Dominion Energy Transmission, Inc.; Notice of Application, 4196-4197 [2018-01789]
Download as PDF
4196
Federal Register / Vol. 83, No. 20 / Tuesday, January 30, 2018 / Notices
Energy Northeast, LLC to be effective 1/
23/2018.
Filed Date: 1/23/18.
Accession Number: 20180123–5048.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: ER18–697–000.
Applicants: Gray Hawk Solar, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization to be effective 3/9/2018.
Filed Date: 1/23/18.
Accession Number: 20180123–5051.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: ER18–699–000.
Applicants: Wisconsin Electric Power
Company.
Description: § 205(d) Rate Filing:
Amendment to WPPI Metering
Agreement (FERC Rate Schedule No.
115) to be effective 1/24/2018.
Filed Date: 1/23/18.
Accession Number: 20180123–5099.
Comments Due: 5 p.m. ET 2/13/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 23, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–01697 Filed 1–29–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP18–45–000]
daltland on DSKBBV9HB2PROD with NOTICES
Dominion Energy Transmission, Inc.;
Notice of Application
Take notice that on January 10, 2018,
Dominion Energy Transmission, Inc.
(Dominion), 120 Tredegar Street,
Richmond, Virginia 23219, filed in
Docket No. CP18–45–000 an application
pursuant to section 7(c) of the Natural
Gas Act (NGA), and Part 157 of the
VerDate Sep<11>2014
18:18 Jan 29, 2018
Jkt 244001
Commission’s regulations requesting
authorization to construct and operate
the Sweden Valley Project (Project), all
as more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Kenan
W. Carioti, Regulatory & Certificates
Analyst III, Dominion Energy
Transmission, Inc., 707 East Main
Street, Richmond, VA 23219 at (804)
771–4018.
Specifically, the Project will enable
Dominion to provide 120,000
dekatherms per day of firm
transportation service from
Pennsylvania to Ohio for delivery to
Tennessee Gas Pipeline Company,
L.L.C. The Project will include
construction of: Approximately 1.7
miles 20-inch-diameter pipeline lateral
to the new Port Washington Metering
and Regulation (M&R) delivery point in
Tuscarawas County, OH; approximately
3.2 miles of 24-inch-diameter pipeline
looping in Greene County, PA; the rewheel of compressors on three existing
centrifugal compression sets at
Dominion’s existing Newark
Compressor Station in Licking County,
OH; the installation of regulation
equipment at Dominion existing South
Bend Compressor Station in Armstrong
County, PA and Leidy M&R Station in
Clinton County, PA; and the
construction of related appurtenant
facilities. Dominion is proposing
incremental rates for transportation
service on the facilities proposed for
construction herein. The cost of the
project will be $49,876,709 million.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
E:\FR\FM\30JAN1.SGM
30JAN1
Federal Register / Vol. 83, No. 20 / Tuesday, January 30, 2018 / Notices
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street NE, Washington, DC
20426.
Comment Date: 5:00 p.m. Eastern time
on February 14, 2018.
Dated: January 24, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–01789 Filed 1–29–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–697–000]
daltland on DSKBBV9HB2PROD with NOTICES
Gray Hawk Solar, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding Gray Hawk
Solar, LLC‘s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is February 12,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: January 23, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–01695 Filed 1–29–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM98–1–000]
Records Governing Off-the-Record
Communications; Public Notice
This constitutes notice, in accordance
with 18 CFR 385.2201(b), of the receipt
of prohibited and exempt off-the-record
communications.
Order No. 607 (64 FR 51222,
September 22, 1999) requires
Commission decisional employees, who
Docket No.
make or receive a prohibited or exempt
off-the-record communication relevant
to the merits of a contested proceeding,
to deliver to the Secretary of the
Commission, a copy of the
communication, if written, or a
summary of the substance of any oral
communication.
Prohibited communications are
included in a public, non-decisional file
associated with, but not a part of, the
decisional record of the proceeding.
