Download as PDF Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Notices SP Cactus Flats Wind Energy, LLC. Caoxian Taida New Energy Company Limited. Altamuskin Windfarm Limited. Amplus Andhra Power Private Limited. EG17–157–000 FC17–6–000 FC17–7–000 FC17–8–000 Take notice that during the month of November 2017, the status of the abovecaptioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission’s regulations. 18 CFR 366.7(a) (2017). Dated: December 20, 2017. Nathaniel J. Davis, Sr., Deputy Secretary [FR Doc. 2017–27910 Filed 12–26–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2788–017] Federal Energy Regulatory Commission DEPARTMENT OF ENERGY Goodyear Lake Hydro, LLC; Notice Soliciting Scoping Comments [Docket No. NJ18–6–000] Federal Energy Regulatory Commission City of Riverside, California; Notice of Filing [Docket No. NJ18–3–000] Notice of Filing; City of Pasadena, California daltland on DSKBBV9HB2PROD with NOTICES Dated: December 20, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. BILLING CODE 6717–01–P BILLING CODE 6717–01–P Take notice that on December 13, 2017, City of Pasadena, California submitted its tariff filing: City of Pasadena 2018 TRBAA Update to be effective 1/1/2018. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for electronic review in the Commission’s Public 21:43 Dec 26, 2017 Dated: December 20, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on January 8, 2018. [FR Doc. 2017–27908 Filed 12–26–17; 8:45 am] [FR Doc. 2017–27904 Filed 12–26–17; 8:45 am] VerDate Sep<11>2014 Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on January 3, 2018. 61283 Jkt 244001 Take notice that on December 18, 2017, City of Riverside, California submitted its tariff filing: City of Riverside 2018 TRBAA/ETC Update to be effective 1/1/2018. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: 2788–017. c. Date filed: February 27, 2017. d. Applicant: Goodyear Lake Hydro, LLC (Goodyear Lake Hydro). e. Name of Project: Colliersville Hydroelectric Project. f. Location: On the North Branch of the Susquehanna River, in the Town of Milford, Otsego County, New York. The project does not occupy lands of the United States. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Kevin Webb, Hydro Licensing Manager; Enel Green Power North America, Inc., 100 Brickstone Square, Suite 300, Andover, MA 01810; (978) 935–6039; kevin.webb@enel.com. i. FERC Contact: Emily Carter, (202) 502–6512 or emily.carter@ferc.gov. j. Deadline for filing scoping comments: 30 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file scoping comments using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at E:\FR\FM\27DEN1.SGM 27DEN1 daltland on DSKBBV9HB2PROD with NOTICES 61284 Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Notices FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2788–017. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application is not ready for environmental analysis at this time. l. Project Description. The existing Colliersville Hydroelectric Project consists of: (1) A dam that includes: A 200-foot-long, 35foot-high, reinforced-concrete, Ambursen-type dam or spillway structure 1 with a crest elevation of 1,150.22 feet National Geodetic Vertical Datum of 1929 (NGVD 29); a 50-footwide concrete headgate structure located on the west side of the river and adjacent to the spillway, forming the closure with the west bank; and an L-shaped, 66-foot-long, concrete wall with one side along the east side of the spillway and the other side parallel to the axis of the dam, extending approximately 6 to 8 feet above the crest of the dam; (2) a 364-acre reservoir (Goodyear Lake) with a gross storage capacity of 7,800 acre-feet at a normal pool elevation of 1,150.22 feet NGVD29; (3) a 550-foot-long reinforced concrete power canal, approximately 50 feet wide and 6 feet deep at the head gates, extending from a head gate structure adjacent to the dam (i.e., the intake) to the powerhouse; (4) a 103-foot-long by 33-foot-wide reinforced concrete