Combined Notice of Filings #1, 4195-4196 [2018-01697]
Download as PDF
Federal Register / Vol. 83, No. 20 / Tuesday, January 30, 2018 / Notices
Commission’s website (www.ferc.gov)
under the e-Filing link. Persons unable
to file electronically should submit an
original and 5 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: January 24, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–01790 Filed 1–29–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Projects Nos. 1940–029 and 1966–054]
daltland on DSKBBV9HB2PROD with NOTICES
Wisconsin Public Service Corporation;
Notice of Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission or FERC)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the applications
for new licenses for the 2.6-megawatt
(MW) Tomahawk Hydroelectric Project
(FERC Project No. 1940–029) and the
17.24–MW Grandfather Falls
Hydroelectric Project (FERC Project No.
1966–054) and has prepared a single
environmental assessment (EA) that
includes both projects. Both projects are
located on the Wisconsin River in
Lincoln County, Wisconsin.
The EA contains the staff’s analysis of
the potential environmental impacts of
the projects and concludes that
licensing the projects, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at
www.ferc.gov using the eLibrary link.
For each project, enter the docket
number, excluding the last three digits,
in the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov; toll-free
at 1–866–208–3676; or for TTY, (202)
502–8659.
You may also register online at
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
VerDate Sep<11>2014
18:18 Jan 29, 2018
Jkt 244001
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice. The
Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
numbers P–1940–029 or P–1966–054, as
appropriate.
For further information, contact Lee
Emery at (202) 502–8379 or by email at
lee.emery@ferc.gov.
Dated: January 24, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–01787 Filed 1–29–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–50–000.
Applicants: South Carolina Electric &
Gas Company.
Description: Application for Federal
Power Act Section 203 Approval and
Request for Expedited Consideration of
South Carolina Electric & Gas Company,
et al.
Filed Date: 1/22/18.
Accession Number: 20180122–5200.
Comments Due: 5 p.m. ET 2/12/18.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–32–000.
Applicants: Gray Hawk Solar, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Gray Hawk Solar,
LLC.
Filed Date: 1/23/18.
Accession Number: 20180123–5065.
Comments Due: 5 p.m. ET 2/13/18.
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
4195
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–426–003.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Missouri River Energy Services Member
Formula Rate (Denison) Compliance
Filing to be effective 2/1/2017.
Filed Date: 1/22/18.
Accession Number: 20180122–5159.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18–360–001.
Applicants: Entergy Arkansas, Inc.
Description: Tariff Amendment: EAI–
AECI LBA Agreement Errata to be
effective 12/1/2017.
Filed Date: 1/22/18.
Accession Number: 20180122–5167.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18–692–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–01–22_SA 3084 St. Joseph Phase
II–NIPSCO GIA (J351) to be effective
1/5/2018.
Filed Date: 1/22/18.
Accession Number: 20180122–5151.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18–693–000,
Applicants: NorthWestern
Corporation.
Description: Tariff Cancellation:
Notice of Cancellation; SA 804, Fast
Process Agreement with MDT (Fox
Farm Road) to be effective 1/23/2018.
Filed Date: 1/22/18.
Accession Number: 20180122–5158.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18–694–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing: La
Paloma Generating Company GSFA and
GIA Amendment (SA 18) to be effective
1/23/2018.
Filed Date: 1/22/18.
Accession Number: 20180122–5177.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18–695–000.
Applicants: Baltimore Gas and
Electric Company, PECO Energy
Company.
Description: Request for
Abandonment Costs Recovery PreApproval for PJM RTEP Project 9A of
Baltimore Gas and Electric Company, et
al.
Filed Date: 1/22/18.
Accession Number: 20180122–5196.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18–696–000.
Applicants: Summer Energy
Northeast, LLC.
Description: § 205(d) Rate Filing: REP
Energy LLC Name Change to Summer
E:\FR\FM\30JAN1.SGM
30JAN1
4196
Federal Register / Vol. 83, No. 20 / Tuesday, January 30, 2018 / Notices
Energy Northeast, LLC to be effective 1/
23/2018.
Filed Date: 1/23/18.
Accession Number: 20180123–5048.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: ER18–697–000.
Applicants: Gray Hawk Solar, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization to be effective 3/9/2018.
Filed Date: 1/23/18.
Accession Number: 20180123–5051.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: ER18–699–000.
Applicants: Wisconsin Electric Power
Company.
Description: § 205(d) Rate Filing:
Amendment to WPPI Metering
Agreement (FERC Rate Schedule No.
115) to be effective 1/24/2018.
Filed Date: 1/23/18.
Accession Number: 20180123–5099.
Comments Due: 5 p.m. ET 2/13/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 23, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–01697 Filed 1–29–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP18–45–000]
daltland on DSKBBV9HB2PROD with NOTICES
Dominion Energy Transmission, Inc.;
Notice of Application
Take notice that on January 10, 2018,
Dominion Energy Transmission, Inc.
