Drawbridge Operation Regulation; San Leandro Bay, Between Alameda and Bay Farm Island, CA, 60315-60316 [2017-27386]
Download as PDF
60315
Federal Register / Vol. 82, No. 243 / Wednesday, December 20, 2017 / Rules and Regulations
Docket No.
USCG–2016–0583
USCG–2016–0712
USCG–2016–0417
USCG–2016–0881
USCG–2016–0634
USGC–2016–0826
USCG–2016–0869
USCG–2016–0777
USCG–2016–0732
USGC–2016–0927
USCG–2012–0459
USCG–2016–0944
USCG–2011–0489
USCG–2016–0849
USCG–2016–0862
USCG–2016–0871
USCG–2009–0559
USGC–2016–0901
USCG–2016–0958
USGC–2016–0945
USCG–2016–0910
USCG–2016–0732
USCG–2016–0876
USCG–2016–0969
USCG–2016–0967
USCG–2016–0971
USCG–2016–0955
USCG–2016–0981
USCG–2016–0820
USCG–2016–0970
USCG–2016–0960
USCG–2016–0961
USCG–2016–0995
USCG–2016–0995
USCG–2016–0929
USCG–2016–1028
USCG–2016–1032
USCG–2016–0947
USCG–2016–1030
USCG–2016–1033
USCG–2012–1036
USCG–2016–0984
USCG–2016–1052
USCG–2016–1051
USCG–2016–0979
USCG–2016–1035
USCG–2016–0974
USCG–2016–1036
USCG–2016–1070
USCG–2016–1069
USCG–2016–1072
USGC–2016–1075
USCG–2009–0559
USGC–2016–1082
USCG–2016–1079
Type
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
..................................
Location
Security Zones ........................................
Safety Zone .............................................
Special Local Regulations .......................
Safety Zone .............................................
Special Local Regulations .......................
Safety Zone .............................................
Safety Zone .............................................
Special Local Regulations .......................
Special Local Regulations .......................
Safety Zone .............................................
Special Local Regulations .......................
Safety Zone .............................................
Safety Zone .............................................
Security Zones ........................................
Safety Zone .............................................
Safety Zone .............................................
Safety Zone .............................................
Special Local Regulations .......................
Safety Zone .............................................
Safety Zone .............................................
Drawbridges ............................................
Special Local Regulations .......................
Drawbridges ............................................
Security Zones ........................................
Safety ......................................................
Security Zones ........................................
Special Local Regulations .......................
Security Zones ........................................
Special Local Regulations .......................
Safety Zone .............................................
Safety ......................................................
Safety ......................................................
Safety Zone .............................................
Safety Zone .............................................
Safety Zone .............................................
Safety Zone .............................................
Safety Zone .............................................
Safety ......................................................
Security Zones ........................................
Safety Zone .............................................
Safety Zone .............................................
Special Local Regulations .......................
Safety Zone .............................................
Safety Zone .............................................
Safety Zone .............................................
Safety Zone .............................................
Safety Zone .............................................
Drawbridges ............................................
Safety Zone .............................................
Safety Zones ...........................................
Safety Zone .............................................
Safety Zones ...........................................
Special Local Regulations .......................
Safety Zone .............................................
Safety Zone .............................................
Buffalo, NY ..............................................
Cleveland, OH .........................................
Louisville, KY ...........................................
Hampton, IL .............................................
Nashville, TN ...........................................
Santa Cruz, CA .......................................
Florence, AL ............................................
San Diego, CA ........................................
Clearwater, FL .........................................
Allegheny River .......................................
San Francisco, CA ..................................
Bethel Island, CA ....................................
Chicago Burnham Park Harbor ...............
Biloxi, MS ................................................
Richmond, CA .........................................
San Francisco, CA ..................................
Rio Vista, CA ...........................................
Chattanooga, TN .....................................
Inola, OK .................................................
Pittsburgh, PA .........................................
New Bern, NC .........................................
Clearwater, FL .........................................
Sacramento, CA ......................................
Boston, MA ..............................................
Piti, Guam ................................................
Cleveland, OH .........................................
Chattanooga, TN .....................................
Pittsburgh, PA .........................................
Mayaguez Bay, PR .................................
Tanguisson, GUAM .................................
Harbor, GU ..............................................
Harbor, Guam ..........................................
Bellingham, WA .......................................
Bellingham, WA .......................................
Portland, OR ............................................
Beaufort, NC ............................................
Drummonds, TN ......................................
Merizo, GU ..............................................
Palm Beach, FL .......................................
Moriches Bay, NY ...................................
Oak dale, NY ...........................................
Cabo Rojo, Puerto Rico ..........................
Helena, AR ..............................................
Orange, TX ..............................................
Biloxi, MS ................................................
Vicksburg, MS .........................................
Savannah, GA .........................................
Seattle, WA .............................................
Fitler, MS .................................................
Calumet, LA .............................................
Fitler, MS .................................................
Drummonds, TN ......................................
Rio Vista, CA ...........................................
Chicago, IL ..............................................
Tumon, GU ..............................................
Katia Kroutil,
Office Chief, Office of Regulations and
Administrative Law.
