PacifiCorp; Notice of Draft License Application (DLA) and Draft Preliminary Draft Environmental Assessment (PDEA) and Request for Preliminary Terms a nd Conditions, 61290-61291 [2017-27914]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
61290
Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Notices
Accession Number: 20171215–5245.
Comments Due: 5 p.m. ET 1/5/18.
Docket Numbers: ER10–3145–010;
ER10–3116–010; ER13–1544–007;
ER10–3120–010; ER11–2036–010;
ER16–930–004; ER10–3128–010; ER10–
1800–011; ER10–3136–010; ER11–2701–
012; ER10–1728–010; ER15–1582–009;
ER15–1579–008; ER15–1914–010;
ER16–1255–004; ER16–2201–003;
ER16–1955–004; ER17–1864–002;
ER17–1871–002; ER17–1909–002;
ER17–544–003; ER17–306–003; ER16–
1738–004; ER16–474–005; ER16–1901–
004; ER16–468–004; ER15–2679–006;
ER16–2578–004; ER16–2541–003;
ER15–2680–006; ER15–762–010; ER16–
2224–003; ER16–890–005; ER15–760–
009; ER16–1973–004; ER16–1956–004.
Applicants: AES Alamitos, LLC, AES
Energy Storage, LLC, AES ES Tait, LLC,
AES Huntington Beach, L.L.C., AES
Laurel Mountain, LLC, AES Ohio
Generation, LLC, AES Redondo Beach,
L.L.C., Indianapolis Power & Light
Company, Mountain View Power
Partners, LLC, Mountain View Power
Partners IV, LLC, The Dayton Power and
Light Company, 65HK 8me LLC, 67RK
8me LLC, 87RL 8me LLC, Antelope Big
Sky Ranch LLC, Antelope DSR 1, LLC,
Antelope DSR 2, LLC, Bayshore Solar A,
LLC, Bayshore Solar B, LLC, Bayshore
Solar C, LLC, Beacon Solar 1, LLC,
Beacon Solar 3, LLC, Beacon Solar 4,
LLC, Central Antelope Dry Ranch C
LLC, Elevation Solar C LLC, FTS Master
Tenant 1, LLC, Latigo Wind Park, LLC,
North Lancaster Ranch LLC, Pioneer
Wind Park I LLC, Sandstone Solar LLC,
Sierra Solar Greenworks LLC, Solverde
1, LLC, Summer Solar LLC, Western
Antelope Blue Sky Ranch A LLC,
Western Antelope Blue Sky Ranch B
LLC, Western Antelope Dry Ranch LLC.
Description: Triennial Market Power
Update of the AES MBR Affiliates for
the Central Region.
Filed Date: 12/18/17.
Accession Number: 20171218–5238.
Comments Due: 5 p.m. ET 2/16/18.
Docket Numbers: ER17–2536–001.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Amendment:
Answer to Port of Oakland IA
Deficiency to be effective 2/1/2018.
Filed Date: 12/18/17.
Accession Number: 20171218–5206.
Comments Due: 5 p.m. ET 1/8/18.
Docket Numbers: ER18–215–001.
Applicants: Interstate Power and
Light Company.
Description: Tariff Amendment:
Amendment to Proposed IPL Wholesale
Formula Rate Changes to be effective 1/
1/2018.
Filed Date: 12/18/17.
VerDate Sep<11>2014
22:18 Dec 26, 2017
Jkt 244001
Accession Number: 20171218–5225.
Comments Due: 5 p.m. ET 1/8/18.
Docket Numbers: ER18–216–001.
Applicants: Wisconsin Power and
Light Company.
Description: Tariff Amendment:
Amendment to Proposed WPL
Wholesale Formula Rate Changes to be
effective 1/1/2018.
Filed Date: 12/18/17.
Accession Number: 20171218–5224.
Comments Due: 5 p.m. ET 1/8/18.
Docket Numbers: ER18–469–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2017–12–18 Filing of PSP Agreement
with Placer County Water Agency to be
effective 1/1/2018.
Filed Date: 12/18/17.
Accession Number: 20171218–5184.
Comments Due: 5 p.m. ET 1/8/18.
Docket Numbers: ER18–470–000.
Applicants: UGI Utilities Inc., PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing: UGI
submits Interconnection and Operating
Agreement, Service Agreement No. 1460
to be effective 12/13/2017.
Filed Date: 12/18/17.
Accession Number: 20171218–5194.
Comments Due: 5 p.m. ET 1/8/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 19, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–27834 Filed 12–26–17; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1744–039]
PacifiCorp; Notice of Draft License
Application (DLA) and Draft
Preliminary Draft Environmental
Assessment (PDEA) and Request for
Preliminary Terms and Conditions
Take notice that the following Draft
License Application (DLA) and draft
Preliminary Draft Environmental
Assessment (PDEA) have been filed
with the Commission and are available
for public inspection.
a. Type of Application: Major
Constructed Project.
b. Project No.: 1744–039.
c. Date Filed: December 15, 2017.
d. Applicant: PacifiCorp.
e. Name of Project: Weber
Hydroelectric Project.
f. Location: On the Weber River, in
Weber, Davis, and Morgan Counties,
Utah. The project occupies 14.94 acres
of United States lands administered by
the U.S. Forest Service.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Eve Davies,
PacifiCorp—Renewable Resources, 1407
West North Temple, Suite 210, Salt Lake
City, UT 84116; (801) 220–2245; email
eve.davies@pacificorp.com.
i. FERC Contact: Evan Williams at
(202) 502–8462; or email at
evan.williams@ferc.gov.
j. Status of Project: With this notice
the Commission is soliciting (1)
preliminary terms, conditions, and
recommendations on the draft PDEA,
and (2) comments on the DLA.
k. Deadline for filing: 90 days from the
issuance of this notice.
