WBI Energy Transmission, Inc.; Notice of Request Under Blanket Authorization, 60007-60008 [2017-27171]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 82, No. 241 / Monday, December 18, 2017 / Notices
Filed Date: 12/11/17.
Accession Number: 20171211–5001.
Comments Due: 5 p.m. ET 1/2/18.
Docket Numbers: ER18–420–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2017–12–11_Termination of SA 2673_
Odell Wind_NSP E&P Agreement to be
effective 12/12/2017.
Filed Date: 12/11/17.
Accession Number: 20171211–5031.
Comments Due: 5 p.m. ET 1/2/18.
Docket Numbers: ER18–421–000.
Applicants: Southwest Power Pool,
Inc.
Description: Petition for Waiver of
Tariff Provisions of Southwest Power
Pool, Inc.
Filed Date: 12/8/17.
Accession Number: 20171208–5172.
Comments Due: 5 p.m. ET 12/29/17.
Docket Numbers: ER18–422–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to Service Agreement Nos.
3071 and 3072, Queue Nos. U1–059/
W1–056 to be effective 8/30/2011.
Filed Date: 12/11/17.
Accession Number: 20171211–5045.
Comments Due: 5 p.m. ET 1/2/18.
Docket Numbers: ER18–423–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing: SVP
Work Performance Agreement for NRS
Breaker Replacement (SA 343) to be
effective 12/12/2017.
Filed Date: 12/11/17.
Accession Number: 20171211–5136.
Comments Due: 5 p.m. ET 1/2/18.
Docket Numbers: ER18–424–000.
Applicants: NSTAR Electric
Company.
Description: § 205(d) Rate Filing:
Covanta SEMASS IA to be effective
12/1/2017.
Filed Date: 12/11/17.
Accession Number: 20171211–5143.
Comments Due: 5 p.m. ET 1/2/18.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES18–17–000.
Applicants: KCP&L Greater Missouri
Operations Company.
Description: Application for
Authorization of Issuance of Short-Term
Debt Securities Under Section 204 of the
Federal Power Act of KCP&L Greater
Missouri Operations Company.
Filed Date: 12/11/17.
Accession Number: 20171211–5128.
Comments Due: 5 p.m. ET 1/2/18.
The filings are accessible in the
Commission’s eLibrary system by
VerDate Sep<11>2014
17:53 Dec 15, 2017
Jkt 244001
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 11, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–27175 Filed 12–15–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–21–000]
WBI Energy Transmission, Inc.; Notice
of Request Under Blanket
Authorization
Take notice that on November 30,
2017, WBI Energy Transmission, Inc.
(WBI Energy), 1250 West Century
Avenue, Bismarck, North Dakota filed a
prior notice application pursuant to
sections 157.205, 157.210 of the Federal
Energy Regulatory Commission’s
(Commission) regulations under the
Natural Gas Act (NGA), and WBI
Energy’s blanket certificate issued in
Docket No. CP82–487–000. WBI Energy
requests authorization to construct and
operate Spring Creek Expansion Project.
The filing may also be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Specifically, WBI Energy proposes to:
(1) construct approximately 12 miles of
24-inch diameter steel pipeline to
provide an additional connection to
Northern Border Pipeline Company and
add facilities at its Cherry Creek Valve
Setting; (2) expand its Spring Creek
Meter Station; and (3) expand its Wild
PO 00000
Frm 00008
Fmt 4703
Sfmt 4703
60007
Basin Meter Station in McKenzie
County, North Dakota.
Any questions regarding the
application should be directed to Lori
Myerchin, Manager, Regulatory Affairs,
WBI Energy Transmission, Inc., 1250
West Century Avenue, Bismarck, North
Dakota 58503, (701) 530–1563 or by
email at lori.myerchin@wbienergy.com
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
E:\FR\FM\18DEN1.SGM
18DEN1
60008
Federal Register / Vol. 82, No. 241 / Monday, December 18, 2017 / Notices
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
Dated: December 11, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–27171 Filed 12–15–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5891–009]
daltland on DSKBBV9HB2PROD with NOTICES
Deschutes Valley Water District; Notice
of Revised Application Accepted for
Filing, Soliciting Motions To Intervene
and Protests, Comments,
Recommendations, Terms and
Conditions, and Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Revised
Amendment Application.
b. Project No.: 5891–009.
c. Date Filed: October 31, 2017.
d. Applicant: Deschutes Valley Water
District (licensee).
e. Name of Project: Opal Springs
Hydroelectric Project.
f. Location: The project is located on
the Crooked River in Jefferson County,
Oregon.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Edson Pugh,
General Manager, Deschutes Valley
Water District, 881 SW Culver Highway,
Madras, Oregon 97741; telephone (541)
475–3849; email edson@dvwd.org.
i. FERC Contact: Jennifer Ambler;
telephone: (202) 502–8586; email
address: jennifer.ambler@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, terms and
conditions, and fishway prescriptions is
30 days from the issuance date of this
notice by the Commission.
