Goodyear Lake Hydro, LLC; Notice Soliciting Scoping Comments, 61283-61284 [2017-27917]
Download as PDF
Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Notices
SP Cactus Flats Wind
Energy, LLC.
Caoxian Taida New Energy Company Limited.
Altamuskin Windfarm
Limited.
Amplus Andhra Power
Private Limited.
EG17–157–000
FC17–6–000
FC17–7–000
FC17–8–000
Take notice that during the month of
November 2017, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a) (2017).
Dated: December 20, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary
[FR Doc. 2017–27910 Filed 12–26–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2788–017]
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Goodyear Lake Hydro, LLC; Notice
Soliciting Scoping Comments
[Docket No. NJ18–6–000]
Federal Energy Regulatory
Commission
City of Riverside, California; Notice of
Filing
[Docket No. NJ18–3–000]
Notice of Filing; City of Pasadena,
California
daltland on DSKBBV9HB2PROD with NOTICES
Dated: December 20, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
Take notice that on December 13,
2017, City of Pasadena, California
submitted its tariff filing: City of
Pasadena 2018 TRBAA Update to be
effective 1/1/2018.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for electronic
review in the Commission’s Public
21:43 Dec 26, 2017
Dated: December 20, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on January 8, 2018.
[FR Doc. 2017–27908 Filed 12–26–17; 8:45 am]
[FR Doc. 2017–27904 Filed 12–26–17; 8:45 am]
VerDate Sep<11>2014
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on January 3, 2018.
61283
Jkt 244001
Take notice that on December 18,
2017, City of Riverside, California
submitted its tariff filing: City of
Riverside 2018 TRBAA/ETC Update to
be effective 1/1/2018.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for electronic
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 2788–017.
c. Date filed: February 27, 2017.
d. Applicant: Goodyear Lake Hydro,
LLC (Goodyear Lake Hydro).
e. Name of Project: Colliersville
Hydroelectric Project.
f. Location: On the North Branch of
the Susquehanna River, in the Town of
Milford, Otsego County, New York. The
project does not occupy lands of the
United States.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Kevin
Webb, Hydro Licensing Manager; Enel
Green Power North America, Inc., 100
Brickstone Square, Suite 300, Andover,
MA 01810; (978) 935–6039;
kevin.webb@enel.com.
i. FERC Contact: Emily Carter, (202)
502–6512 or emily.carter@ferc.gov.
j. Deadline for filing scoping
comments: 30 days from the issuance
date of this notice.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
E:\FR\FM\27DEN1.SGM
27DEN1
daltland on DSKBBV9HB2PROD with NOTICES
61284
Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Notices
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2788–017.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application is not ready for
environmental analysis at this time.
l. Project Description.
The existing Colliersville
Hydroelectric Project consists of: (1) A
dam that includes: A 200-foot-long, 35foot-high, reinforced-concrete,
Ambursen-type dam or spillway
structure 1 with a crest elevation of
1,150.22 feet National Geodetic Vertical
Datum of 1929 (NGVD 29); a 50-footwide concrete headgate structure
located on the west side of the river and
adjacent to the spillway, forming the
closure with the west bank; and an
L-shaped, 66-foot-long, concrete wall
with one side along the east side of the
spillway and the other side parallel to
the axis of the dam, extending
approximately 6 to 8 feet above the crest
of the dam; (2) a 364-acre reservoir
(Goodyear Lake) with a gross storage
capacity of 7,800 acre-feet at a normal
pool elevation of 1,150.22 feet NGVD29;
(3) a 550-foot-long reinforced concrete
power canal, approximately 50 feet
wide and 6 feet deep at the head gates,
extending from a head gate structure
adjacent to the dam (i.e., the intake) to
the powerhouse; (4) a 103-foot-long by
33-foot-wide reinforced concrete
powerhouse with trash racks with a
clear spacing of 1.5 inches, and
containing two turbines rated at 850
horsepower (HP) and 1,150 HP, and two
generators having a rated capacity of
650 kilowatts (kW) and 850 kW,
respectively; (5) a 300-foot-long and
approximately 50- to 60-foot-wide
tailrace; (6) three, approximately 80foot-long, 4.16-kilovolt underground
generator leads or transmission lines
from the powerhouse to an adjacent
substation owned by the New York State
Electric and Gas Corporation; and (7)
appurtenant facilities.