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
SUMMARY:
BILLING CODE 9110–04–P
33 CFR Part 117
ethrower on DSK3G9T082PROD with RULES
6/17/2016
7/21/2016
8/27/2016
9/12/2016
9/30/2016
10/1/2016
10/1/2016
10/2/2016
10/2/2016
10/2/2016
10/7/2016
10/7/2016
10/7/2016
10/8/2016
10/8/2016
10/8/2016
10/8/2016
10/8/2016
10/12/2016
10/13/2016
10/15/2016
10/15/2016
10/16/2016
10/19/2016
10/20/2016
10/21/2016
10/22/2016
10/25/2016
10/29/2016
10/29/2016
10/31/2016
11/3/2016
11/9/2016
11/9/2016
11/13/2016
11/17/2016
11/19/2016
11/20/2016
11/22/2016
11/22/2016
11/26/2016
11/27/2016
12/2/2016
12/2/2016
12/3/2016
12/3/2016
12/4/2016
12/8/2016
12/11/2016
12/13/2016
12/15/2016
12/16/2016
12/30/2016
12/31/2016
12/31/2016
ACTION:
[FR Doc. 2017–27409 Filed 12–19–17; 8:45 am]
Effective date
[Docket No. USCG–2017–1074]
Drawbridge Operation Regulation; San
Leandro Bay, Between Alameda and
Bay Farm Island, CA
AGENCY:
VerDate Sep<11>2014
16:19 Dec 19, 2017
Jkt 244001
PO 00000
Coast Guard, DHS.
Frm 00035
Fmt 4700
Sfmt 4700
Notice of deviation from
drawbridge regulation.
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the California
Department of Transportation Highway
and Bicycle drawbridges across San
Leandro Bay, mile 0.0 and mile 0.1,
between Alameda and Bay Farm Island,
CA. The deviation is necessary to allow
the bridge owner to perform major
rehabilitation and maintenance. This
deviation allows the bridges to remain
E:\FR\FM\20DER1.SGM
20DER1
ethrower on DSK3G9T082PROD with RULES
60316
Federal Register / Vol. 82, No. 243 / Wednesday, December 20, 2017 / Rules and Regulations
in the closed-to-navigation position
during the deviation period.
DATES: This deviation is effective from
6 a.m. on January 2, 2018 through 6 p.m.
on May 27, 2018.
ADDRESSES: The docket for this
deviation, USCG–2017–1074, is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Carl T. Hausner,
Chief, Bridge Section, Eleventh Coast
Guard District; telephone 510–437–
3516; email Carl.T.Hausner@uscg.mil.
SUPPLEMENTARY INFORMATION: The
California Department of Transportation
has requested a temporary change to the
operation of the Highway and Bicycle
drawbridges over San Leandro Bay, mile
0.0 and mile 0.1, between Alameda and
Bay Farm Island, CA. The highway
drawbridge navigation span provides a
vertical clearance of 20 feet above Mean
High Water in the closed-to-navigation
position. The bicycle drawbridge
navigation span provides a vertical
clearance of 26 feet above Mean High
Water in the closed-to-navigation
position. The draws operate as required
by 33 CFR 117.193. Navigation on the
waterway is commercial and
recreational.
The drawspans will be secured in the
closed-to-navigation position from 6
a.m. on January 2, 2018 through 6 p.m.
on May 27, 2018 to allow the bridge
owner to perform major rehabilitation
and maintenance work, including
repainting the structural steel of the
highway drawbridge. A temporary
platform will be installed beneath the
drawspan of the highway drawbridge,
reducing the vertical clearance by 3 feet.
This temporary deviation has been
coordinated with the waterway users.
No objections to the proposed
temporary deviation were raised.
Vessels able to pass through the
bridges in the closed position may do so
at anytime. If necessary, the draws can
open on signal if at least 30 days notice
is given to the bridge owner. Oakland
Inner Harbor Tidal Canal can be used an
alternate route for vessels unable to pass
through the bridges in the closed
position. The Coast Guard will also
inform the users of the waterway
through our Local and Broadcast
Notices to Mariners of the change in
operating schedule for the bridges so
that vessel operators can arrange their
transits to minimize any impact caused
by the temporary deviation.
VerDate Sep<11>2014
16:19 Dec 19, 2017
Jkt 244001
In accordance with 33 CFR 117.35(e),
both drawbridges must return to their
regular operating schedule immediately
at the end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: December 14, 2017.
Carl T. Hausner,
District Bridge Chief, Eleventh Coast Guard
District.
[FR Doc. 2017–27386 Filed 12–19–17; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2017–1027]
Drawbridge Operation Regulation;
Sacramento River, Sacramento, CA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Tower
Drawbridge across the Sacramento
River, mile 59.0, at Sacramento, CA. The
deviation is necessary to allow the
community to participate in the New
Year’s Eve Sky Spectacular fireworks
show. This deviation allows the bridge
to remain in the closed-to-navigation
position during the deviation period.
DATES: This deviation is effective from
8 p.m. through 11 p.m. on December 31,
2017.
