Combined Notice of Filings #1, 796-797 [2018-00097]
Download as PDF
sradovich on DSK3GMQ082PROD with NOTICES
796
Federal Register / Vol. 83, No. 5 / Monday, January 8, 2018 / Notices
response to this notice will be
considered public records.
Title of Collection: Impact Evaluation
of Departmentalized Instruction in
Elementary Schools.
OMB Control Number: 1850–NEW.
Type of Review: A new information
collection.
Respondents/Affected Public:
Individuals or Households.
Total Estimated Number of Annual
Responses: 2,844.
Total Estimated Number of Annual
Burden Hours: 1,091.
Abstract: This package requests
clearance for data collection activities to
support an evaluation of
departmentalized instruction in
elementary schools. This evaluation is
authorized by Title VII Section 8601 of
the Elementary and Secondary
Education Act, as amended most
recently in 2015 by the Every Student
Succeeds Act (ESSA). ESSA gives states
considerable flexibility in designing
systems to hold their schools
accountable for improving student
achievement. This flexibility extends to
the types of strategies that states
encourage or require their lowperforming schools to adopt. However,
many strategies in use have little to no
evidence of effectiveness. More research
is needed to help states identify
strategies that are likely to help their
low-performing schools improve.
One potential strategy that has
recently become more popular in upper
elementary school grades is to
departmentalize instruction, where each
teacher specializes in teaching one
subject to multiple classes of students
instead of teaching all subjects to a
single class of students (self-contained
instruction). However, virtually no
evidence exists on its effectiveness
relative to the more traditional selfcontained approach. This evaluation
will help to fill the gap by examining
whether departmentalizing fourth and
fifth grade teachers improves teacher
and student outcomes. The evaluation
will focus on math and reading, with an
emphasis on low-performing schools
that serve a high percentage of
disadvantaged students.
The evaluation will include
implementation and impact analyses.
The implementation analysis will
describe schools’ approaches to
departmentalization and benefits and
challenges encountered. The analysis
will be based on information from
schools’ study agreement form; meetings
to design each school’s approach to
departmentalization; monitoring and
support calls with schools; a principal
interview; and a teacher survey. The
impact analysis will draw on data from
VerDate Sep<11>2014
16:29 Jan 05, 2018
Jkt 244001
a teacher survey, videos of classroom
instruction, a principal interview, and
district administrative records to
estimate the impact of departmentalized
instruction on various outcomes. The
outcomes include the quality of
instruction and student-teacher
relationships, teacher satisfaction and
retention, and student achievement and
behavior. These various data collection
activities will be carried out between
spring 2018 and fall 2020, although
most of the activities with the exception
of the administrative data will take
place only once during the first year
treatment schools implement
departmentalized instruction (2018–
2019 school year).
Dated: January 3, 2018.
Stephanie Valentine,
Acting Director, Information Collection
Clearance Division, Office of the Chief Privacy
Officer, Office of Management.
[FR Doc. 2018–00108 Filed 1–5–18; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–43–000.
Applicants: South Central MCN LLC.
Description: Application of South
Central MCN LLC for Authorization
under Section 203 of the Federal Power
Act, et al.
Filed Date: 12/29/17.
Accession Number: 20171229–5213.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: EC18–44–000.
Applicants: Otter Tail Power
Company.
Description: Request For Approvals
Pursuant to Section 203 of the Federal
Power Act of Otter Tail Power
Company.
Filed Date: 12/29/17.
Accession Number: 20171229–5234.
Comments Due: 5 p.m. ET 1/19/18.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–26–000.
Applicants: Lincoln Clean Energy,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status (Tahoka Wind, LLC).
Filed Date: 12/29/17.
Accession Number: 20171229–5278.
Comments Due: 5 p.m. ET 1/19/18.
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–3199–004.
Applicants: MDU Resources Inc.
Description: Updated Market Analysis
in the Central Region of MDU Resources
Inc.
Filed Date: 12/29/17.
Accession Number: 20171229–5282.
Comments Due: 5 p.m. ET 2/27/18.
Docket Numbers: ER15–1596–005;
ER15–1599–005; ER14–1569–006;
ER10–2616–012; ER11–4398–007;
ER11–4400–009; ER15–1958–004;
ER10–3247–012; ER14–922–005; ER14–
883–007; ER14–924–005; ER15–2535–
002.
Applicants: Dynegy Commercial Asset
Management, LLC, Dynegy Energy
Services (East), LLC, Dynegy Energy
Services, LLC, Dynegy Marketing and
Trade, LLC, Dynegy Midwest
Generation, LLC, Dynegy Power
Marketing, LLC, Dynegy Resources
Management, LLC, Electric Energy, Inc.,
Illinois Power Generating Company,
Illinois Power Marketing Company,
Illinois Power Resources Generating,
LLC, Midwest Electric Power, Inc.
