Wallowa Resources Community Solutions Inc.; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 60977-60978 [2017-27728]
Download as PDF
Federal Register / Vol. 82, No. 246 / Tuesday, December 26, 2017 / Notices
forth in the application which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Robert D.
Jackson, Manager, Certificates &
Regulatory Administration, Columbia
Gas Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas
77002–2700, by telephone at (832) 320–
5487, by fax at (832) 320–6487, or by
email at robert_jackson@
transcanada.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: December 18, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–27734 Filed 12–22–17; 8:45 am]
BILLING CODE 6717–01–P
60977
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD18–4–000]
Wallowa Resources Community
Solutions Inc.; Notice of Preliminary
Determination of a Qualifying Conduit
Hydropower Facility and Soliciting
Comments and Motions To Intervene
On December 11, 2017, Wallowa
Resources Community Solutions Inc.
filed a notice of intent to construct a
qualifying conduit hydropower facility,
pursuant to section 30 of the Federal
Power Act (FPA), as amended by section
4 of the Hydropower Regulatory
Efficiency Act of 2013 (HREA). The
proposed Triple Creek Ranch Hydro
Station Project would have an installed
capacity of 85 kilowatts (kW), and
would be located along the 18-inchdiameter Triple Creek Ranch irrigation
pipeline. The project would be located
near the Town of Joseph in Wallowa
County, Oregon.
Applicant Contact: Kyle Petrocine,
Wallowa Resources Community
Solutions Inc., 401 NE First Street,
Enterprise, OR 97828; Phone No. (541)
426–8053.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062; Email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A new
generating unit, having a generating
capacity of 85 kW, housed in a new 13foot by 17-foot powerhouse, connected
to the existing 18-inch-diameter Triple
Creek Ranch irrigation pipeline, and (2)
appurtenant facilities. The proposed
project would have an estimated annual
generation of 153 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
ethrower on DSK3G9T082PROD with NOTICES
Statutory provision
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
FPA 30(a)(3)(C)(i), as amended by HREA
FPA 30(a)(3)(C)(ii),
HREA.
VerDate Sep<11>2014
as
amended
20:21 Dec 22, 2017
by
Jkt 244001
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
E:\FR\FM\26DEN1.SGM
26DEN1
Y
Y
60978
Federal Register / Vol. 82, No. 246 / Tuesday, December 26, 2017 / Notices
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY—Continued
Description
Satisfies
(Y/N)
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
Statutory provision
ethrower on DSK3G9T082PROD with NOTICES
FPA 30(a)(3)(C)(iii),
HREA.
as
amended
by
Preliminary Determination: The
proposed hydroelectric project will
utilize an existing irrigation pipeline,
the primary purpose of which is to
irrigate Triple Creek Ranch’s farm. The
addition of the Triple Creek Ranch
Hydro Station Project will not alter the
conduit’s primary purpose. Therefore,
based upon the above criteria,
Commission staff preliminarily
determines that the proposal satisfies
the requirements for a qualifying
conduit hydropower facility, which is
not required to be licensed or exempted
from licensing.
Comments and Motions To Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY or
MOTION TO INTERVENE, as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
1 18
CFR 385.2001–2005 (2017).
VerDate Sep<11>2014
20:21 Dec 22, 2017
Jkt 244001
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD18–4) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: December 19, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–27728 Filed 12–22–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC17–15–000]
Commission Information Collection
Activities (FERC–505 and FERC–512);
Consolidated Comment Request;
Extension
Federal Energy Regulatory
Commission.
ACTION: Comment request.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
SUMMARY:
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
(Commission or FERC) is soliciting
public comment on the requirements
and burden of information collections,
FERC–505 (Small Hydropower Projects
and Conduit Facilities including
License/Relicense, Exemption and
Qualifying Conduit Facility
Determination) and FERC–512
(Preliminary Permit) which will be
submitted to the Office of Management
and Budget (OMB) for a review of the
information collection requirements.