powerhouse with trash racks with a clear spacing of 1.5 inches, and containing two turbines rated at 850 horsepower (HP) and 1,150 HP, and two generators having a rated capacity of 650 kilowatts (kW) and 850 kW, respectively; (5) a 300-foot-long and approximately 50- to 60-foot-wide tailrace; (6) three, approximately 80foot-long, 4.16-kilovolt underground generator leads or transmission lines from the powerhouse to an adjacent substation owned by the New York State Electric and Gas Corporation; and (7) appurtenant facilities. Goodyear Lake Hydro operates the project in a run-of-river mode. The project experiences substantial seasonal and annual variations in generation, and generates an annual average of 5,985 megawatt-hours. Goodyear Lake Hydro proposes to continue to operate the project in run-of-river mode. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s web site at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to address the document. For assistance, contact FERC Online Support. A copy is available for inspection and reproduction at the address in item h above. n. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. Scoping Process The Commission staff intends to prepare an Environmental Assessment (EA) for the Colliersville Hydroelectric Project in accordance with the National Environmental Policy Act. The EA will consider both site-specific and cumulative environmental impacts and reasonable alternatives to the proposed action. Commission staff does not propose to conduct any on-site scoping meetings at this time. Instead, we are soliciting comments, recommendations, and information, on the Scoping Document 1 (SD1) issued December 20, 2017. Copies of SD1 outlining the subject areas to be addressed in the EA were distributed to the parties on the Commission’s mailing list. Copies of SD1 may be viewed on the web at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call 1–866–208–3676 or for TTY, (202) 502–8659. 1 A type of buttress dam of which the upstream part is a relatively thin flat slab usually made of reinforced concrete. A buttress dam consists of watertight parts supported at intervals on the downstream side by a series of buttresses. [FR Doc. 2017–27917 Filed 12–26–17; 8:45 am] VerDate Sep<11>2014 21:43 Dec 26, 2017 Jkt 244001 Dated: December 20, 2017. Kimberly D. Bose, Secretary. BILLING CODE 6717–01–P PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–24–000] Steel Reef Pipelines US LLC; Notice of Application for Section 3 Authorization and Presidential Permit Take notice that on December 8, 2017, Steel Reef Pipelines US LLC (Steel Reef), Suite 500, 407 8th Avenue SW, Calgary, Alberta, T2P 1E5 Canada, filed in the above referenced docket an application, pursuant to section 3 of the Natural Gas Act (NGA) and Subpart B of Section 153 of the Commission’s regulations, seeking authorization to site, construct, operate and maintain certain natural gas pipeline border crossing facilities to export natural gas from the United States to Canada (Border Crossing Facilities). The Border Crossing Facilities consist of a segment of 10.75-inch outside diameter pipe that extends from an interconnection with upstream gathering facilities for 250 feet to the International Boundary. The Border Crossing Facilities are a part of the proposed approximately 2.2-mile pipeline that further extends to an existing natural gas processing plant in Canada. Additionally, Steel Reef requests a Presidential Permit for the Border Crossing Facilities, all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing may be also viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call (202) 502–8222 or TTY, (202) 208–1659. Any questions regarding this application should be directed to Chris Anderson, Steel Reef Infrastructure Corp. Suite 500—407, 8th Avenue SW, Calgary, Alberta, T2P 1E5 Canada, or call (403) 263–8333 or email: chris.anderson@steelreef.ca. Pursuant to Section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record E:\FR\FM\27DEN1.SGM 27DEN1