Description: Updated Market Power
Analysis of the Dynegy Central MBR
Sellers.
Filed Date: 12/29/17.
Accession Number: 20171229–5225.
Comments Due: 5 p.m. ET 2/27/18.
Docket Numbers: ER18–573–000.
Applicants: Montpelier Generating
Station, LLC.
Description: § 205(d) Rate Filing:
Reactive Power Rate Schedule to be
effective 12/31/9998.
Filed Date: 12/29/17.
Accession Number: 20171229–5204.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: ER18–574–000.
Applicants: Monument Generating
Station, LLC.
Description: § 205(d) Rate Filing:
Reactive Power Rate Schedule to be
effective 12/31/9998.
Filed Date: 12/29/17.
Accession Number: 20171229–5205.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: ER18–575–000.
Applicants: O.H. Hutchings CT, LLC.
Description: § 205(d) Rate Filing:
Reactive Power Rate Schedule to be
effective 12/31/9998.
Filed Date: 12/29/17.
Accession Number: 20171229–5206.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: ER18–576–000.
Applicants: Sidney, LLC.
Description: § 205(d) Rate Filing:
Reactive Power Rate Schedule to be
effective 12/31/9998.
E:\FR\FM\08JAN1.SGM
08JAN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 83, No. 5 / Monday, January 8, 2018 / Notices
Filed Date: 12/29/17.
Accession Number: 20171229–5207.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: ER18–577–000.
Applicants: Tait Electric Generating
Station, LLC.
Description: § 205(d) Rate Filing:
Reactive Power Rate Schedule to be
effective 12/31/9998.
Filed Date: 12/29/17.
Accession Number: 20171229–5208.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: ER18–578–000.
Applicants: Yankee Street, LLC.
Description: § 205(d) Rate Filing:
Reactive Power Rate Schedule to be
effective 12/31/9998.
Filed Date: 12/29/17.
Accession Number: 20171229–5209.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: ER18–579–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to OATT Sch 12-Appdx and
Appdx A re: 2018 RTEP Annual Cost
Allocations to be effective 1/1/2018.
Filed Date: 12/29/17.
Accession Number: 20171229–5210.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: ER18–580–000.
Applicants: PE Berkeley, Inc.
Description: Tariff Cancellation: PE
Berkeley Notice of Cancellation to be
effective 1/2/2018.
Filed Date: 1/2/18.
Accession Number: 20180102–5000.
Comments Due: 5 p.m. ET 1/23/18.
Docket Numbers: ER18–581–000.
Applicants: Public Service Company
of New Mexico.
Description: Initial rate filing: 62 MW
TSA No. 493 between PNM and
Avangrid Renewables to be effective 12/
18/2017.
Filed Date: 1/2/18.
Accession Number: 20180102–5223.
Comments Due: 5 p.m. ET 1/23/18.
Docket Numbers: ER18–582–000.
Applicants: Public Service Company
of New Mexico.
Description: Initial rate filing: 100
MW TSA No. 494 between PNM and
Avangrid Renewables to be effective 12/
18/2017.
Filed Date: 1/2/18.
Accession Number: 20180102–5224.
Comments Due: 5 p.m. ET 1/23/18.
Docket Numbers: ER18–583–000.
Applicants: Public Service Company
of New Mexico.
Description: Initial rate filing: 100
MW TSA No. 495 between PNM and
Avangrid Renewables to be effective 12/
18/2017.
Filed Date: 1/2/18.
Accession Number: 20180102–5225.
VerDate Sep<11>2014
16:29 Jan 05, 2018
Jkt 244001
Comments Due: 5 p.m. ET 1/23/18.
Docket Numbers: ER18–584–000.
Applicants: Public Service Company
of New Mexico.
Description: § 205(d) Rate Filing: 100
MW First Revised TSA No. 494 between
PNM and Avangrid Renewables to be
effective 12/20/2017.
Filed Date: 1/2/18.
Accession Number: 20180102–5226.
Comments Due: 5 p.m. ET 1/23/18.
Docket Numbers: ER18–585–000.
Applicants: Public Service Company
of New Mexico.
Description: § 205(d) Rate Filing: 100
MW First Revised TSA No. 495 between
PNM and Avangrid Renewables to be
effective 12/20/2017.
Filed Date: 1/2/18.
Accession Number: 20180102–5227.
Comments Due: 5 p.m. ET 1/23/18.
Docket Numbers: ER18–586–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Queue Position AC2–137, Original
Service Agreement No. 4880 to be
effective 12/1/2017.