Goodyear Lake Hydro operates the
project in a run-of-river mode. The
project experiences substantial seasonal
and annual variations in generation, and
generates an annual average of 5,985
megawatt-hours. Goodyear Lake Hydro
proposes to continue to operate the
project in run-of-river mode.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s web site at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to address the document.
For assistance, contact FERC Online
Support. A copy is available for
inspection and reproduction at the
address in item h above.
n. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Scoping Process
The Commission staff intends to
prepare an Environmental Assessment
(EA) for the Colliersville Hydroelectric
Project in accordance with the National
Environmental Policy Act. The EA will
consider both site-specific and
cumulative environmental impacts and
reasonable alternatives to the proposed
action.
Commission staff does not propose to
conduct any on-site scoping meetings at
this time. Instead, we are soliciting
comments, recommendations, and
information, on the Scoping Document
1 (SD1) issued December 20, 2017.
Copies of SD1 outlining the subject
areas to be addressed in the EA were
distributed to the parties on the
Commission’s mailing list. Copies of
SD1 may be viewed on the web at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, call 1–866–208–3676 or
for TTY, (202) 502–8659.
1 A type of buttress dam of which the upstream
part is a relatively thin flat slab usually made of
reinforced concrete. A buttress dam consists of
watertight parts supported at intervals on the
downstream side by a series of buttresses.
[FR Doc. 2017–27917 Filed 12–26–17; 8:45 am]
VerDate Sep<11>2014
21:43 Dec 26, 2017
Jkt 244001
Dated: December 20, 2017.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–24–000]
Steel Reef Pipelines US LLC; Notice of
Application for Section 3 Authorization
and Presidential Permit
Take notice that on December 8, 2017,
Steel Reef Pipelines US LLC (Steel
Reef), Suite 500, 407 8th Avenue SW,
Calgary, Alberta, T2P 1E5 Canada, filed
in the above referenced docket an
application, pursuant to section 3 of the
Natural Gas Act (NGA) and Subpart B of
Section 153 of the Commission’s
regulations, seeking authorization to
site, construct, operate and maintain
certain natural gas pipeline border
crossing facilities to export natural gas
from the United States to Canada
(Border Crossing Facilities). The Border
Crossing Facilities consist of a segment
of 10.75-inch outside diameter pipe that
extends from an interconnection with
upstream gathering facilities for 250 feet
to the International Boundary. The
Border Crossing Facilities are a part of
the proposed approximately 2.2-mile
pipeline that further extends to an
existing natural gas processing plant in
Canada. Additionally, Steel Reef
requests a Presidential Permit for the
Border Crossing Facilities, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. This filing may be
also viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call (202) 502–8222 or TTY,
(202) 208–1659.
Any questions regarding this
application should be directed to Chris
Anderson, Steel Reef Infrastructure
Corp. Suite 500—407, 8th Avenue SW,
Calgary, Alberta, T2P 1E5 Canada, or
call (403) 263–8333 or email:
chris.anderson@steelreef.ca.
Pursuant to Section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 82, Number 247 (Wednesday, December 27, 2017)]
[Notices]
[Pages 61283-61284]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-27917]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2788-017]
Goodyear Lake Hydro, LLC; Notice Soliciting Scoping Comments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 2788-017.
c. Date filed: February 27, 2017.
d. Applicant: Goodyear Lake Hydro, LLC (Goodyear Lake Hydro).
e. Name of Project: Colliersville Hydroelectric Project.
f. Location: On the North Branch of the Susquehanna River, in the
Town of Milford, Otsego County, New York. The project does not occupy
lands of the United States.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Kevin Webb, Hydro Licensing Manager; Enel
Green Power North America, Inc., 100 Brickstone Square, Suite 300,
Andover, MA 01810; (978) 935-6039; [email protected].
i. FERC Contact: Emily Carter, (202) 502-6512 or
[email protected].
j. Deadline for filing scoping comments: 30 days from the issuance
date of this notice.