Agencies

[Federal Register Volume 82, Number 247 (Wednesday, December 27, 2017)]
[Notices]
[Pages 61283-61284]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-27917]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2788-017]


Goodyear Lake Hydro, LLC; Notice Soliciting Scoping Comments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Subsequent Minor License.
    b. Project No.: 2788-017.
    c. Date filed: February 27, 2017.
    d. Applicant: Goodyear Lake Hydro, LLC (Goodyear Lake Hydro).
    e. Name of Project: Colliersville Hydroelectric Project.
    f. Location: On the North Branch of the Susquehanna River, in the 
Town of Milford, Otsego County, New York. The project does not occupy 
lands of the United States.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Kevin Webb, Hydro Licensing Manager; Enel 
Green Power North America, Inc., 100 Brickstone Square, Suite 300, 
Andover, MA 01810; (978) 935-6039; [email protected].
    i. FERC Contact: Emily Carter, (202) 502-6512 or 
[email protected].
    j. Deadline for filing scoping comments: 30 days from the issuance 
date of this notice.
    The Commission strongly encourages electronic filing. Please file 
scoping comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at

[[Page 61284]]

[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-2788-017.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application is not ready for environmental analysis at this 
time.
    l. Project Description.
    The existing Colliersville Hydroelectric Project consists of: (1) A 
dam that includes: A 200-foot-long, 35-foot-high, reinforced-concrete, 
Ambursen-type dam or spillway structure \1\ with a crest elevation of 
1,150.22 feet National Geodetic Vertical Datum of 1929 (NGVD 29); a 50-
foot-wide concrete headgate structure located on the west side of the 
river and adjacent to the spillway, forming the closure with the west 
bank; and an L-shaped, 66-foot-long, concrete wall with one side along 
the east side of the spillway and the other side parallel to the axis 
of the dam, extending approximately 6 to 8 feet above the crest of the 
dam; (2) a 364-acre reservoir (Goodyear Lake) with a gross storage 
capacity of 7,800 acre-feet at a normal pool elevation of 1,150.22 feet 
NGVD29; (3) a 550-foot-long reinforced concrete power canal, 
approximately 50 feet wide and 6 feet deep at the head gates, extending 
from a head gate structure adjacent to the dam (i.e., the intake) to 
the powerhouse; (4) a 103-foot-long by 33-foot-wide reinforced concrete 
powerhouse with trash racks with a clear spacing of 1.5 inches, and 
containing two turbines rated at 850 horsepower (HP) and 1,150 HP, and 
two generators having a rated capacity of 650 kilowatts (kW) and 850 
kW, respectively; (5) a 300-foot-long and approximately 50- to 60-foot-
wide tailrace; (6) three, approximately 80-foot-long, 4.16-kilovolt 
underground generator leads or transmission lines from the powerhouse 
to an adjacent substation owned by the New York State Electric and Gas 
Corporation; and (7) appurtenant facilities.
---------------------------------------------------------------------------

    \1\ A type of buttress dam of which the upstream part is a 
relatively thin flat slab usually made of reinforced concrete. A 
buttress dam consists of watertight parts supported at intervals on 
the downstream side by a series of buttresses.
---------------------------------------------------------------------------

    Goodyear Lake Hydro operates the project in a run-of-river mode. 
The project experiences substantial seasonal and annual variations in 
generation, and generates an annual average of 5,985 megawatt-hours. 
Goodyear Lake Hydro proposes to continue to operate the project in run-
of-river mode.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's web site at https://www.ferc.gov using the eLibrary link. 
Enter the docket number excluding the last three digits in the docket 
number field to address the document. For assistance, contact FERC 
Online Support. A copy is available for inspection and reproduction at 
the address in item h above.
    n. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    o. Scoping Process
    The Commission staff intends to prepare an Environmental Assessment 
(EA) for the Colliersville Hydroelectric Project in accordance with the 
National Environmental Policy Act. The EA will consider both site-
specific and cumulative environmental impacts and reasonable 
alternatives to the proposed action.
    Commission staff does not propose to conduct any on-site scoping 
meetings at this time. Instead, we are soliciting comments, 
recommendations, and information, on the Scoping Document 1 (SD1) 
issued December 20, 2017.
    Copies of SD1 outlining the subject areas to be addressed in the EA 
were distributed to the parties on the Commission's mailing list. 
Copies of SD1 may be viewed on the web at https://www.ferc.gov using the 
eLibrary link. Enter the docket number excluding the last three digits 
in the docket number field to access the document. For assistance, call 
1-866-208-3676 or for TTY, (202) 502-8659.

    Dated: December 20, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-27917 Filed 12-26-17; 8:45 am]
 BILLING CODE 6717-01-P