All comments on the draft PDEA and
DLA should be sent to the addresses
noted above in Item (h), and filed with
FERC.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
E:\FR\FM\27DEN1.SGM
27DEN1
Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Notices
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–1744–039.
All comments must bear the heading
Preliminary Comments, Preliminary
Recommendations, Preliminary Terms
and Conditions, or Preliminary
Prescriptions.
l. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
PacifiCorp has mailed a copy of the
Preliminary DEA and Draft License
Application to interested entities and
parties. Copies of these documents are
available for review at PacifiCorp Hydro
Resources, 1407 W. North Temple, Suite
210, Salt Lake City, UT 84116.
m. With this notice, we are initiating
consultation with the UTAH STATE
HISTORIC PRESERVATION OFFICER
(SHPO), as required by section 106,
National Historic Preservation Act, and
the regulations of the Advisory Council
on Historic Preservation, 36 CFR 800.4.
Dated: December 20, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–27914 Filed 12–26–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–23–000]
daltland on DSKBBV9HB2PROD with NOTICES
Notice of Application; Algonquin Gas
Transmission, LLC
Take notice that on December 6, 2017,
Algonquin Gas Transmission, LLC
(Algonquin), having its principal place
of business at 5400 Westheimer Court,
Houston, Texas 77056–5310 filed in the
above referenced docket an application
pursuant to section 7(b) of the Natural
Gas Act (NGA), and Part 157 of the
Commission’s regulations requesting
authorization to abandon two
reciprocating compressor units and
related appurtenances located in
Providence County, Rhode Island
VerDate Sep<11>2014
21:43 Dec 26, 2017
Jkt 244001
referred to as Burrillville Compressor
Station Project (Project), all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. Specifically,
Algonquin is requesting approval to
abandon in place compressor unit Nos.
1 and 2, and to remove related
appurtenances, at its Burrillville
Compressor Station. Algonquin states
that the Project will allow Algonquin to
eliminate the need for future operating
and maintenance expenditures on
facilities that are outdated and not
needed to satisfy its current firm service
obligations. The filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website web at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Lisa A.
Connolly, Director, Rates & Certificates,
P.O. Box 1642, Houston, Texas 77251–
1642, or telephone (713) 627–4102, or
fax (713) 627–5947 or by emailing
lisa.connolly@enbridge.com.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
61291
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street NE, Washington, DC
20426.
Comment Date: January 10, 2018
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 82, Number 247 (Wednesday, December 27, 2017)]
[Notices]
[Pages 61290-61291]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-27914]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1744-039]
PacifiCorp; Notice of Draft License Application (DLA) and Draft
Preliminary Draft Environmental Assessment (PDEA) and Request for
Preliminary Terms and Conditions
Take notice that the following Draft License Application (DLA) and
draft Preliminary Draft Environmental Assessment (PDEA) have been filed
with the Commission and are available for public inspection.
a. Type of Application: Major Constructed Project.
b. Project No.: 1744-039.
c. Date Filed: December 15, 2017.
d. Applicant: PacifiCorp.
e. Name of Project: Weber Hydroelectric Project.
f. Location: On the Weber River, in Weber, Davis, and Morgan
Counties, Utah. The project occupies 14.94 acres of United States lands
administered by the U.S. Forest Service.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Eve Davies, PacifiCorp--Renewable Resources,
1407 West North Temple, Suite 210, Salt Lake City, UT 84116; (801) 220-
2245; email [email protected].
i. FERC Contact: Evan Williams at (202) 502-8462; or email at
[email protected].
j. Status of Project: With this notice the Commission is soliciting
(1) preliminary terms, conditions, and recommendations on the draft
PDEA, and (2) comments on the DLA.
k. Deadline for filing: 90 days from the issuance of this notice.
All comments on the draft PDEA and DLA should be sent to the
addresses noted above in Item (h), and filed with FERC.
The Commission strongly encourages electronic filing. Please file
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to
6,000 characters, without prior registration, using the eComment system
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888
[[Page 61291]]
First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-1744-039.
All comments must bear the heading Preliminary Comments,
Preliminary Recommendations, Preliminary Terms and Conditions, or
Preliminary Prescriptions.
l. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the eLibrary link.
Enter the docket number excluding the last three digits in the docket
number field to access the document. For assistance, contact FERC
Online Support.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
PacifiCorp has mailed a copy of the Preliminary DEA and Draft
License Application to interested entities and parties. Copies of these
documents are available for review at PacifiCorp Hydro Resources, 1407
W. North Temple, Suite 210, Salt Lake City, UT 84116.
m. With this notice, we are initiating consultation with the UTAH
STATE HISTORIC PRESERVATION OFFICER (SHPO), as required by section 106,
National Historic Preservation Act, and the regulations of the Advisory
Council on Historic Preservation, 36 CFR 800.4.
Dated: December 20, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-27914 Filed 12-26-17; 8:45 am]