Filed Date: 1/2/18.
Accession Number: 20180102–5228.
Comments Due: 5 p.m. ET 1/23/18.
Docket Numbers: ER18–587–000.
Applicants: Tucson Electric Power
Company.
Description: § 205(d) Rate Filing:
Generator Interconnection Agreement to
be effective 3/5/2018.
Filed Date: 1/2/18.
Accession Number: 20180102–5323.
Comments Due: 5 p.m. ET 1/23/18.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES18–18–000.
Applicants: Michigan Electric
Transmission Company, LLC.
Description: Application of Michigan
Electric Transmission Company, LLC
under Section 204 of the Federal Power
Act.
Filed Date: 1/2/18.
Accession Number: 20180102–5106.
Comments Due: 5 p.m. ET 1/23/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
797
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 2, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–00097 Filed 1–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP18–295–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Compliance filing
Compliance Tariff Filing re CP15–517–
000 (Coastal Bend) to be effective 2/1/
2018.
Filed Date: 12/29/17.
Accession Number: 20171229–5021.
Comments Due: 5 p.m. ET 1/10/18.
Docket Numbers: RP18–296–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Compliance filing
Compliance Negotiated Rate Agmt Tariff
Filing re CP15–517–000 (Coastal Bend)
to be effective 2/1/2018.
Filed Date: 12/29/17.
Accession Number: 20171229–5025.
Comments Due: 5 p.m. ET 1/10/18.
Docket Numbers: RP18–297–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 122917
154.204 Tariff Filing to be effective 3/1/
2018.
Filed Date: 12/29/17.
Accession Number: 20171229–5039.
Comments Due: 5 p.m. ET 1/10/18.
Docket Numbers: RP18–298–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: CCRM
2018 to be effective 2/1/2018.
Filed Date: 12/29/17.
Accession Number: 20171229–5143.
Comments Due: 5 p.m. ET 1/10/18.
Docket Numbers: RP18–298–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: CCRM
2018 to be effective 2/1/2018.
Filed Date: 12/29/17.
E:\FR\FM\08JAN1.SGM
08JAN1
Agencies
[Federal Register Volume 83, Number 5 (Monday, January 8, 2018)]
[Notices]
[Pages 796-797]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-00097]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-43-000.
Applicants: South Central MCN LLC.
Description: Application of South Central MCN LLC for Authorization
under Section 203 of the Federal Power Act, et al.
Filed Date: 12/29/17.
Accession Number: 20171229-5213.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: EC18-44-000.
Applicants: Otter Tail Power Company.
Description: Request For Approvals Pursuant to Section 203 of the
Federal Power Act of Otter Tail Power Company.
Filed Date: 12/29/17.
Accession Number: 20171229-5234.
Comments Due: 5 p.m. ET 1/19/18.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG18-26-000.
Applicants: Lincoln Clean Energy, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status (Tahoka Wind, LLC).
Filed Date: 12/29/17.
Accession Number: 20171229-5278.
Comments Due: 5 p.m. ET 1/19/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-3199-004.
Applicants: MDU Resources Inc.
Description: Updated Market Analysis in the Central Region of MDU
Resources Inc.
Filed Date: 12/29/17.
Accession Number: 20171229-5282.
Comments Due: 5 p.m. ET 2/27/18.
Docket Numbers: ER15-1596-005; ER15-1599-005; ER14-1569-006; ER10-
2616-012; ER11-4398-007; ER11-4400-009; ER15-1958-004; ER10-3247-012;
ER14-922-005; ER14-883-007; ER14-924-005; ER15-2535-002.
Applicants: Dynegy Commercial Asset Management, LLC, Dynegy Energy
Services (East), LLC, Dynegy Energy Services, LLC, Dynegy Marketing and
Trade, LLC, Dynegy Midwest Generation, LLC, Dynegy Power Marketing,
LLC, Dynegy Resources Management, LLC, Electric Energy, Inc., Illinois
Power Generating Company, Illinois Power Marketing Company, Illinois
Power Resources Generating, LLC, Midwest Electric Power, Inc.
Description: Updated Market Power Analysis of the Dynegy Central
MBR Sellers.
Filed Date: 12/29/17.
Accession Number: 20171229-5225.
Comments Due: 5 p.m. ET 2/27/18.
Docket Numbers: ER18-573-000.
Applicants: Montpelier Generating Station, LLC.
Description: Sec. 205(d) Rate Filing: Reactive Power Rate Schedule
to be effective 12/31/9998.
Filed Date: 12/29/17.
Accession Number: 20171229-5204.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: ER18-574-000.
Applicants: Monument Generating Station, LLC.
