Combined Notice of Filings #2, 61287-61288 [2017-27835]
Download as PDF
61287
daltland on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Notices
The first page of any filing should
include docket number P–13318–003.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is ready for environmental analysis.
l. The proposed project would consist
of the following new facilities: (1) A
7,972–foot-long, 58-foot-high earthen
embankment forming an asphalt
concrete and geomembrane-lined upper
reservoir, with a surface area of 64.21
acres and a storage capacity of 2,568
acre-feet at a maximum surface
elevation of 6,128 feet above mean sea
level (msl); (2) a 8,003-foot-long, 65foot-high earthen embankment forming
a geomembrane-lined lower reservoir,
with a surface area of 60.14 acres and
a storage capacity of 2,581 acre-feet at a
maximum surface elevation of 4,457 feet
msl; (3) a 500-foot-long, rip-rap lined
trapezoidal spillway built into the crest
of each embankment at an elevation of
approximately 6,135 feet msl and 4,464
feet msl for the upper and lower
reservoirs, respectively; (4) a 0.5percent-slope perforated polyvinyl
chloride tube of varying diameter and
accompanying optical fiber drainage
system designed to detect, collect, and
monitor water leakage from the
reservoirs; (5) a 25-inch-diameter
bottom outlet with manual valve for
gravitational dewatering of the lower
reservoir; (6) an upper intake consisting
of a bell mouth, 38.6-foot-wide by 29.8foot-long inclined screen, head gate, and
13.8-foot-diameter foundational steel
pipe; (7) a 13.8-foot-diameter, 9,655foot-long steel high-pressure penstock
from the upper reservoir to the
powerhouse that would be
predominantly aboveground with a 14foot-long buried segment; (8) three 9.8foot-diameter, 1,430-foot-long steel lowpressure penstocks from the lower
reservoir to the powerhouse that would
be predominantly aboveground with a
78-foot-long buried segment; (9) a
partially buried powerhouse with three
131.1–MW reversible pump-turbine
units for a total installed capacity of
393.3 MW; (10) a fenced substation next
to the powerhouse; (11) a 32.8-milelong, 230-kilovolt (kV) aboveground
transmission line interconnecting to an
existing non-project substation; (12)
approximately 10.7 miles of improved
VerDate Sep<11>2014
21:43 Dec 26, 2017
Jkt 244001
project access road; (13) approximately
3.4 miles of new permanent project
access road; (14) approximately 8.3
miles of temporary project access road;
and (15) appurtenant facilities. The
project would be a closed-loop system
using groundwater for initial fill, and
would not use any existing surface body
of water. Initial fill water and long-term
refill due to evaporative losses would be
supplied by the local groundwater
agricultural pumping system and
delivered to the lower reservoir via an
existing underground agricultural
irrigation network. The average annual
generation is expected to be 1,187
gigawatt-hours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov. using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title COMMENTS, REPLY
COMMENTS, RECOMMENDATIONS,
TERMS AND CONDITIONS, or
PRESCRIPTIONS; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Public notice of the filing of the
initial development application, which
has already been given, established the
due date for filing competing
applications or notices of intent. Under
the Commission’s regulations, any
competing development application
must be filed in response to and in
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
compliance with public notice of the
initial development application. No
competing applications or notices of
intent may be filed in response to this
notice.
o. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
p. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Milestone
Deadline for Filing Comments, Recommendations, and Agency Terms
and Conditions/Prescriptions.
Draft Environmental Impact
Statement (EIS) Issued.
Comments on Draft EIS
Due.
Final EIS Issued ..................
Target date
December
2018.
August 2018.
October 2018.
December
2018.
Dated: December 20, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–27916 Filed 12–26–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–36–000.
Applicants: MDU Resources Group,
Inc.
Description: Application of MDU
Resources Group, Inc. for Authorization
under FPA Section 203 and Request for
Confidential Treatment.
Filed Date: 12/19/17.
Accession Number: 20171219–5151.
Comments Due: 5 p.m. ET 1/9/18.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–20–000.
Applicants: States Edge Wind I LLC.
Description: Notice of SelfCertification of Exempt Wholesale
E:\FR\FM\27DEN1.SGM
27DEN1
daltland on DSKBBV9HB2PROD with NOTICES
61288
Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Notices
Generator Status of States Edge Wind I
LLC.
Filed Date: 12/19/17.
Accession Number: 20171219–5126.
Comments Due: 5 p.m. ET 1/9/18.
Docket Numbers: EG18–21–000.
Applicants: States Edge Wind I
Holdings LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of States Edge Wind I
Holdings LLC.
Filed Date: 12/19/17.
Accession Number: 20171219–5149.
Comments Due: 5 p.m. ET 1/9/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–471–000.
Applicants: States Edge Wind I LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization to be effective 2/18/2018.
Filed Date: 12/19/17.
Accession Number: 20171219–5116.
Comments Due: 5 p.m. ET 1/9/18.
Docket Numbers: ER18–471–001.
Applicants: States Edge Wind I LLC.
Description: Tariff Amendment:
Supplement to Application for MarketBased Rate Authorization to be effective
2/18/2018.
