Calpine Bethlehem, LLC, Calpine Mid-Atlantic Generation, LLC, Calpine Mid Merit, LLC, Calpine New Jersey Generation, LLC, Garrison Energy Center LLC, Zon Energy LLC; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 3343 [2018-01250]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 83, No. 16 / Wednesday, January 24, 2018 / Notices
extend the current 10-year term of the
pilot license for the Roosevelt Island
Tidal Energy Project by five years. The
current term of the pilot license expires
December 31, 2021. The licensee wants
to extend the term so it expires on
December 31, 2026. The licensee states
it is ready to install the first phase of the
licensed project and that the extension
is warranted because installation will
result in operational data, which will
inform the subsequent phases of the
pilot license, as well as relicensing the
project. Concurrent with the licensee’s
request for a five-year extension, the
licensee filed a Notice of Intent (NOI) to
relicense the pilot project and a request
that the Commission waive certain
deadlines, as required by the
Commission’s regulations for filing the
Pre-Application Document. Should the
Commission grant the licensee’s request
for a five-year extension of its licensee
term, the Commission would dismiss
the licensee’s NOI and request for
waiver.
k. This notice is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street, NE, Washington, DC
20426. The filing may also be viewed on
the Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the Docket number (P–12611–010)
excluding the last three digits in the
docket number field to access the
notice. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
n. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title COMMENTS,
PROTEST, or MOTION TO INTERVENE
VerDate Sep<11>2014
20:25 Jan 23, 2018
Jkt 244001
as applicable; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the request to
extend the license term. Agencies may
obtain copies of the application directly
from the applicant. A copy of any
protest or motion to intervene must be
served upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
[FR Doc. 2018–01231 Filed 1–23–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL18–25–000]
Calpine Bethlehem, LLC, Calpine MidAtlantic Generation, LLC, Calpine Mid
Merit, LLC, Calpine New Jersey
Generation, LLC, Garrison Energy
Center LLC, Zon Energy LLC; Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
On January 18, 2018, the Commission
issued an order in Docket No. EL18–25–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into whether the rates for Reactive
Supply and Voltage Control Service
(Reactive Service) of Calpine
Bethlehem, LLC, Calpine Mid-Atlantic
Generation, LLC, Calpine Mid Merit,
LLC, Calpine New Jersey Generation,
LLC, Garrison Energy Center LLC, and
Frm 00049
Fmt 4703
Sfmt 4703
Zion Energy LLC (collectively,
Applicants) may be unjust and
unreasonable. Calpine Bethlehem, LLC,
Calpine Mid-Atlantic Generation, LLC,
Calpine Mid Merit, LLC, Calpine New
Jersey Generation, LLC, Garrison Energy
Center LLC, and Zion Energy LLC, 162
FERC ¶ 61,031 (2018).
The refund effective date in Docket
No. EL18–25–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL18–25–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
888 First Street, NE, Washington, DC
20426, in accordance with Rule 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214, within 21
days of the date of issuance of the order.
Dated: January 18, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–01250 Filed 1–23–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Dated: January 18, 2018.
Kimberly D. Bose,
Secretary.
PO 00000
3343
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–2360–005;
ER12–2037–011; ER12–2314–007;
ER15–2129–004; ER15–2130–004;
ER15–2131–004; ER16–2360–005.
Applicants: Great Western Wind
Energy, LLC, Milo Wind Project, LLC,
Roosevelt Wind Project, LLC, Slate
Creek Wind Project, LLC, Spearville 3,
LLC, Spinning Spur Wind LLC.
Description: Notice of Non-Material
Change in Status of Great Western Wind
Energy, LLC, et al.
Filed Date: 1/18/18.
Accession Number: 20180118–5095.
Comments Due: 5 p.m. ET 2/8/18.
Docket Numbers: ER17–2577–001.
Applicants: York Haven Power
Company, LLC.
Description: Amended Response of
York Haven Power Company, LLC to
November 28, 2017 Request for
Additional Information.
Filed Date: 1/12/18.
Accession Number: 20180112–5213.
Comments Due: 5 p.m. ET 2/2/18.
Docket Numbers: ER18–156–001.
Applicants: Southern California
Edison Company.
E:\FR\FM\24JAN1.SGM
24JAN1
Agencies
[Federal Register Volume 83, Number 16 (Wednesday, January 24, 2018)]
[Notices]
[Page 3343]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-01250]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL18-25-000]
Calpine Bethlehem, LLC, Calpine Mid-Atlantic Generation, LLC,
Calpine Mid Merit, LLC, Calpine New Jersey Generation, LLC, Garrison
Energy Center LLC, Zon Energy LLC; Notice of Institution of Section 206
Proceeding and Refund Effective Date
On January 18, 2018, the Commission issued an order in Docket No.
EL18-25-000, pursuant to section 206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an investigation into whether the rates
for Reactive Supply and Voltage Control Service (Reactive Service) of
Calpine Bethlehem, LLC, Calpine Mid-Atlantic Generation, LLC, Calpine
Mid Merit, LLC, Calpine New Jersey Generation, LLC, Garrison Energy
Center LLC, and Zion Energy LLC (collectively, Applicants) may be
unjust and unreasonable. Calpine Bethlehem, LLC, Calpine Mid-Atlantic
Generation, LLC, Calpine Mid Merit, LLC, Calpine New Jersey Generation,
LLC, Garrison Energy Center LLC, and Zion Energy LLC, 162 FERC ] 61,031
(2018).
The refund effective date in Docket No. EL18-25-000, established
pursuant to section 206(b) of the FPA, will be the date of publication
of this notice in the Federal Register.
Any interested person desiring to be heard in Docket No. EL18-25-
000 must file a notice of intervention or motion to intervene, as
appropriate, with the Federal Energy Regulatory Commission, 888 First
Street, NE, Washington, DC 20426, in accordance with Rule 214 of the
Commission's Rules of Practice and Procedure, 18 CFR 385.214, within 21
days of the date of issuance of the order.
Dated: January 18, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-01250 Filed 1-23-18; 8:45 am]
BILLING CODE 6717-01-P