Unless the Commission determines that
the prohibited communication and any
responses thereto should become a part
of the decisional record, the prohibited
off-the-record communication will not
be considered by the Commission in
reaching its decision. Parties to a
proceeding may seek the opportunity to
respond to any facts or contentions
made in a prohibited off-the-record
communication, and may request that
the Commission place the prohibited
communication and responses thereto
in the decisional record. The
Commission will grant such a request
only when it determines that fairness so
requires. Any person identified below as
having made a prohibited off-the-record
communication shall serve the
document on all parties listed on the
official service list for the applicable
proceeding in accordance with Rule
2010, 18 CFR 385.2010.
Exempt off-the-record
communications are included in the
decisional record of the proceeding,
unless the communication was with a
cooperating agency as described by 40
CFR 1501.6, made under 18 CFR
385.2201(e)(1)(v).
The following is a list of off-therecord communications recently
received by the Secretary of the
Commission. The communications
listed are grouped by docket numbers in
ascending order. These filings are
available for electronic review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s website at https://
www.ferc.gov using the eLibrary link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
for TTY, contact (202) 502–8659.
File date
Presenter or requester
Prohibited
1. EC17–88–000 .............................................................................................
2. CP17–15–000 .............................................................................................
VerDate Sep<11>2014
18:18 Jan 29, 2018
Jkt 244001
PO 00000
Frm 00016
Fmt 4703
1–12–2018
1–18–2018
Sfmt 4703
4197
Commissioner Neil Chatterjee.1
Dominion Energy.
E:\FR\FM\30JAN1.SGM
30JAN1
Agencies
[Federal Register Volume 83, Number 20 (Tuesday, January 30, 2018)]
[Notices]
[Pages 4196-4197]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-01789]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP18-45-000]
Dominion Energy Transmission, Inc.; Notice of Application
Take notice that on January 10, 2018, Dominion Energy Transmission,
Inc. (Dominion), 120 Tredegar Street, Richmond, Virginia 23219, filed
in Docket No. CP18-45-000 an application pursuant to section 7(c) of
the Natural Gas Act (NGA), and Part 157 of the Commission's regulations
requesting authorization to construct and operate the Sweden Valley
Project (Project), all as more fully set forth in the application which
is on file with the Commission and open to public inspection. The
filing is available for review at the Commission in the Public
Reference Room or may be viewed on the Commission's website at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC at
[email protected] or call toll-free, (866) 208-3676 or TYY,
(202) 502-8659.
Any questions concerning this application may be directed to Kenan
W. Carioti, Regulatory & Certificates Analyst III, Dominion Energy
Transmission, Inc., 707 East Main Street, Richmond, VA 23219 at (804)
771-4018.
Specifically, the Project will enable Dominion to provide 120,000
dekatherms per day of firm transportation service from Pennsylvania to
Ohio for delivery to Tennessee Gas Pipeline Company, L.L.C. The Project
will include construction of: Approximately 1.7 miles 20-inch-diameter
pipeline lateral to the new Port Washington Metering and Regulation
(M&R) delivery point in Tuscarawas County, OH; approximately 3.2 miles
of 24-inch-diameter pipeline looping in Greene County, PA; the re-wheel
of compressors on three existing centrifugal compression sets at
Dominion's existing Newark Compressor Station in Licking County, OH;
the installation of regulation equipment at Dominion existing South
Bend Compressor Station in Armstrong County, PA and Leidy M&R Station
in Clinton County, PA; and the construction of related appurtenant
facilities. Dominion is proposing incremental rates for transportation
service on the facilities proposed for construction herein. The cost of
the project will be $49,876,709 million.
Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9),
within 90 days of this Notice, the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit seven copies of filings made in the proceeding with the
Commission and must mail a copy to the applicant and to every other
party. Only parties to the proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties.
[[Page 4197]]
However, the non-party commentors will not receive copies of all
documents filed by other parties or issued by the Commission (except
for the mailing of environmental documents issued by the Commission)
and will not have the right to seek court review of the Commission's
final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the eFiling link at
https://www.ferc.gov. Persons unable to file electronically should
submit an original and 7 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Comment Date: 5:00 p.m. Eastern time on February 14, 2018.
Dated: January 24, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-01789 Filed 1-29-18; 8:45 am]
BILLING CODE 6717-01-P