Description: Sec. 205(d) Rate Filing: Reactive Power Rate Schedule
to be effective 12/31/9998.
Filed Date: 12/29/17.
Accession Number: 20171229-5205.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: ER18-575-000.
Applicants: O.H. Hutchings CT, LLC.
Description: Sec. 205(d) Rate Filing: Reactive Power Rate Schedule
to be effective 12/31/9998.
Filed Date: 12/29/17.
Accession Number: 20171229-5206.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: ER18-576-000.
Applicants: Sidney, LLC.
Description: Sec. 205(d) Rate Filing: Reactive Power Rate Schedule
to be effective 12/31/9998.
[[Page 797]]
Filed Date: 12/29/17.
Accession Number: 20171229-5207.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: ER18-577-000.
Applicants: Tait Electric Generating Station, LLC.
Description: Sec. 205(d) Rate Filing: Reactive Power Rate Schedule
to be effective 12/31/9998.
Filed Date: 12/29/17.
Accession Number: 20171229-5208.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: ER18-578-000.
Applicants: Yankee Street, LLC.
Description: Sec. 205(d) Rate Filing: Reactive Power Rate Schedule
to be effective 12/31/9998.
Filed Date: 12/29/17.
Accession Number: 20171229-5209.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: ER18-579-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to OATT Sch 12-
Appdx and Appdx A re: 2018 RTEP Annual Cost Allocations to be effective
1/1/2018.
Filed Date: 12/29/17.
Accession Number: 20171229-5210.
Comments Due: 5 p.m. ET 1/19/18.
Docket Numbers: ER18-580-000.
Applicants: PE Berkeley, Inc.
Description: Tariff Cancellation: PE Berkeley Notice of
Cancellation to be effective 1/2/2018.
Filed Date: 1/2/18.
Accession Number: 20180102-5000.
Comments Due: 5 p.m. ET 1/23/18.
Docket Numbers: ER18-581-000.
Applicants: Public Service Company of New Mexico.
Description: Initial rate filing: 62 MW TSA No. 493 between PNM and
Avangrid Renewables to be effective 12/18/2017.
Filed Date: 1/2/18.
Accession Number: 20180102-5223.
Comments Due: 5 p.m. ET 1/23/18.
Docket Numbers: ER18-582-000.
Applicants: Public Service Company of New Mexico.
Description: Initial rate filing: 100 MW TSA No. 494 between PNM
and Avangrid Renewables to be effective 12/18/2017.
Filed Date: 1/2/18.
Accession Number: 20180102-5224.
Comments Due: 5 p.m. ET 1/23/18.
Docket Numbers: ER18-583-000.
Applicants: Public Service Company of New Mexico.
Description: Initial rate filing: 100 MW TSA No. 495 between PNM
and Avangrid Renewables to be effective 12/18/2017.
Filed Date: 1/2/18.
Accession Number: 20180102-5225.
Comments Due: 5 p.m. ET 1/23/18.
Docket Numbers: ER18-584-000.
Applicants: Public Service Company of New Mexico.
Description: Sec. 205(d) Rate Filing: 100 MW First Revised TSA No.
494 between PNM and Avangrid Renewables to be effective 12/20/2017.
Filed Date: 1/2/18.
Accession Number: 20180102-5226.
Comments Due: 5 p.m. ET 1/23/18.
Docket Numbers: ER18-585-000.
Applicants: Public Service Company of New Mexico.
Description: Sec. 205(d) Rate Filing: 100 MW First Revised TSA No.
495 between PNM and Avangrid Renewables to be effective 12/20/2017.
Filed Date: 1/2/18.
Accession Number: 20180102-5227.
Comments Due: 5 p.m. ET 1/23/18.
Docket Numbers: ER18-586-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Queue Position AC2-137,
Original Service Agreement No. 4880 to be effective 12/1/2017.
Filed Date: 1/2/18.
Accession Number: 20180102-5228.
Comments Due: 5 p.m. ET 1/23/18.
Docket Numbers: ER18-587-000.
Applicants: Tucson Electric Power Company.
Description: Sec. 205(d) Rate Filing: Generator Interconnection
Agreement to be effective 3/5/2018.
Filed Date: 1/2/18.
Accession Number: 20180102-5323.
Comments Due: 5 p.m. ET 1/23/18.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES18-18-000.
Applicants: Michigan Electric Transmission Company, LLC.
Description: Application of Michigan Electric Transmission Company,
LLC under Section 204 of the Federal Power Act.
Filed Date: 1/2/18.
Accession Number: 20180102-5106.
Comments Due: 5 p.m. ET 1/23/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 2, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-00097 Filed 1-5-18; 8:45 am]
BILLING CODE 6717-01-P