Federal Register / Vol. 83, No. 12 / Thursday, January 18, 2018 / Notices
Applicants: Access Energy Solutions,
LLC.
Description: Baseline eTariff Filing:
MBR Tariff to be effective 1/31/2018.
Filed Date: 1/11/18.
Accession Number: 20180111–5081.
Comments Due: 5 p.m. ET 2/1/18.
Docket Numbers: ER18–635–000.
Applicants: Sierra Pacific Power
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 71—CalPeco & SPPC 609
Line Termination Agr to be effective 1/
12/2018.
Filed Date: 1/11/18.
Accession Number: 20180111–5105.
Comments Due: 5 p.m. ET 2/1/18.
Docket Numbers: ER18–636–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–01–11_Revisions to update
Attachment X: Appendix 1
Interconnection Request to be effective
3/1/2018.
Filed Date: 1/11/18.
Accession Number: 20180111–5113.
Comments Due: 5 p.m. ET 2/1/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–00742 Filed 1–17–18; 8:45 am]
BILLING CODE 6717–01–P
sradovich on DSK3GMQ082PROD with NOTICES
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14715–001]
Lock +TM Hydro Friends Fund XII;
Notice of Surrender of Preliminary
Permit
Take notice that Lock +TM Hydro
Friends Fund XII, permittee for the
VerDate Sep<11>2014
18:27 Jan 17, 2018
Jkt 244001
proposed Hepburn Street Dam
Hydroelectric Project, has requested that
its preliminary permit be terminated.
The permit was issued on February 10,
2016, and would have expired on
January 31, 2019.1 The project would
have been located on West Branch of the
Susquehanna River, near Williamsport,
Lycoming County, Pennsylvania.
The preliminary permit for Project
No. 14715 will remain in effect until the
close of business, February 9, 2018. But,
if the Commission is closed on this day,
then the permit remains in effect until
the close of business on the next day in
which the Commission is open.2 New
applications for this site may not be
submitted until after the permit
surrender is effective.
Dated: January 10, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–00747 Filed 1–17–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12966–005; Docket No. EL18–
56–000]
Utah Board of Water Resources;
Notice Suspending Procedural
Schedule
On December 11, 2017, the
Commission issued notice that the
license application for the proposed
Lake Powell Pipeline Project No. 12966
is accepted for filing, soliciting motions
to intervene and protests, ready for
environmental analysis, and soliciting
comments, recommendations, terms and
conditions, and prescriptions. The
notice established a deadline of 60 days
from issuance for initial filings and 105
days from issuance for reply comments.
On December 27, 2017, Utah Board of
Water Resources (Utah BWR), applicant
for the proposed Lake Powell Pipeline
Project, filed a petition for declaratory
order (petition) pursuant to Rule
207(a)(2) of the Federal Energy
Regulatory Commission’s Rules of
Practice and Procedure, 18 CFR
385.207(a)(2). Utah BWR requests that
the Commission declare that the
Commission’s licensing jurisdiction
under the Federal Power Act (FPA)
includes all of the project facilities
identified in the license application as
the ‘‘Hydro System,’’ in particular, the
penstock alignments there described as
associated with the hydroelectric
1 154
2 18
PO 00000
FERC ¶ 62,094 (2016).
CFR 385.2007(a)(2) (2017).
Frm 00017
Fmt 4703
Sfmt 4703
2631
generating facilities. Together with the
petition, Utah BWR filed a motion to
suspend the procedural schedule for the
licensing proceeding until the
Commission rules on the petition.
The Commission is requesting
comments on the petition by separate
notice. Utah BWR asserts that the
Commission’s resolution of the
jurisdictional issues may affect the
status under sections 4(e) and 33 of the
FPA of any preliminary conditions
provided by the Bureau of Land
Management (BLM) for the 50 miles of
penstock alignments in the Hydro
System that would traverse BLM lands
using the Southern Route, or provided
by the Bureau of Indian Affairs (BIA) for
the 16.5 miles of penstock alignments in
the Hydro System that would traverse
the Kaibab Indian Reservation under the
alternative route. To avoid possible
confusion regarding these preliminary
conditions, Utah BWR’s request to
suspend the procedural schedule is
granted, effective immediately, until
after the Commission issues a decision
on the petition. Therefore, the deadline
for filing motions to intervene and
protests, comments, recommendations,
terms and conditions, and prescriptions
is extended to 60 days after issuance of
a Commission decision on the petition,
and the deadline for filing reply
comments is extended to 105 days after
issuance of a Commission decision on
the petition.
Dated: January 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–00752 Filed 1–17–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2912–006.
Applicants: Alliance for Cooperative
Energy Services Power Marketing LLC.
Description: Notice of Non-Material
Change in Status of Alliance For
Cooperative Energy Services Power
Marketing LLC.
Filed Date: 1/9/18.
Accession Number: 20180109–5063.
Comments Due: 5 p.m. ET 1/30/18.
Docket Numbers: ER13–1667–002.
Applicants: Battery Utility of Ohio,
LLC.
Description: Notice of Change in
Status of Battery Utility of Ohio, LLC.
E:\FR\FM\18JAN1.SGM
18JAN1
Agencies
[Federal Register Volume 83, Number 12 (Thursday, January 18, 2018)]
[Notices]
[Page 2631]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-00752]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12966-005; Docket No. EL18-56-000]
Utah Board of Water Resources; Notice Suspending Procedural
Schedule
On December 11, 2017, the Commission issued notice that the license
application for the proposed Lake Powell Pipeline Project No. 12966 is
accepted for filing, soliciting motions to intervene and protests,
ready for environmental analysis, and soliciting comments,
recommendations, terms and conditions, and prescriptions. The notice
established a deadline of 60 days from issuance for initial filings and
105 days from issuance for reply comments.
On December 27, 2017, Utah Board of Water Resources (Utah BWR),
applicant for the proposed Lake Powell Pipeline Project, filed a
petition for declaratory order (petition) pursuant to Rule 207(a)(2) of
the Federal Energy Regulatory Commission's Rules of Practice and
Procedure, 18 CFR 385.207(a)(2). Utah BWR requests that the Commission
declare that the Commission's licensing jurisdiction under the Federal
Power Act (FPA) includes all of the project facilities identified in
the license application as the ``Hydro System,'' in particular, the
penstock alignments there described as associated with the
hydroelectric generating facilities. Together with the petition, Utah
BWR filed a motion to suspend the procedural schedule for the licensing
proceeding until the Commission rules on the petition.
The Commission is requesting comments on the petition by separate
notice. Utah BWR asserts that the Commission's resolution of the
jurisdictional issues may affect the status under sections 4(e) and 33
of the FPA of any preliminary conditions provided by the Bureau of Land
Management (BLM) for the 50 miles of penstock alignments in the Hydro
System that would traverse BLM lands using the Southern Route, or
provided by the Bureau of Indian Affairs (BIA) for the 16.5 miles of
penstock alignments in the Hydro System that would traverse the Kaibab
Indian Reservation under the alternative route. To avoid possible
confusion regarding these preliminary conditions, Utah BWR's request to
suspend the procedural schedule is granted, effective immediately,
until after the Commission issues a decision on the petition.
Therefore, the deadline for filing motions to intervene and protests,
comments, recommendations, terms and conditions, and prescriptions is
extended to 60 days after issuance of a Commission decision on the
petition, and the deadline for filing reply comments is extended to 105
days after issuance of a Commission decision on the petition.
Dated: January 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-00752 Filed 1-17-18; 8:45 am]