PacifiCorp; Notice of Draft License Application (DLA) and Draft Preliminary Draft Environmental Assessment (PDEA) and Request for Preliminary Terms a nd Conditions, 61290-61291 [2017-27914]

Download as PDF daltland on DSKBBV9HB2PROD with NOTICES 61290 Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Notices Accession Number: 20171215–5245. Comments Due: 5 p.m. ET 1/5/18. Docket Numbers: ER10–3145–010; ER10–3116–010; ER13–1544–007; ER10–3120–010; ER11–2036–010; ER16–930–004; ER10–3128–010; ER10– 1800–011; ER10–3136–010; ER11–2701– 012; ER10–1728–010; ER15–1582–009; ER15–1579–008; ER15–1914–010; ER16–1255–004; ER16–2201–003; ER16–1955–004; ER17–1864–002; ER17–1871–002; ER17–1909–002; ER17–544–003; ER17–306–003; ER16– 1738–004; ER16–474–005; ER16–1901– 004; ER16–468–004; ER15–2679–006; ER16–2578–004; ER16–2541–003; ER15–2680–006; ER15–762–010; ER16– 2224–003; ER16–890–005; ER15–760– 009; ER16–1973–004; ER16–1956–004. Applicants: AES Alamitos, LLC, AES Energy Storage, LLC, AES ES Tait, LLC, AES Huntington Beach, L.L.C., AES Laurel Mountain, LLC, AES Ohio Generation, LLC, AES Redondo Beach, L.L.C., Indianapolis Power & Light Company, Mountain View Power Partners, LLC, Mountain View Power Partners IV, LLC, The Dayton Power and Light Company, 65HK 8me LLC, 67RK 8me LLC, 87RL 8me LLC, Antelope Big Sky Ranch LLC, Antelope DSR 1, LLC, Antelope DSR 2, LLC, Bayshore Solar A, LLC, Bayshore Solar B, LLC, Bayshore Solar C, LLC, Beacon Solar 1, LLC, Beacon Solar 3, LLC, Beacon Solar 4, LLC, Central Antelope Dry Ranch C LLC, Elevation Solar C LLC, FTS Master Tenant 1, LLC, Latigo Wind Park, LLC, North Lancaster Ranch LLC, Pioneer Wind Park I LLC, Sandstone Solar LLC, Sierra Solar Greenworks LLC, Solverde 1, LLC, Summer Solar LLC, Western Antelope Blue Sky Ranch A LLC, Western Antelope Blue Sky Ranch B LLC, Western Antelope Dry Ranch LLC. Description: Triennial Market Power Update of the AES MBR Affiliates for the Central Region. Filed Date: 12/18/17. Accession Number: 20171218–5238. Comments Due: 5 p.m. ET 2/16/18. Docket Numbers: ER17–2536–001. Applicants: Pacific Gas and Electric Company. Description: Tariff Amendment: Answer to Port of Oakland IA Deficiency to be effective 2/1/2018. Filed Date: 12/18/17. Accession Number: 20171218–5206. Comments Due: 5 p.m. ET 1/8/18. Docket Numbers: ER18–215–001. Applicants: Interstate Power and Light Company. Description: Tariff Amendment: Amendment to Proposed IPL Wholesale Formula Rate Changes to be effective 1/ 1/2018. Filed Date: 12/18/17. VerDate Sep<11>2014 22:18 Dec 26, 2017 Jkt 244001 Accession Number: 20171218–5225. Comments Due: 5 p.m. ET 1/8/18. Docket Numbers: ER18–216–001. Applicants: Wisconsin Power and Light Company. Description: Tariff Amendment: Amendment to Proposed WPL Wholesale Formula Rate Changes to be effective 1/1/2018. Filed Date: 12/18/17. Accession Number: 20171218–5224. Comments Due: 5 p.m. ET 1/8/18. Docket Numbers: ER18–469–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2017–12–18 Filing of PSP Agreement with Placer County Water Agency to be effective 1/1/2018. Filed Date: 12/18/17. Accession Number: 20171218–5184. Comments Due: 5 p.m. ET 1/8/18. Docket Numbers: ER18–470–000. Applicants: UGI Utilities Inc., PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: UGI submits Interconnection and Operating Agreement, Service Agreement No. 1460 to be effective 12/13/2017. Filed Date: 12/18/17. Accession Number: 20171218–5194. Comments Due: 5 p.m. ET 1/8/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 19, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–27834 Filed 12–26–17; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1744–039] PacifiCorp; Notice of Draft License Application (DLA) and Draft Preliminary Draft Environmental Assessment (PDEA) and Request for Preliminary Terms and Conditions Take notice that the following Draft License Application (DLA) and draft Preliminary Draft Environmental Assessment (PDEA) have been filed with the Commission and are available for public inspection. a. Type of Application: Major Constructed Project. b. Project No.: 1744–039. c. Date Filed: December 15, 2017. d. Applicant: PacifiCorp. e. Name of Project: Weber Hydroelectric Project. f. Location: On the Weber River, in Weber, Davis, and Morgan Counties, Utah. The project occupies 14.94 acres of United States lands administered by the U.S. Forest Service. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Eve Davies, PacifiCorp—Renewable Resources, 1407 West North Temple, Suite 210, Salt Lake City, UT 84116; (801) 220–2245; email eve.davies@pacificorp.com. i. FERC Contact: Evan Williams at (202) 502–8462; or email at evan.williams@ferc.gov. j. Status of Project: With this notice the Commission is soliciting (1) preliminary terms, conditions, and recommendations on the draft PDEA, and (2) comments on the DLA. k. Deadline for filing: 90 days from the issuance of this notice. All comments on the draft PDEA and DLA should be sent to the addresses noted above in Item (h), and filed with FERC. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 E:\FR\FM\27DEN1.SGM 27DEN1 Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Notices First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–1744–039. All comments must bear the heading Preliminary Comments, Preliminary Recommendations, Preliminary Terms and Conditions, or Preliminary Prescriptions. l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. PacifiCorp has mailed a copy of the Preliminary DEA and Draft License Application to interested entities and parties. Copies of these documents are available for review at PacifiCorp Hydro Resources, 1407 W. North Temple, Suite 210, Salt Lake City, UT 84116. m. With this notice, we are initiating consultation with the UTAH STATE HISTORIC PRESERVATION OFFICER (SHPO), as required by section 106, National Historic Preservation Act, and the regulations of the Advisory Council on Historic Preservation, 36 CFR 800.4. Dated: December 20, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–27914 Filed 12–26–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–23–000] daltland on DSKBBV9HB2PROD with NOTICES Notice of Application; Algonquin Gas Transmission, LLC Take notice that on December 6, 2017, Algonquin Gas Transmission, LLC (Algonquin), having its principal place of business at 5400 Westheimer Court, Houston, Texas 77056–5310 filed in the above referenced docket an application pursuant to section 7(b) of the Natural Gas Act (NGA), and Part 157 of the Commission’s regulations requesting authorization to abandon two reciprocating compressor units and related appurtenances located in Providence County, Rhode Island VerDate Sep<11>2014 21:43 Dec 26, 2017 Jkt 244001 referred to as Burrillville Compressor Station Project (Project), all as more fully set forth in the application which is on file with the Commission and open to public inspection. Specifically, Algonquin is requesting approval to abandon in place compressor unit Nos. 1 and 2, and to remove related appurtenances, at its Burrillville Compressor Station. Algonquin states that the Project will allow Algonquin to eliminate the need for future operating and maintenance expenditures on facilities that are outdated and not needed to satisfy its current firm service obligations. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website web at https:// www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application may be directed to Lisa A. Connolly, Director, Rates & Certificates, P.O. Box 1642, Houston, Texas 77251– 1642, or telephone (713) 627–4102, or fax (713) 627–5947 or by emailing lisa.connolly@enbridge.com. Pursuant to section 157.9 of the Commission’s rules (18 CFR 157.9), within 90 days of this Notice, the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 61291 with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit seven copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: January 10, 2018 E:\FR\FM\27DEN1.SGM 27DEN1