VerDate Sep<11>2014
17:53 Dec 15, 2017
Jkt 244001
All documents may be filed
electronically via the internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s
website at https://www.ferc.gov/docsfiling/efiling.asp. The Commission
strongly encourages electronic filing.
Please file motions to intervene,
protests, comments, recommendations,
terms and conditions and fishway
prescriptions using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426.
The first page of any filing should
include docket number P–5891–009.
k. Description of Request: On October
8, 2015, the licensee filed an application
to amend its license and install fish
passage facilities at the project. Public
notice of the application was issued
November 5, 2015. That application was
placed in abeyance on December 21,
2016. The licensee’s October 31, 2017
filing of its revised amendment
application lifts the abeyance.
Therefore, Commission staff notices the
licensee’s revised amendment
application.
The licensee proposes to construct
upstream fish passage facilities on the
east bank of the dam and to modify the
existing spillway to improve
downstream fish passage. To
accommodate the proposed
modifications, the licensee would raise
the project’s normal maximum reservoir
elevation by 3 feet and would replace
the current flashboard system with a
fixed wooden flashboard section along
with one inflatable weir to attain the
proposed higher reservoir elevation. The
licensee states that the amendment is
necessary to facilitate the reintroduction
of steelhead trout and Chinook salmon.
Revisions to the licensee’s original
application include a reduction in the
proposed normal maximum pool
elevation increase from 6 feet to 3 feet,
a modified forebay elevation range for
fish ladder operation, a single fish
ladder exit, and the use of one gate for
downstream fish passage.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
PO 00000
Frm 00009
Fmt 4703
Sfmt 4703
Commission’s Public Reference Room,
located at 888 First Street, NE, Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application. The revised application
remains a part of the original
proceeding; therefore, interveners to the
original proceeding need not refile
intervention motions.
o. Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the title PROTEST,
MOTION TO INTERVENE,
COMMENTS, RECOMMENDATIONS,
TERMS AND CONDITIONS, or
FISHWAY PRESCRIPTIONS; (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). All comments,
recommendations, terms and
conditions, or prescriptions should
relate to the proposed amendment
application and fish passage operation
E:\FR\FM\18DEN1.SGM
18DEN1
Agencies
[Federal Register Volume 82, Number 241 (Monday, December 18, 2017)]
[Notices]
[Pages 60007-60008]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-27171]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-21-000]
WBI Energy Transmission, Inc.; Notice of Request Under Blanket
Authorization
Take notice that on November 30, 2017, WBI Energy Transmission,
Inc. (WBI Energy), 1250 West Century Avenue, Bismarck, North Dakota
filed a prior notice application pursuant to sections 157.205, 157.210
of the Federal Energy Regulatory Commission's (Commission) regulations
under the Natural Gas Act (NGA), and WBI Energy's blanket certificate
issued in Docket No. CP82-487-000. WBI Energy requests authorization to
construct and operate Spring Creek Expansion Project. The filing may
also be viewed on the web at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC at [email protected] or call toll-free, (866) 208-3676 or
TTY, (202) 502-8659.
Specifically, WBI Energy proposes to: (1) construct approximately
12 miles of 24-inch diameter steel pipeline to provide an additional
connection to Northern Border Pipeline Company and add facilities at
its Cherry Creek Valve Setting; (2) expand its Spring Creek Meter
Station; and (3) expand its Wild Basin Meter Station in McKenzie
County, North Dakota.
Any questions regarding the application should be directed to Lori
Myerchin, Manager, Regulatory Affairs, WBI Energy Transmission, Inc.,
1250 West Century Avenue, Bismarck, North Dakota 58503, (701) 530-1563
or by email at [email protected]
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties.
[[Page 60008]]
However, the non-party commenter will not receive copies of all
documents filed by other parties or issued by the Commission (except
for the mailing of environmental documents issued by the Commission)
and will not have the right to seek court review of the Commission's
final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the eFiling link at
https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Dated: December 11, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-27171 Filed 12-15-17; 8:45 am]
BILLING CODE 6717-01-P