Filed Date: 12/19/17.
Accession Number: 20171219–5150.
Comments Due: 5 p.m. ET 1/9/18.
Docket Numbers: ER18–472–000.
Applicants: States Edge Wind I
Holding LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization to be effective 2/18/2018.
Filed Date: 12/19/17.
Accession Number: 20171219–5117.
Comments Due: 5 p.m. ET 1/9/18.
Docket Numbers: ER18–472–001.
Applicants: States Edge Wind I
Holding LLC.
Description: Tariff Amendment:
Supplement to Application for MarketBased Rate Authorization to be effective
2/18/2018.
Filed Date: 12/19/17.
Accession Number: 20171219–5154.
Comments Due: 5 p.m. ET 1/9/18.
Docket Numbers: ER18–473–000.
Applicants: Union Electric Company.
Description: § 205(d) Rate Filing:
Revised Rate Schedule 22 Reactive to be
effective 1/1/2018.
Filed Date: 12/19/17.
Accession Number: 20171219–5121.
Comments Due: 5 p.m. ET 1/9/18.
Docket Numbers: ER18–474–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2017–12–19 Informational Update to
VerDate Sep<11>2014
21:43 Dec 26, 2017
Jkt 244001
Technical Information—CCFC Sutter
Pseudo PGA to be effective 2/22/2018.
Filed Date: 12/19/17.
Accession Number: 20171219–5161.
Comments Due: 5 p.m. ET 1/9/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 19, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on January 2, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–27903 Filed 12–26–17; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2017–27835 Filed 12–26–17; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. ER18–471–000]
Federal Energy Regulatory
Commission
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization; States Edge Wind I LLC
[Docket No. EF18–3–000]
Notice of Filing; Western Area Power
Administration
Take notice that on December 1, 2017,
Western Area Power Administration
submitted tariff filing per: Formula
Rates for the Loveland Area Projects—
Rate Order No. WAPA–179 to be
effective 1/1/2018.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
This is a supplemental notice in the
above-referenced proceeding of States
Edge Wind I LLC‘s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is January 9,
2018.
The Commission encourages
electronic submission of protests and
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 82, Number 247 (Wednesday, December 27, 2017)]
[Notices]
[Pages 61287-61288]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-27835]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-36-000.
Applicants: MDU Resources Group, Inc.
Description: Application of MDU Resources Group, Inc. for
Authorization under FPA Section 203 and Request for Confidential
Treatment.
Filed Date: 12/19/17.
Accession Number: 20171219-5151.
Comments Due: 5 p.m. ET 1/9/18.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG18-20-000.
Applicants: States Edge Wind I LLC.
Description: Notice of Self-Certification of Exempt Wholesale
[[Page 61288]]
Generator Status of States Edge Wind I LLC.
Filed Date: 12/19/17.
Accession Number: 20171219-5126.
Comments Due: 5 p.m. ET 1/9/18.
Docket Numbers: EG18-21-000.
Applicants: States Edge Wind I Holdings LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of States Edge Wind I Holdings LLC.
Filed Date: 12/19/17.
Accession Number: 20171219-5149.
Comments Due: 5 p.m. ET 1/9/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-471-000.
Applicants: States Edge Wind I LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization to be effective 2/18/2018.
Filed Date: 12/19/17.
Accession Number: 20171219-5116.
Comments Due: 5 p.m. ET 1/9/18.
Docket Numbers: ER18-471-001.
Applicants: States Edge Wind I LLC.
Description: Tariff Amendment: Supplement to Application for
Market-Based Rate Authorization to be effective 2/18/2018.
Filed Date: 12/19/17.
Accession Number: 20171219-5150.
Comments Due: 5 p.m. ET 1/9/18.
Docket Numbers: ER18-472-000.
Applicants: States Edge Wind I Holding LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization to be effective 2/18/2018.
Filed Date: 12/19/17.
Accession Number: 20171219-5117.
Comments Due: 5 p.m. ET 1/9/18.
Docket Numbers: ER18-472-001.
Applicants: States Edge Wind I Holding LLC.
Description: Tariff Amendment: Supplement to Application for
Market-Based Rate Authorization to be effective 2/18/2018.
Filed Date: 12/19/17.
Accession Number: 20171219-5154.
Comments Due: 5 p.m. ET 1/9/18.
Docket Numbers: ER18-473-000.
Applicants: Union Electric Company.
Description: Sec. 205(d) Rate Filing: Revised Rate Schedule 22
Reactive to be effective 1/1/2018.
Filed Date: 12/19/17.
Accession Number: 20171219-5121.
Comments Due: 5 p.m. ET 1/9/18.
Docket Numbers: ER18-474-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2017-12-19 Informational
Update to Technical Information--CCFC Sutter Pseudo PGA to be effective
2/22/2018.
Filed Date: 12/19/17.
Accession Number: 20171219-5161.
Comments Due: 5 p.m. ET 1/9/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 19, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-27835 Filed 12-26-17; 8:45 am]
BILLING CODE 6717-01-P