Elkhart & Western Railroad Co.-Acquisition and Operation Exemption-Line of CSX Transportation, Inc. Between Monon and Monticello, in White County, Ind., 1656 [2018-00419]
Download as PDF
sradovich on DSK3GMQ082PROD with NOTICES
1656
Federal Register / Vol. 83, No. 9 / Friday, January 12, 2018 / Notices
BorregoReview@state.gov from: Borrego
Project Manager, Office of
Environmental Quality and
Transboundary Issues (OES/EQT): Suite
2726, U.S. Department of State, 2201 C
Street NW, Washington, DC 20520.
SUPPLEMENTARY INFORMATION: Executive
Order (E.O.) 13337 delegates to the
Secretary of State the President’s
authority to receive applications for
permits for the construction,
connection, operation, or maintenance
of facilities for the exportation or
importation of petroleum, petroleum
products, coal, or other fuels (except for
natural gas), at the borders of the United
States, and to issue or deny such
Presidential permits upon a national
interest determination.
On August 12, 2016, Borrego
submitted an application for a new
Presidential permit that would
authorize the construction, connection,
operation, and maintenance of facilities
at the U.S.-Mexico border for the export
to Mexico of refined petroleum products
(including gasoline, premium gasoline,
ultra-low sulfur diesel, and jet fuel). The
petroleum products would be
transported through the new pipeline
between a new terminal in Laredo,
Texas, and the existing Nuevo Laredo
Terminal in Tamaulipas, Mexico.
The Department prepared the Final
EA consistent with the National
Environmental Policy Act (NEPA) of
1969, as amended (42 U.S.C. Section
4321, et seq.), the regulations of the
Council on Environmental Quality
(CEQ) (40 CFR parts 1500–1508), and
the Department’s implementing
regulations (22 CFR part 161). The Draft
EA and Preliminary FONSI were
available for a 30-day public review that
ended on November 17, 2017. The
Department has determined the
proposed action would not result in
significant impacts on the environment
and therefore the preparation of an
Environmental Impact Statement is not
required. The FONSI is not a decision
on the Presidential permit application.
In accordance with E.O. 13337, the
Secretary of State or his delegate will
make a determination as to whether
issuance of a Presidential permit for
Borrego Crossing Pipeline, LLC
(Borrego), a subsidiary of Howard
Midstream Energy Partners, LLC,
proposed cross-border pipeline facilities
project would serve the national
interest.
Robert Wing,
Acting Director, Office of Environmental
Quality and Transboundary Issues,
Department of State.
[FR Doc. 2018–00472 Filed 1–11–18; 8:45 am]
17:47 Jan 11, 2018
[Docket No. FD 36163]
Elkhart & Western Railroad Co.—
Acquisition and Operation
Exemption—Line of CSX
Transportation, Inc. Between Monon
and Monticello, in White County, Ind.
Elkhart & Western Railroad Co.
(EWR), a Class III rail carrier, has filed
a verified notice of exemption under 49
CFR 1150.41 to acquire and operate 9.58
miles of rail line owned by CSX
Transportation, Inc. (CSXT) between
Monon, Ind., (Milepost 0QA–88.42) and
Monticello, Ind., (Milepost 0QA–98.00)
in White County, Ind. (the Line).
EWR states that it has reached
agreement in principle with CSXT, the
current owner and operator of the Line,
providing for EWR to acquire, operate,
maintain, and perform all common
carrier service on the Line. EWR states
that it will interchange with CSXT at
Monon, Ind. EWR also states that the
proposed acquisition and operation of
the Line does not involve a provision or
agreement that would limit future
interchange with a third-party
connecting carrier.
EWR certifies that the proposed
transaction will not result in EWR
becoming a Class II or Class I rail carrier
and that the projected annual revenue of
EWR will not exceed $5 million.
The transaction may be consummated
on or after January 27, 2018, the
effective date of the exemption (30 days
after the verified notice was filed).
If the verified notice contains false or
misleading information, the exemption
is void ab initio. Petitions to revoke the
exemption under 49 U.S.C. 10502(d)
may be filed at any time. The filing of
a petition to revoke will not
automatically stay the effectiveness of
the exemption. Petitions for stay must
be filed no later than January 19, 2018
(at least seven days before the
exemption becomes effective).
An original and 10 copies of all
pleadings, referring to Docket No.
36163, must be filed with the Surface
Transportation Board, 395 E Street SW,
Washington, DC 20423–0001. In
addition, one copy of each pleading
must be served on Daniel A. LaKemper,
Elkhart & Western Railroad Co., 1318 S.
Johanson Road, Peoria, IL 61607.
According to EWR, this action is
categorically excluded from
environmental review under 49 CFR
1105.6(c) and from historic reporting
requirements under 49 CFR 105.8(b).
Board decisions and notices are
available on our website at
WWW.STB.GOV.
