, (866) 208-3676 or TTY, (202) 502-8659.
Any questions regarding this Application should be directed to Mr.
Kelly Allen, Manager, Regulatory Affairs Department for Transwestern
Pipeline Company, LLC, 1300 Main Street, Houston, Texas 77002, or call
713-989-2606, or by email [email protected].
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the NGA (18 CFR 157.205) file a protest to the request. If no protest
is filed within the time allowed therefore, the proposed activity shall
be deemed to be authorized effective the day after the time allowed for
protest. If a protest is filed and not withdrawn within 30 days after
the time allowed for filing a protest, the instant request shall be
treated as an application for authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenter's will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the
[[Page 4195]]
Commission's website (www.ferc.gov) under the e-Filing link. Persons
unable to file electronically should submit an original and 5 copies of
the protest or intervention to the Federal Energy regulatory
Commission, 888 First Street NE, Washington, DC 20426.
Dated: January 24, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-01790 Filed 1-29-18; 8:45 am]
BILLING CODE 6717-01-P