Wallowa Resources Community Solutions Inc.; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 60977-60978 [2017-27728]

Download as PDF Federal Register / Vol. 82, No. 246 / Tuesday, December 26, 2017 / Notices forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Robert D. Jackson, Manager, Certificates & Regulatory Administration, Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas 77002–2700, by telephone at (832) 320– 5487, by fax at (832) 320–6487, or by email at robert_jackson@ transcanada.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE, Washington, DC 20426. Dated: December 18, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–27734 Filed 12–22–17; 8:45 am] BILLING CODE 6717–01–P 60977 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CD18–4–000] Wallowa Resources Community Solutions Inc.; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On December 11, 2017, Wallowa Resources Community Solutions Inc. filed a notice of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act (FPA), as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The proposed Triple Creek Ranch Hydro Station Project would have an installed capacity of 85 kilowatts (kW), and would be located along the 18-inchdiameter Triple Creek Ranch irrigation pipeline. The project would be located near the Town of Joseph in Wallowa County, Oregon. Applicant Contact: Kyle Petrocine, Wallowa Resources Community Solutions Inc., 401 NE First Street, Enterprise, OR 97828; Phone No. (541) 426–8053. FERC Contact: Robert Bell, Phone No. (202) 502–6062; Email: robert.bell@ ferc.gov. Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) A new generating unit, having a generating capacity of 85 kW, housed in a new 13foot by 17-foot powerhouse, connected to the existing 18-inch-diameter Triple Creek Ranch irrigation pipeline, and (2) appurtenant facilities. The proposed project would have an estimated annual generation of 153 megawatt-hours. A qualifying conduit hydropower facility is one that is determined or deemed to meet all of the criteria shown in the table below. TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY Description Satisfies (Y/N) FPA 30(a)(3)(A), as amended by HREA .. ethrower on DSK3G9T082PROD with NOTICES Statutory provision The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. The facility has an installed capacity that does not exceed 5 megawatts .................. Y FPA 30(a)(3)(C)(i), as amended by HREA FPA 30(a)(3)(C)(ii), HREA. VerDate Sep<11>2014 as amended 20:21 Dec 22, 2017 by Jkt 244001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\26DEN1.SGM 26DEN1 Y Y 60978 Federal Register / Vol. 82, No. 246 / Tuesday, December 26, 2017 / Notices TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY—Continued Description Satisfies (Y/N) On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. Y Statutory provision ethrower on DSK3G9T082PROD with NOTICES FPA 30(a)(3)(C)(iii), HREA. as amended by Preliminary Determination: The proposed hydroelectric project will utilize an existing irrigation pipeline, the primary purpose of which is to irrigate Triple Creek Ranch’s farm. The addition of the Triple Creek Ranch Hydro Station Project will not alter the conduit’s primary purpose. Therefore, based upon the above criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility, which is not required to be licensed or exempted from licensing. Comments and Motions To Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 45 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. Anyone may submit comments or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY or MOTION TO INTERVENE, as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system 1 18 CFR 385.2001–2005 (2017). VerDate Sep<11>2014 20:21 Dec 22, 2017 Jkt 244001 at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: Copies of the notice of intent can be obtained directly from the applicant or such copies can be viewed and reproduced at the Commission in its Public Reference Room, Room 2A, 888 First Street NE, Washington, DC 20426. The filing may also be viewed on the web at https:// www.ferc.gov/docs-filing/elibrary.asp using the ‘‘eLibrary’’ link. Enter the docket number (i.e., CD18–4) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. Dated: December 19, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–27728 Filed 12–22–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC17–15–000] Commission Information Collection Activities (FERC–505 and FERC–512); Consolidated Comment Request; Extension Federal Energy Regulatory Commission. ACTION: Comment request. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission SUMMARY: PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 (Commission or FERC) is soliciting public comment on the requirements and burden of information collections, FERC–505 (Small Hydropower Projects and Conduit Facilities including License/Relicense, Exemption and Qualifying Conduit Facility Determination) and FERC–512 (Preliminary Permit) which will be submitted to the Office of Management and Budget (OMB) for a review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission published a 60-day Notice in the Federal Register in Docket No. IC17– 15–000, (82 FR 46231, 10/04/2017) requesting public comments. FERC received no comments in response to the Notice and is indicating that in its submittals to the OMB. DATES: Comments on the collections of information are due January 25, 2018. ADDRESSES: Comments filed with OMB, identified by OMB Control Nos. 1902– 0115 and 1902–0073, should be sent via email to the Office of Information and Regulatory Affairs: oira_submission@ omb.gov. Attention: Federal Energy Regulatory Commission Desk Officer. The Desk Officer may also be reached via telephone at 202–395–0710. A copy of the comments should also be sent to the Commission, in Docket No. IC17– 15–000 by either of the following methods: • eFiling at Commission’s website: https://www.ferc.gov/docs-filing/ efiling.asp. • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov/help/submissionguide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208–3676 (toll-free), or (202) 502–8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket E:\FR\FM\26DEN1.SGM 26DEN1

