Drawbridge Operation Regulation; San Leandro Bay, Between Alameda and Bay Farm Island, CA, 60315-60316 [2017-27386]

Download as PDF 60315 Federal Register / Vol. 82, No. 243 / Wednesday, December 20, 2017 / Rules and Regulations Docket No. USCG–2016–0583 USCG–2016–0712 USCG–2016–0417 USCG–2016–0881 USCG–2016–0634 USGC–2016–0826 USCG–2016–0869 USCG–2016–0777 USCG–2016–0732 USGC–2016–0927 USCG–2012–0459 USCG–2016–0944 USCG–2011–0489 USCG–2016–0849 USCG–2016–0862 USCG–2016–0871 USCG–2009–0559 USGC–2016–0901 USCG–2016–0958 USGC–2016–0945 USCG–2016–0910 USCG–2016–0732 USCG–2016–0876 USCG–2016–0969 USCG–2016–0967 USCG–2016–0971 USCG–2016–0955 USCG–2016–0981 USCG–2016–0820 USCG–2016–0970 USCG–2016–0960 USCG–2016–0961 USCG–2016–0995 USCG–2016–0995 USCG–2016–0929 USCG–2016–1028 USCG–2016–1032 USCG–2016–0947 USCG–2016–1030 USCG–2016–1033 USCG–2012–1036 USCG–2016–0984 USCG–2016–1052 USCG–2016–1051 USCG–2016–0979 USCG–2016–1035 USCG–2016–0974 USCG–2016–1036 USCG–2016–1070 USCG–2016–1069 USCG–2016–1072 USGC–2016–1075 USCG–2009–0559 USGC–2016–1082 USCG–2016–1079 Type .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. .................................. Location Security Zones ........................................ Safety Zone ............................................. Special Local Regulations ....................... Safety Zone ............................................. Special Local Regulations ....................... Safety Zone ............................................. Safety Zone ............................................. Special Local Regulations ....................... Special Local Regulations ....................... Safety Zone ............................................. Special Local Regulations ....................... Safety Zone ............................................. Safety Zone ............................................. Security Zones ........................................ Safety Zone ............................................. Safety Zone ............................................. Safety Zone ............................................. Special Local Regulations ....................... Safety Zone ............................................. Safety Zone ............................................. Drawbridges ............................................ Special Local Regulations ....................... Drawbridges ............................................ Security Zones ........................................ Safety ...................................................... Security Zones ........................................ Special Local Regulations ....................... Security Zones ........................................ Special Local Regulations ....................... Safety Zone ............................................. Safety ...................................................... Safety ...................................................... Safety Zone ............................................. Safety Zone ............................................. Safety Zone ............................................. Safety Zone ............................................. Safety Zone ............................................. Safety ...................................................... Security Zones ........................................ Safety Zone ............................................. Safety Zone ............................................. Special Local Regulations ....................... Safety Zone ............................................. Safety Zone ............................................. Safety Zone ............................................. Safety Zone ............................................. Safety Zone ............................................. Drawbridges ............................................ Safety Zone ............................................. Safety Zones ........................................... Safety Zone ............................................. Safety Zones ........................................... Special Local Regulations ....................... Safety Zone ............................................. Safety Zone ............................................. Buffalo, NY .............................................. Cleveland, OH ......................................... Louisville, KY ........................................... Hampton, IL ............................................. Nashville, TN ........................................... Santa Cruz, CA ....................................... Florence, AL ............................................ San Diego, CA ........................................ Clearwater, FL ......................................... Allegheny River ....................................... San Francisco, CA .................................. Bethel Island, CA .................................... Chicago Burnham Park Harbor ............... Biloxi, MS ................................................ Richmond, CA ......................................... San Francisco, CA .................................. Rio Vista, CA ........................................... Chattanooga, TN ..................................... Inola, OK ................................................. Pittsburgh, PA ......................................... New Bern, NC ......................................... Clearwater, FL ......................................... Sacramento, CA ...................................... Boston, MA .............................................. Piti, Guam ................................................ Cleveland, OH ......................................... Chattanooga, TN ..................................... Pittsburgh, PA ......................................... Mayaguez Bay, PR ................................. Tanguisson, GUAM ................................. Harbor, GU .............................................. Harbor, Guam .......................................... Bellingham, WA ....................................... Bellingham, WA ....................................... Portland, OR ............................................ Beaufort, NC ............................................ Drummonds, TN ...................................... Merizo, GU .............................................. Palm Beach, FL ....................................... Moriches Bay, NY ................................... Oak dale, NY ........................................... Cabo Rojo, Puerto Rico .......................... Helena, AR .............................................. Orange, TX .............................................. Biloxi, MS ................................................ Vicksburg, MS ......................................... Savannah, GA ......................................... Seattle, WA ............................................. Fitler, MS ................................................. Calumet, LA ............................................. Fitler, MS ................................................. Drummonds, TN ...................................... Rio Vista, CA ........................................... Chicago, IL .............................................. Tumon, GU .............................................. Katia Kroutil, Office Chief, Office of Regulations and Administrative Law. DEPARTMENT OF HOMELAND SECURITY Coast Guard SUMMARY: BILLING CODE 9110–04–P 33 CFR Part 117 ethrower on DSK3G9T082PROD with RULES 6/17/2016 7/21/2016 8/27/2016 9/12/2016 9/30/2016 10/1/2016 10/1/2016 10/2/2016 10/2/2016 10/2/2016 10/7/2016 10/7/2016 10/7/2016 10/8/2016 10/8/2016 10/8/2016 10/8/2016 10/8/2016 10/12/2016 10/13/2016 10/15/2016 10/15/2016 10/16/2016 10/19/2016 10/20/2016 10/21/2016 10/22/2016 10/25/2016 10/29/2016 10/29/2016 10/31/2016 11/3/2016 11/9/2016 11/9/2016 11/13/2016 11/17/2016 11/19/2016 11/20/2016 11/22/2016 11/22/2016 11/26/2016 11/27/2016 12/2/2016 12/2/2016 12/3/2016 12/3/2016 12/4/2016 12/8/2016 12/11/2016 12/13/2016 12/15/2016 12/16/2016 12/30/2016 12/31/2016 12/31/2016 ACTION: [FR Doc. 2017–27409 Filed 12–19–17; 8:45 am] Effective date [Docket No. USCG–2017–1074] Drawbridge Operation Regulation; San Leandro Bay, Between Alameda and Bay Farm Island, CA AGENCY: VerDate Sep<11>2014 16:19 Dec 19, 2017 Jkt 244001 PO 00000 Coast Guard, DHS. Frm 00035 Fmt 4700 Sfmt 4700 Notice of deviation from drawbridge regulation. The Coast Guard has issued a temporary deviation from the operating schedule that governs the California Department of Transportation Highway and Bicycle drawbridges across San Leandro Bay, mile 0.0 and mile 0.1, between Alameda and Bay Farm Island, CA. The deviation is necessary to allow the bridge owner to perform major rehabilitation and maintenance. This deviation allows the bridges to remain E:\FR\FM\20DER1.SGM 20DER1 ethrower on DSK3G9T082PROD with RULES 60316 Federal Register / Vol. 82, No. 243 / Wednesday, December 20, 2017 / Rules and Regulations in the closed-to-navigation position during the deviation period. DATES: This deviation is effective from 6 a.m. on January 2, 2018 through 6 p.m. on May 27, 2018. ADDRESSES: The docket for this deviation, USCG–2017–1074, is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this deviation. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Carl T. Hausner, Chief, Bridge Section, Eleventh Coast Guard District; telephone 510–437– 3516; email Carl.T.Hausner@uscg.mil. SUPPLEMENTARY INFORMATION: The California Department of Transportation has requested a temporary change to the operation of the Highway and Bicycle drawbridges over San Leandro Bay, mile 0.0 and mile 0.1, between Alameda and Bay Farm Island, CA. The highway drawbridge navigation span provides a vertical clearance of 20 feet above Mean High Water in the closed-to-navigation position. The bicycle drawbridge navigation span provides a vertical clearance of 26 feet above Mean High Water in the closed-to-navigation position. The draws operate as required by 33 CFR 117.193. Navigation on the waterway is commercial and recreational. The drawspans will be secured in the closed-to-navigation position from 6 a.m. on January 2, 2018 through 6 p.m. on May 27, 2018 to allow the bridge owner to perform major rehabilitation and maintenance work, including repainting the structural steel of the highway drawbridge. A temporary platform will be installed beneath the drawspan of the highway drawbridge, reducing the vertical clearance by 3 feet. This temporary deviation has been coordinated with the waterway users. No objections to the proposed temporary deviation were raised. Vessels able to pass through the bridges in the closed position may do so at anytime. If necessary, the draws can open on signal if at least 30 days notice is given to the bridge owner. Oakland Inner Harbor Tidal Canal can be used an alternate route for vessels unable to pass through the bridges in the closed position. The Coast Guard will also inform the users of the waterway through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridges so that vessel operators can arrange their transits to minimize any impact caused by the temporary deviation. VerDate Sep<11>2014 16:19 Dec 19, 2017 Jkt 244001 In accordance with 33 CFR 117.35(e), both drawbridges must return to their regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: December 14, 2017. Carl T. Hausner, District Bridge Chief, Eleventh Coast Guard District. [FR Doc. 2017–27386 Filed 12–19–17; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2017–1027] Drawbridge Operation Regulation; Sacramento River, Sacramento, CA Coast Guard, DHS. Notice of deviation from drawbridge regulation. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Tower Drawbridge across the Sacramento River, mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the New Year’s Eve Sky Spectacular fireworks show. This deviation allows the bridge to remain in the closed-to-navigation position during the deviation period. DATES: This deviation is effective from 8 p.m. through 11 p.m. on December 31, 2017. ADDRESSES: The docket for this deviation, USCG–2017–1027, is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this deviation. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Carl T. Hausner, Chief, Bridge Section, Eleventh Coast Guard District; telephone 510–437– 3516; email Carl.T.Hausner@uscg.mil. SUPPLEMENTARY INFORMATION: The California Department of Transportation has requested a temporary change to the operation of the Tower Drawbridge over the Sacramento River, mile 59.0, at Sacramento, CA. The drawbridge navigation span provides a vertical clearance of 30 feet above Mean High Water in the closed-to-navigation position. The draw operates as required by 33 CFR 117.189(a). Navigation on the SUMMARY: PO 00000 Frm 00036 Fmt 4700 Sfmt 4700 waterway is commercial and recreational. The drawspan will be secured in the closed-to-navigation position from 8 p.m. through 11 p.m. on December 31, 2017, to allow the community to participate in the New Year’s Eve Sky Spectacular fireworks show. This temporary deviation has been coordinated with the waterway users. No objections to the proposed temporary deviation were raised. Vessels able to pass through the bridge in the closed position may do so at anytime. In the event of an emergency the draw can open on signal if at least one hour notice is given to the bridge operator. There are no immediate alternate routes for vessels to pass. The Coast Guard will also inform the users of the waterway through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessel operators can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: December 14, 2017. Carl T. Hausner, District Bridge Chief, Eleventh Coast Guard District. [FR Doc. 2017–27323 Filed 12–19–17; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2017–0311] RIN 1625–AA09 Drawbridge Operation Regulation; Quantuck Canal, Westhampton Beach, NY Coast Guard, DHS. Temporary final rule. AGENCY: ACTION: The Coast Guard is modifying the operating schedule that governs the Beach Lane Bridge across Quantuck Canal, mile 1.1, at Westhampton Beach, New York. This action is necessary to allow for an unexpected delay in the rehabilitation of the bascule leaves and painting of the bridge. A temporary deviation was previously granted for a length of 180 days. As the Coast Guard SUMMARY: E:\FR\FM\20DER1.SGM 20DER1