Decided: January 8, 2018.
BILLING CODE 4710–09–P
VerDate Sep<11>2014
SURFACE TRANSPORTATION BOARD
Jkt 244001
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
By the Board, Scott M. Zimmerman, Acting
Director, Office of Proceedings.
Rena Laws-Byrum,
Clearance Clerk.
[FR Doc. 2018–00419 Filed 1–11–18; 8:45 am]
BILLING CODE 4915–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Actions Taken at December 8, 2017,
Meeting
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
As part of its regular business
meeting held on December 8, 2017, in
Annapolis, Maryland, the Commission
took the following actions: (1) Approved
or tabled the applications of certain
water resources projects; and (2) took
additional actions, as set forth in the
Supplementary Information below.
DATES: December 8, 2017.
ADDRESSES: Susquehanna River Basin
Commission, 4423 N. Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel,
telephone: 717–238–0423, ext. 1312;
fax: 717–238–2436; joyler@srbc.net.
Regular mail inquiries may be sent to
the above address. See also Commission
website at www.srbc.net.
SUPPLEMENTARY INFORMATION: In
addition to the actions taken on projects
identified in the summary above and the
listings below, the following items were
also presented or acted upon at the
business meeting: (1) Adoption of a
resolution urging President Trump and
the United State Congress to provide
full funding for the national
Groundwater and Streamflow
Information Program, thereby
supporting the Susquehanna Flood
Forecast & Warning System; (2)
adoption of amended Commission’s Bylaws and Procedures to reflect revisions
to officers’ duties, clarification of budget
and financial procedures, and other
changes in accordance with the
Susquehanna River Basin Compact; (3)
approval of a grant amendment and
acceptance of a contribution; (4)
adoption of final rules, subject to final
member jurisdiction review, pertaining
to the amendment of Commission
regulations to codify and strengthen the
Commission’s Access to Records Policy.
SUMMARY:
Project Applications Approved
The Commission approved the
following project applications:
1. Project Sponsor and Facility: Beech
Creek Borough Authority, Beech Creek
E:\FR\FM\12JAN1.SGM
12JAN1
Agencies
[Federal Register Volume 83, Number 9 (Friday, January 12, 2018)]
[Notices]
[Page 1656]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-00419]
=======================================================================
-----------------------------------------------------------------------
SURFACE TRANSPORTATION BOARD
[Docket No. FD 36163]
Elkhart & Western Railroad Co.--Acquisition and Operation
Exemption--Line of CSX Transportation, Inc. Between Monon and
Monticello, in White County, Ind.
Elkhart & Western Railroad Co. (EWR), a Class III rail carrier, has
filed a verified notice of exemption under 49 CFR 1150.41 to acquire
and operate 9.58 miles of rail line owned by CSX Transportation, Inc.
(CSXT) between Monon, Ind., (Milepost 0QA-88.42) and Monticello, Ind.,
(Milepost 0QA-98.00) in White County, Ind. (the Line).
EWR states that it has reached agreement in principle with CSXT,
the current owner and operator of the Line, providing for EWR to
acquire, operate, maintain, and perform all common carrier service on
the Line. EWR states that it will interchange with CSXT at Monon, Ind.
EWR also states that the proposed acquisition and operation of the Line
does not involve a provision or agreement that would limit future
interchange with a third-party connecting carrier.
EWR certifies that the proposed transaction will not result in EWR
becoming a Class II or Class I rail carrier and that the projected
annual revenue of EWR will not exceed $5 million.
The transaction may be consummated on or after January 27, 2018,
the effective date of the exemption (30 days after the verified notice
was filed).
If the verified notice contains false or misleading information,
the exemption is void ab initio. Petitions to revoke the exemption
under 49 U.S.C. 10502(d) may be filed at any time. The filing of a
petition to revoke will not automatically stay the effectiveness of the
exemption. Petitions for stay must be filed no later than January 19,
2018 (at least seven days before the exemption becomes effective).
An original and 10 copies of all pleadings, referring to Docket No.
36163, must be filed with the Surface Transportation Board, 395 E
Street SW, Washington, DC 20423-0001. In addition, one copy of each
pleading must be served on Daniel A. LaKemper, Elkhart & Western
Railroad Co., 1318 S. Johanson Road, Peoria, IL 61607.
According to EWR, this action is categorically excluded from
environmental review under 49 CFR 1105.6(c) and from historic reporting
requirements under 49 CFR 105.8(b).
Board decisions and notices are available on our website at
WWW.STB.GOV.
Decided: January 8, 2018.
By the Board, Scott M. Zimmerman, Acting Director, Office of
Proceedings.
Rena Laws-Byrum,
Clearance Clerk.
[FR Doc. 2018-00419 Filed 1-11-18; 8:45 am]
BILLING CODE 4915-01-P