ADDRESSES: The docket for this
deviation, USCG–2017–1027, is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Carl T. Hausner,
Chief, Bridge Section, Eleventh Coast
Guard District; telephone 510–437–
3516; email Carl.T.Hausner@uscg.mil.
SUPPLEMENTARY INFORMATION: The
California Department of Transportation
has requested a temporary change to the
operation of the Tower Drawbridge over
the Sacramento River, mile 59.0, at
Sacramento, CA. The drawbridge
navigation span provides a vertical
clearance of 30 feet above Mean High
Water in the closed-to-navigation
position. The draw operates as required
by 33 CFR 117.189(a). Navigation on the
SUMMARY:
PO 00000
Frm 00036
Fmt 4700
Sfmt 4700
waterway is commercial and
recreational.
The drawspan will be secured in the
closed-to-navigation position from 8
p.m. through 11 p.m. on December 31,
2017, to allow the community to
participate in the New Year’s Eve Sky
Spectacular fireworks show. This
temporary deviation has been
coordinated with the waterway users.
No objections to the proposed
temporary deviation were raised.
Vessels able to pass through the bridge
in the closed position may do so at
anytime. In the event of an emergency
the draw can open on signal if at least
one hour notice is given to the bridge
operator. There are no immediate
alternate routes for vessels to pass. The
Coast Guard will also inform the users
of the waterway through our Local and
Broadcast Notices to Mariners of the
change in operating schedule for the
bridge so that vessel operators can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: December 14, 2017.
Carl T. Hausner,
District Bridge Chief, Eleventh Coast Guard
District.
[FR Doc. 2017–27323 Filed 12–19–17; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2017–0311]
RIN 1625–AA09
Drawbridge Operation Regulation;
Quantuck Canal, Westhampton Beach,
NY
Coast Guard, DHS.
Temporary final rule.
AGENCY:
ACTION:
The Coast Guard is modifying
the operating schedule that governs the
Beach Lane Bridge across Quantuck
Canal, mile 1.1, at Westhampton Beach,
New York. This action is necessary to
allow for an unexpected delay in the
rehabilitation of the bascule leaves and
painting of the bridge. A temporary
deviation was previously granted for a
length of 180 days. As the Coast Guard
SUMMARY:
E:\FR\FM\20DER1.SGM
20DER1
Agencies
[Federal Register Volume 82, Number 243 (Wednesday, December 20, 2017)]
[Rules and Regulations]
[Pages 60315-60316]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-27386]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2017-1074]
Drawbridge Operation Regulation; San Leandro Bay, Between Alameda
and Bay Farm Island, CA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the California Department of
Transportation Highway and Bicycle drawbridges across San Leandro Bay,
mile 0.0 and mile 0.1, between Alameda and Bay Farm Island, CA. The
deviation is necessary to allow the bridge owner to perform major
rehabilitation and maintenance. This deviation allows the bridges to
remain
[[Page 60316]]
in the closed-to-navigation position during the deviation period.
DATES: This deviation is effective from 6 a.m. on January 2, 2018
through 6 p.m. on May 27, 2018.
ADDRESSES: The docket for this deviation, USCG-2017-1074, is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Carl T. Hausner, Chief, Bridge
Section, Eleventh Coast Guard District; telephone 510-437-3516; email
[email protected].
SUPPLEMENTARY INFORMATION: The California Department of Transportation
has requested a temporary change to the operation of the Highway and
Bicycle drawbridges over San Leandro Bay, mile 0.0 and mile 0.1,
between Alameda and Bay Farm Island, CA. The highway drawbridge
navigation span provides a vertical clearance of 20 feet above Mean
High Water in the closed-to-navigation position. The bicycle drawbridge
navigation span provides a vertical clearance of 26 feet above Mean
High Water in the closed-to-navigation position. The draws operate as
required by 33 CFR 117.193. Navigation on the waterway is commercial
and recreational.
The drawspans will be secured in the closed-to-navigation position
from 6 a.m. on January 2, 2018 through 6 p.m. on May 27, 2018 to allow
the bridge owner to perform major rehabilitation and maintenance work,
including repainting the structural steel of the highway drawbridge. A
temporary platform will be installed beneath the drawspan of the
highway drawbridge, reducing the vertical clearance by 3 feet. This
temporary deviation has been coordinated with the waterway users. No
objections to the proposed temporary deviation were raised.
Vessels able to pass through the bridges in the closed position may
do so at anytime. If necessary, the draws can open on signal if at
least 30 days notice is given to the bridge owner. Oakland Inner Harbor
Tidal Canal can be used an alternate route for vessels unable to pass
through the bridges in the closed position. The Coast Guard will also
inform the users of the waterway through our Local and Broadcast
Notices to Mariners of the change in operating schedule for the bridges
so that vessel operators can arrange their transits to minimize any
impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), both drawbridges must return
to their regular operating schedule immediately at the end of the
effective period of this temporary deviation. This deviation from the
operating regulations is authorized under 33 CFR 117.35.
Dated: December 14, 2017.
Carl T. Hausner,
District Bridge Chief, Eleventh Coast Guard District.
[FR Doc. 2017-27386 Filed 12-19-17; 8:45 am]
BILLING CODE 9110-04-P