Download as PDF Federal Register / Vol. 83, No. 12 / Thursday, January 18, 2018 / Notices Applicants: Access Energy Solutions, LLC. Description: Baseline eTariff Filing: MBR Tariff to be effective 1/31/2018. Filed Date: 1/11/18. Accession Number: 20180111–5081. Comments Due: 5 p.m. ET 2/1/18. Docket Numbers: ER18–635–000. Applicants: Sierra Pacific Power Company. Description: § 205(d) Rate Filing: Rate Schedule No. 71—CalPeco & SPPC 609 Line Termination Agr to be effective 1/ 12/2018. Filed Date: 1/11/18. Accession Number: 20180111–5105. Comments Due: 5 p.m. ET 2/1/18. Docket Numbers: ER18–636–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–01–11_Revisions to update Attachment X: Appendix 1 Interconnection Request to be effective 3/1/2018. Filed Date: 1/11/18. Accession Number: 20180111–5113. Comments Due: 5 p.m. ET 2/1/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 11, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–00742 Filed 1–17–18; 8:45 am] BILLING CODE 6717–01–P sradovich on DSK3GMQ082PROD with NOTICES DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14715–001] Lock +TM Hydro Friends Fund XII; Notice of Surrender of Preliminary Permit Take notice that Lock +TM Hydro Friends Fund XII, permittee for the VerDate Sep<11>2014 18:27 Jan 17, 2018 Jkt 244001 proposed Hepburn Street Dam Hydroelectric Project, has requested that its preliminary permit be terminated. The permit was issued on February 10, 2016, and would have expired on January 31, 2019.1 The project would have been located on West Branch of the Susquehanna River, near Williamsport, Lycoming County, Pennsylvania. The preliminary permit for Project No. 14715 will remain in effect until the close of business, February 9, 2018. But, if the Commission is closed on this day, then the permit remains in effect until the close of business on the next day in which the Commission is open.2 New applications for this site may not be submitted until after the permit surrender is effective. Dated: January 10, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–00747 Filed 1–17–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12966–005; Docket No. EL18– 56–000] Utah Board of Water Resources; Notice Suspending Procedural Schedule On December 11, 2017, the Commission issued notice that the license application for the proposed Lake Powell Pipeline Project No. 12966 is accepted for filing, soliciting motions to intervene and protests, ready for environmental analysis, and soliciting comments, recommendations, terms and conditions, and prescriptions. The notice established a deadline of 60 days from issuance for initial filings and 105 days from issuance for reply comments. On December 27, 2017, Utah Board of Water Resources (Utah BWR), applicant for the proposed Lake Powell Pipeline Project, filed a petition for declaratory order (petition) pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s Rules of Practice and Procedure, 18 CFR 385.207(a)(2). Utah BWR requests that the Commission declare that the Commission’s licensing jurisdiction under the Federal Power Act (FPA) includes all of the project facilities identified in the license application as the ‘‘Hydro System,’’ in particular, the penstock alignments there described as associated with the hydroelectric 1 154 2 18 PO 00000 FERC ¶ 62,094 (2016). CFR 385.2007(a)(2) (2017). Frm 00017 Fmt 4703 Sfmt 4703 2631 generating facilities. Together with the petition, Utah BWR filed a motion to suspend the procedural schedule for the licensing proceeding until the Commission rules on the petition. The Commission is requesting comments on the petition by separate notice. Utah BWR asserts that the Commission’s resolution of the jurisdictional issues may affect the status under sections 4(e) and 33 of the FPA of any preliminary conditions provided by the Bureau of Land Management (BLM) for the 50 miles of penstock alignments in the Hydro System that would traverse BLM lands using the Southern Route, or provided by the Bureau of Indian Affairs (BIA) for the 16.5 miles of penstock alignments in the Hydro System that would traverse the Kaibab Indian Reservation under the alternative route. To avoid possible confusion regarding these preliminary conditions, Utah BWR’s request to suspend the procedural schedule is granted, effective immediately, until after the Commission issues a decision on the petition. Therefore, the deadline for filing motions to intervene and protests, comments, recommendations, terms and conditions, and prescriptions is extended to 60 days after issuance of a Commission decision on the petition, and the deadline for filing reply comments is extended to 105 days after issuance of a Commission decision on the petition. Dated: January 11, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–00752 Filed 1–17–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2912–006. Applicants: Alliance for Cooperative Energy Services Power Marketing LLC. Description: Notice of Non-Material Change in Status of Alliance For Cooperative Energy Services Power Marketing LLC. Filed Date: 1/9/18. Accession Number: 20180109–5063. Comments Due: 5 p.m. ET 1/30/18. Docket Numbers: ER13–1667–002. Applicants: Battery Utility of Ohio, LLC. Description: Notice of Change in Status of Battery Utility of Ohio, LLC. E:\FR\FM\18JAN1.SGM 18JAN1

Agencies

[Federal Register Volume 83, Number 12 (Thursday, January 18, 2018)]
[Notices]
[Page 2631]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-00747]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14715-001]


Lock +TM Hydro Friends Fund XII; Notice of Surrender 
of Preliminary Permit

    Take notice that Lock +TM Hydro Friends Fund XII, 
permittee for the proposed Hepburn Street Dam Hydroelectric Project, 
has requested that its preliminary permit be terminated. The permit was 
issued on February 10, 2016, and would have expired on January 31, 
2019.\1\ The project would have been located on West Branch of the 
Susquehanna River, near Williamsport, Lycoming County, Pennsylvania.
---------------------------------------------------------------------------

    \1\ 154 FERC ] 62,094 (2016).
---------------------------------------------------------------------------

    The preliminary permit for Project No. 14715 will remain in effect 
until the close of business, February 9, 2018. But, if the Commission 
is closed on this day, then the permit remains in effect until the 
close of business on the next day in which the Commission is open.\2\ 
New applications for this site may not be submitted until after the 
permit surrender is effective.
---------------------------------------------------------------------------

    \2\ 18 CFR 385.2007(a)(2) (2017).

    Dated: January 10, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-00747 Filed 1-17-18; 8:45 am]
 BILLING CODE 6717-01-P