Agencies

[Federal Register Volume 82, Number 246 (Tuesday, December 26, 2017)]
[Notices]
[Pages 60977-60978]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-27728]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD18-4-000]


Wallowa Resources Community Solutions Inc.; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On December 11, 2017, Wallowa Resources Community Solutions Inc. 
filed a notice of intent to construct a qualifying conduit hydropower 
facility, pursuant to section 30 of the Federal Power Act (FPA), as 
amended by section 4 of the Hydropower Regulatory Efficiency Act of 
2013 (HREA). The proposed Triple Creek Ranch Hydro Station Project 
would have an installed capacity of 85 kilowatts (kW), and would be 
located along the 18-inch-diameter Triple Creek Ranch irrigation 
pipeline. The project would be located near the Town of Joseph in 
Wallowa County, Oregon.
    Applicant Contact: Kyle Petrocine, Wallowa Resources Community 
Solutions Inc., 401 NE First Street, Enterprise, OR 97828; Phone No. 
(541) 426-8053.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062; Email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A new generating unit, having a 
generating capacity of 85 kW, housed in a new 13-foot by 17-foot 
powerhouse, connected to the existing 18-inch-diameter Triple Creek 
Ranch irrigation pipeline, and (2) appurtenant facilities. The proposed 
project would have an estimated annual generation of 153 megawatt-
hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
      Statutory provision              Description       Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by   The conduit the                      Y
 HREA.                            facility uses is a
                                  tunnel, canal,
                                  pipeline, aqueduct,
                                  flume, ditch, or
                                  similar manmade water
                                  conveyance that is
                                  operated for the
                                  distribution of water
                                  for agricultural,
                                  municipal, or
                                  industrial
                                  consumption and not
                                  primarily for the
                                  generation of
                                  electricity.
FPA 30(a)(3)(C)(i), as amended   The facility is                      Y
 by HREA.                         constructed,
                                  operated, or
                                  maintained for the
                                  generation of
                                  electric power and
                                  uses for such
                                  generation only the
                                  hydroelectric
                                  potential of a non-
                                  federally owned
                                  conduit.
FPA 30(a)(3)(C)(ii), as amended  The facility has an                  Y
 by HREA.                         installed capacity
                                  that does not exceed
                                  5 megawatts.

[[Page 60978]]

 
FPA 30(a)(3)(C)(iii), as         On or before August 9,               Y
 amended by HREA.                 2013, the facility is
                                  not licensed, or
                                  exempted from the
                                  licensing
                                  requirements of Part
                                  I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: The proposed hydroelectric project will 
utilize an existing irrigation pipeline, the primary purpose of which 
is to irrigate Triple Creek Ranch's farm. The addition of the Triple 
Creek Ranch Hydro Station Project will not alter the conduit's primary 
purpose. Therefore, based upon the above criteria, Commission staff 
preliminarily determines that the proposal satisfies the requirements 
for a qualifying conduit hydropower facility, which is not required to 
be licensed or exempted from licensing.
    Comments and Motions To Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the COMMENTS CONTESTING QUALIFICATION FOR A 
CONDUIT HYDROPOWER FACILITY or MOTION TO INTERVENE, as applicable; (2) 
state in the heading the name of the applicant and the project number 
of the application to which the filing responds; (3) state the name, 
address, and telephone number of the person filing; and (4) otherwise 
comply with the requirements of sections 385.2001 through 385.2005 of 
the Commission's regulations.\1\ All comments contesting Commission 
staff's preliminary determination that the facility meets the 
qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2017).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE, Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE, Washington, DC 20426. The filing may also be 
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (i.e., CD18-4) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call 
(202) 502-8659.

    Dated: December 19, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-27728 Filed 12-22-17; 8:45 am]
 BILLING CODE 6717-01-P