Agencies

[Federal Register Volume 82, Number 247 (Wednesday, December 27, 2017)]
[Notices]
[Pages 61290-61291]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-27914]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1744-039]


PacifiCorp; Notice of Draft License Application (DLA) and Draft 
Preliminary Draft Environmental Assessment (PDEA) and Request for 
Preliminary Terms and Conditions

    Take notice that the following Draft License Application (DLA) and 
draft Preliminary Draft Environmental Assessment (PDEA) have been filed 
with the Commission and are available for public inspection.
    a. Type of Application: Major Constructed Project.
    b. Project No.: 1744-039.
    c. Date Filed: December 15, 2017.
    d. Applicant: PacifiCorp.
    e. Name of Project: Weber Hydroelectric Project.
    f. Location: On the Weber River, in Weber, Davis, and Morgan 
Counties, Utah. The project occupies 14.94 acres of United States lands 
administered by the U.S. Forest Service.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Eve Davies, PacifiCorp--Renewable Resources, 
1407 West North Temple, Suite 210, Salt Lake City, UT 84116; (801) 220-
2245; email [email protected].
    i. FERC Contact: Evan Williams at (202) 502-8462; or email at 
[email protected].
    j. Status of Project: With this notice the Commission is soliciting 
(1) preliminary terms, conditions, and recommendations on the draft 
PDEA, and (2) comments on the DLA.
    k. Deadline for filing: 90 days from the issuance of this notice.
    All comments on the draft PDEA and DLA should be sent to the 
addresses noted above in Item (h), and filed with FERC.
    The Commission strongly encourages electronic filing. Please file 
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 
6,000 characters, without prior registration, using the eComment system 
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888

[[Page 61291]]

First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-1744-039.
    All comments must bear the heading Preliminary Comments, 
Preliminary Recommendations, Preliminary Terms and Conditions, or 
Preliminary Prescriptions.
    l. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at https://www.ferc.gov using the eLibrary link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, contact FERC 
Online Support.
    Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    PacifiCorp has mailed a copy of the Preliminary DEA and Draft 
License Application to interested entities and parties. Copies of these 
documents are available for review at PacifiCorp Hydro Resources, 1407 
W. North Temple, Suite 210, Salt Lake City, UT 84116.
    m. With this notice, we are initiating consultation with the UTAH 
STATE HISTORIC PRESERVATION OFFICER (SHPO), as required by section 106, 
National Historic Preservation Act, and the regulations of the Advisory 
Council on Historic Preservation, 36 CFR 800.4.

    Dated: December 20, 2017.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-27914 Filed 12-26-17; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.