Agencies

[Federal Register Volume 82, Number 243 (Wednesday, December 20, 2017)]
[Rules and Regulations]
[Pages 60315-60316]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-27386]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2017-1074]


Drawbridge Operation Regulation; San Leandro Bay, Between Alameda 
and Bay Farm Island, CA

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the California Department of 
Transportation Highway and Bicycle drawbridges across San Leandro Bay, 
mile 0.0 and mile 0.1, between Alameda and Bay Farm Island, CA. The 
deviation is necessary to allow the bridge owner to perform major 
rehabilitation and maintenance. This deviation allows the bridges to 
remain

[[Page 60316]]

in the closed-to-navigation position during the deviation period.

DATES: This deviation is effective from 6 a.m. on January 2, 2018 
through 6 p.m. on May 27, 2018.

ADDRESSES: The docket for this deviation, USCG-2017-1074, is available 
at https://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Carl T. Hausner, Chief, Bridge 
Section, Eleventh Coast Guard District; telephone 510-437-3516; email 
[email protected].

SUPPLEMENTARY INFORMATION: The California Department of Transportation 
has requested a temporary change to the operation of the Highway and 
Bicycle drawbridges over San Leandro Bay, mile 0.0 and mile 0.1, 
between Alameda and Bay Farm Island, CA. The highway drawbridge 
navigation span provides a vertical clearance of 20 feet above Mean 
High Water in the closed-to-navigation position. The bicycle drawbridge 
navigation span provides a vertical clearance of 26 feet above Mean 
High Water in the closed-to-navigation position. The draws operate as 
required by 33 CFR 117.193. Navigation on the waterway is commercial 
and recreational.
    The drawspans will be secured in the closed-to-navigation position 
from 6 a.m. on January 2, 2018 through 6 p.m. on May 27, 2018 to allow 
the bridge owner to perform major rehabilitation and maintenance work, 
including repainting the structural steel of the highway drawbridge. A 
temporary platform will be installed beneath the drawspan of the 
highway drawbridge, reducing the vertical clearance by 3 feet. This 
temporary deviation has been coordinated with the waterway users. No 
objections to the proposed temporary deviation were raised.
    Vessels able to pass through the bridges in the closed position may 
do so at anytime. If necessary, the draws can open on signal if at 
least 30 days notice is given to the bridge owner. Oakland Inner Harbor 
Tidal Canal can be used an alternate route for vessels unable to pass 
through the bridges in the closed position. The Coast Guard will also 
inform the users of the waterway through our Local and Broadcast 
Notices to Mariners of the change in operating schedule for the bridges 
so that vessel operators can arrange their transits to minimize any 
impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), both drawbridges must return 
to their regular operating schedule immediately at the end of the 
effective period of this temporary deviation. This deviation from the 
operating regulations is authorized under 33 CFR 117.35.

    Dated: December 14, 2017.
Carl T. Hausner,
District Bridge Chief, Eleventh Coast Guard District.
[FR Doc. 2017-27386 Filed 12-19-17; 8:45 am]