(Dominion), 120 Tredegar Street,
Richmond, Virginia 23219, filed in
Docket No. CP18–45–000 an application
pursuant to section 7(c) of the Natural
Gas Act (NGA), and Part 157 of the
VerDate Sep<11>2014
18:18 Jan 29, 2018
Jkt 244001
Commission’s regulations requesting
authorization to construct and operate
the Sweden Valley Project (Project), all
as more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Kenan
W. Carioti, Regulatory & Certificates
Analyst III, Dominion Energy
Transmission, Inc., 707 East Main
Street, Richmond, VA 23219 at (804)
771–4018.
Specifically, the Project will enable
Dominion to provide 120,000
dekatherms per day of firm
transportation service from
Pennsylvania to Ohio for delivery to
Tennessee Gas Pipeline Company,
L.L.C. The Project will include
construction of: Approximately 1.7
miles 20-inch-diameter pipeline lateral
to the new Port Washington Metering
and Regulation (M&R) delivery point in
Tuscarawas County, OH; approximately
3.2 miles of 24-inch-diameter pipeline
looping in Greene County, PA; the rewheel of compressors on three existing
centrifugal compression sets at
Dominion’s existing Newark
Compressor Station in Licking County,
OH; the installation of regulation
equipment at Dominion existing South
Bend Compressor Station in Armstrong
County, PA and Leidy M&R Station in
Clinton County, PA; and the
construction of related appurtenant
facilities. Dominion is proposing
incremental rates for transportation
service on the facilities proposed for
construction herein. The cost of the
project will be $49,876,709 million.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
E:\FR\FM\30JAN1.SGM
30JAN1
Agencies
[Federal Register Volume 83, Number 20 (Tuesday, January 30, 2018)]
[Notices]
[Pages 4195-4196]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-01697]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-50-000.
Applicants: South Carolina Electric & Gas Company.
Description: Application for Federal Power Act Section 203 Approval
and Request for Expedited Consideration of South Carolina Electric &
Gas Company, et al.
Filed Date: 1/22/18.
Accession Number: 20180122-5200.
Comments Due: 5 p.m. ET 2/12/18.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG18-32-000.
Applicants: Gray Hawk Solar, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Gray Hawk Solar, LLC.
Filed Date: 1/23/18.
Accession Number: 20180123-5065.
Comments Due: 5 p.m. ET 2/13/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-426-003.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Missouri River Energy Services
Member Formula Rate (Denison) Compliance Filing to be effective 2/1/
2017.
Filed Date: 1/22/18.
Accession Number: 20180122-5159.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18-360-001.
Applicants: Entergy Arkansas, Inc.
Description: Tariff Amendment: EAI-AECI LBA Agreement Errata to be
effective 12/1/2017.
Filed Date: 1/22/18.
Accession Number: 20180122-5167.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18-692-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-01-22_SA 3084 St.
Joseph Phase II-NIPSCO GIA (J351) to be effective 1/5/2018.
Filed Date: 1/22/18.
Accession Number: 20180122-5151.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18-693-000,
Applicants: NorthWestern Corporation.
Description: Tariff Cancellation: Notice of Cancellation; SA 804,
Fast Process Agreement with MDT (Fox Farm Road) to be effective 1/23/
2018.
Filed Date: 1/22/18.
Accession Number: 20180122-5158.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18-694-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: La Paloma Generating Company
GSFA and GIA Amendment (SA 18) to be effective 1/23/2018.
Filed Date: 1/22/18.
Accession Number: 20180122-5177.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18-695-000.
Applicants: Baltimore Gas and Electric Company, PECO Energy
Company.
Description: Request for Abandonment Costs Recovery Pre-Approval
for PJM RTEP Project 9A of Baltimore Gas and Electric Company, et al.
Filed Date: 1/22/18.
Accession Number: 20180122-5196.
Comments Due: 5 p.m. ET 2/12/18.
Docket Numbers: ER18-696-000.
Applicants: Summer Energy Northeast, LLC.
Description: Sec. 205(d) Rate Filing: REP Energy LLC Name Change
to Summer
[[Page 4196]]
Energy Northeast, LLC to be effective 1/23/2018.
Filed Date: 1/23/18.
Accession Number: 20180123-5048.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: ER18-697-000.
Applicants: Gray Hawk Solar, LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization to be effective 3/9/2018.
Filed Date: 1/23/18.
Accession Number: 20180123-5051.
Comments Due: 5 p.m. ET 2/13/18.
Docket Numbers: ER18-699-000.
Applicants: Wisconsin Electric Power Company.
Description: Sec. 205(d) Rate Filing: Amendment to WPPI Metering
Agreement (FERC Rate Schedule No. 115) to be effective 1/24/2018.
Filed Date: 1/23/18.
Accession Number: 20180123-5099.
Comments Due: 5 p.m. ET 2/13/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 23, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-01697 Filed 1-29-18; 8:45 am]
BILLING CODE 6717-01-P