Any interested person may file
comments directly with OMB and
should address a copy of those
comments to the Commission as
explained below. The Commission
published a 60-day Notice in the
Federal Register in Docket No. IC17–
15–000, (82 FR 46231, 10/04/2017)
requesting public comments. FERC
received no comments in response to
the Notice and is indicating that in its
submittals to the OMB.
DATES: Comments on the collections of
information are due January 25, 2018.
ADDRESSES: Comments filed with OMB,
identified by OMB Control Nos. 1902–
0115 and 1902–0073, should be sent via
email to the Office of Information and
Regulatory Affairs: oira_submission@
omb.gov. Attention: Federal Energy
Regulatory Commission Desk Officer.
The Desk Officer may also be reached
via telephone at 202–395–0710. A copy
of the comments should also be sent to
the Commission, in Docket No. IC17–
15–000 by either of the following
methods:
• eFiling at Commission’s website:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
E:\FR\FM\26DEN1.SGM
26DEN1
Agencies
[Federal Register Volume 82, Number 246 (Tuesday, December 26, 2017)]
[Notices]
[Pages 60977-60978]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-27728]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD18-4-000]
Wallowa Resources Community Solutions Inc.; Notice of Preliminary
Determination of a Qualifying Conduit Hydropower Facility and
Soliciting Comments and Motions To Intervene
On December 11, 2017, Wallowa Resources Community Solutions Inc.
filed a notice of intent to construct a qualifying conduit hydropower
facility, pursuant to section 30 of the Federal Power Act (FPA), as
amended by section 4 of the Hydropower Regulatory Efficiency Act of
2013 (HREA). The proposed Triple Creek Ranch Hydro Station Project
would have an installed capacity of 85 kilowatts (kW), and would be
located along the 18-inch-diameter Triple Creek Ranch irrigation
pipeline. The project would be located near the Town of Joseph in
Wallowa County, Oregon.
Applicant Contact: Kyle Petrocine, Wallowa Resources Community
Solutions Inc., 401 NE First Street, Enterprise, OR 97828; Phone No.
(541) 426-8053.
FERC Contact: Robert Bell, Phone No. (202) 502-6062; Email:
[email protected].
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A new generating unit, having a
generating capacity of 85 kW, housed in a new 13-foot by 17-foot
powerhouse, connected to the existing 18-inch-diameter Triple Creek
Ranch irrigation pipeline, and (2) appurtenant facilities. The proposed
project would have an estimated annual generation of 153 megawatt-
hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Statutory provision Description Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by The conduit the Y
HREA. facility uses is a
tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial
consumption and not
primarily for the
generation of
electricity.
FPA 30(a)(3)(C)(i), as amended The facility is Y
by HREA. constructed,
operated, or
maintained for the
generation of
electric power and
uses for such
generation only the
hydroelectric
potential of a non-
federally owned
conduit.
FPA 30(a)(3)(C)(ii), as amended The facility has an Y
by HREA. installed capacity
that does not exceed
5 megawatts.
[[Page 60978]]
FPA 30(a)(3)(C)(iii), as On or before August 9, Y
amended by HREA. 2013, the facility is
not licensed, or
exempted from the
licensing
requirements of Part
I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: The proposed hydroelectric project will
utilize an existing irrigation pipeline, the primary purpose of which
is to irrigate Triple Creek Ranch's farm. The addition of the Triple
Creek Ranch Hydro Station Project will not alter the conduit's primary
purpose. Therefore, based upon the above criteria, Commission staff
preliminarily determines that the proposal satisfies the requirements
for a qualifying conduit hydropower facility, which is not required to
be licensed or exempted from licensing.
Comments and Motions To Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the COMMENTS CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY or MOTION TO INTERVENE, as applicable; (2)
state in the heading the name of the applicant and the project number
of the application to which the filing responds; (3) state the name,
address, and telephone number of the person filing; and (4) otherwise
comply with the requirements of sections 385.2001 through 385.2005 of
the Commission's regulations.\1\ All comments contesting Commission
staff's preliminary determination that the facility meets the
qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2017).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE, Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (i.e., CD18-4) in the
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call
(202) 502-8659.
Dated: December 19, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-27728 Filed 12-22-17; 8:45 am]
BILLING CODE 6717-01-P