The Commission strongly encourages electronic filing. Please file
scoping comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[[Page 61284]]
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-2788-017.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application is not ready for environmental analysis at this
time.
l. Project Description.
The existing Colliersville Hydroelectric Project consists of: (1) A
dam that includes: A 200-foot-long, 35-foot-high, reinforced-concrete,
Ambursen-type dam or spillway structure \1\ with a crest elevation of
1,150.22 feet National Geodetic Vertical Datum of 1929 (NGVD 29); a 50-
foot-wide concrete headgate structure located on the west side of the
river and adjacent to the spillway, forming the closure with the west
bank; and an L-shaped, 66-foot-long, concrete wall with one side along
the east side of the spillway and the other side parallel to the axis
of the dam, extending approximately 6 to 8 feet above the crest of the
dam; (2) a 364-acre reservoir (Goodyear Lake) with a gross storage
capacity of 7,800 acre-feet at a normal pool elevation of 1,150.22 feet
NGVD29; (3) a 550-foot-long reinforced concrete power canal,
approximately 50 feet wide and 6 feet deep at the head gates, extending
from a head gate structure adjacent to the dam (i.e., the intake) to
the powerhouse; (4) a 103-foot-long by 33-foot-wide reinforced concrete
powerhouse with trash racks with a clear spacing of 1.5 inches, and
containing two turbines rated at 850 horsepower (HP) and 1,150 HP, and
two generators having a rated capacity of 650 kilowatts (kW) and 850
kW, respectively; (5) a 300-foot-long and approximately 50- to 60-foot-
wide tailrace; (6) three, approximately 80-foot-long, 4.16-kilovolt
underground generator leads or transmission lines from the powerhouse
to an adjacent substation owned by the New York State Electric and Gas
Corporation; and (7) appurtenant facilities.
---------------------------------------------------------------------------
\1\ A type of buttress dam of which the upstream part is a
relatively thin flat slab usually made of reinforced concrete. A
buttress dam consists of watertight parts supported at intervals on
the downstream side by a series of buttresses.
---------------------------------------------------------------------------
Goodyear Lake Hydro operates the project in a run-of-river mode.
The project experiences substantial seasonal and annual variations in
generation, and generates an annual average of 5,985 megawatt-hours.
Goodyear Lake Hydro proposes to continue to operate the project in run-
of-river mode.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's web site at https://www.ferc.gov using the eLibrary link.
Enter the docket number excluding the last three digits in the docket
number field to address the document. For assistance, contact FERC
Online Support. A copy is available for inspection and reproduction at
the address in item h above.
n. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
o. Scoping Process
The Commission staff intends to prepare an Environmental Assessment
(EA) for the Colliersville Hydroelectric Project in accordance with the
National Environmental Policy Act. The EA will consider both site-
specific and cumulative environmental impacts and reasonable
alternatives to the proposed action.
Commission staff does not propose to conduct any on-site scoping
meetings at this time. Instead, we are soliciting comments,
recommendations, and information, on the Scoping Document 1 (SD1)
issued December 20, 2017.
Copies of SD1 outlining the subject areas to be addressed in the EA
were distributed to the parties on the Commission's mailing list.
Copies of SD1 may be viewed on the web at https://www.ferc.gov using the
eLibrary link. Enter the docket number excluding the last three digits
in the docket number field to access the document. For assistance, call
1-866-208-3676 or for TTY, (202) 502-8659.
Dated: December 20, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-27917 Filed 12-26-17; 8:45 am]
BILLING CODE 6717-01-P