Combined Notice of Filings, 58387-58388 [2017-26743]

Download as PDF Federal Register / Vol. 82, No. 237 / Tuesday, December 12, 2017 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 10253–000] ethrower on DSK3G9T082PROD with NOTICES Notice of Authorization for Continued Project Operation; Pelzer Hydro Company, LLC, Consolidated Hydro Southeast, LLC On November 30, 2015 Pelzer Hydro Company, LLC and Consolidated Hydro Southeast, LLC, licensee(s) for the Lower Pelzer Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Lower Pelzer Hydroelectric project facilities are located on the Saluda River in Anderson and Greenville Counties, South Carolina. The license for Project No. 10253 was issued for a period ending November 30, 2017. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 10253 is issued to the licensee(s) for a period effective December 1, 2017 through November 30, 2018 or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before November 30, 2018, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is VerDate Sep<11>2014 20:03 Dec 11, 2017 Jkt 244001 renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the licensee(s), Pelzer Hydro Company, LLC and Consolidated Hydro Southeast, LLC, are authorized to continue operation of the Lower Pelzer Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: December 6, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–26745 Filed 12–11–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 10254–000] Notice of Authorization for Continued Project Operation; Pelzer Hydro Company, LLC, Consolidated Hydro Southeast, LLC On November 30, 2015 Pelzer Hydro Company, LLC and Consolidated Hydro Southeast, LLC, licensee(s) for the Upper Pelzer Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Upper Pelzer Hydroelectric project facilities are located on the Saluda River in Anderson and Greenville Counties, South Carolina. The license for Project No. 10254 was issued for a period ending November 30, 2017. Section 15(a) (1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 58387 project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 10254 is issued to the licensee(s) for a period effective December 1, 2017 through November 30, 2018 or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before November 30, 2018, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the licensee(s), Pelzer Hydro Company, LLC and Consolidated Hydro Southeast, LLC, are authorized to continue operation of the Upper Pelzer Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: December 6, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–26746 Filed 12–11–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: CP16–22–002. Applicants: NEXUS Gas Transmission, LLC. Description: Abbreviated Application for an Amendment to the Certificate of Public Convenience and Necessity issued to NEXUS Gas Transmission, LLC. Filed Date: 12/4/17. Accession Number: 20171204–5151. Comments Due: 5 p.m. ET 12/26/17. Docket Numbers: RP17–972–001. Applicants: Wyoming Interstate Company, L.L.C. E:\FR\FM\12DEN1.SGM 12DEN1 ethrower on DSK3G9T082PROD with NOTICES 58388 Federal Register / Vol. 82, No. 237 / Tuesday, December 12, 2017 / Notices Description: Compliance filing Settlement Compliance Filing in Docket No. RP17–972 to be effective 11/1/2017. Filed Date: 12/1/17. Accession Number: 20171201–5312. Comments Due: 5 p.m. ET 12/13/17. Docket Numbers: RP18–235–000. Applicants: Wyoming Interstate Company, L.L.C. Description: § 4(d) Rate Filing: NonConforming Agreement Filing (CLFP) to be effective 1/4/2018. Filed Date: 12/5/17. Accession Number: 20171205–5001. Comments Due: 5 p.m. ET 12/18/17. Docket Numbers: RP18–236–000. Applicants: Guardian Pipeline, L.L.C. Description: § 4(d) Rate Filing: Update Contact Information on Title Sheet to be effective 1/5/2018. Filed Date: 12/5/17. Accession Number: 20171205–5022. Comments Due: 5 p.m. ET 12/18/17. Docket Numbers: RP18–237–000. Applicants: Guardian Pipeline, L.L.C. Description: § 4(d) Rate Filing: Update Contact Information on Tariff’s Title sheet to be effective 1/5/2018. Filed Date: 12/5/17. Accession Number: 20171205–5025. Comments Due: 5 p.m. ET 12/18/17. Docket Numbers: RP18–238–000. Applicants: Midwestern Gas Transmission Company. Description: § 4(d) Rate Filing: Update contact information on Title Page to be effective 1/5/2018. Filed Date: 12/5/17. Accession Number: 20171205–5026. Comments Due: 5 p.m. ET 12/18/17. Docket Numbers: RP18–239–000. Applicants: OkTex Pipeline Company, L.L.C. Description: § 4(d) Rate Filing: Update Josh Franks Information on Title Page to be effective 1/5/2018. Filed Date: 12/5/17. Accession Number: 20171205–5027. Comments Due: 5 p.m. ET 12/18/17. Docket Numbers: RP18–240–000. Applicants: Viking Gas Transmission Company. Description: § 4(d) Rate Filing: Update Contact Information on Tariff’s Title Sheet to be effective 1/5/2018. Filed Date: 12/5/17. Accession Number: 20171205–5046. Comments Due: 5 p.m. ET 12/18/17. Docket Numbers: RP18–241–000. Applicants: Northwest Pipeline LLC. Description: § 4(d) Rate Filing: Acquiring Available Capacity Revisions Filing to be effective 2/1/2018. Filed Date: 12/5/17. Accession Number: 20171205–5129. Comments Due: 5 p.m. ET 12/18/17. The filings are accessible in the Commission’s eLibrary system by VerDate Sep<11>2014 20:03 Dec 11, 2017 Jkt 244001 clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 6, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–26743 Filed 12–11–17; 8:45 am] BILLING CODE 6717–01–P FEDERAL COMMUNICATIONS COMMISSION [OMB 3060–1054] Information Collection Being Reviewed by the Federal Communications Commission Under Delegated Authority Federal Communications Commission. ACTION: Notice and request for comments. AGENCY: As part of its continuing effort to reduce paperwork burdens, and as required by the Paperwork Reduction Act of 1995 (PRA), the Federal Communications Commission (FCC or Commission) invites the general public and other Federal agencies to take this opportunity to comment on the following information collections. Comments are requested concerning: Whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; the accuracy of the Commission’s burden estimate; ways to enhance the quality, utility, and clarity of the information collected; ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology; and ways to further reduce the information collection burden on small business concerns with fewer than 25 employees. SUMMARY: PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 The FCC may not conduct or sponsor a collection of information unless it displays a currently valid Office of Management and Budget (OMB) control number. No person shall be subject to any penalty for failing to comply with a collection of information subject to the PRA that does not display a valid OMB control number. DATES: Written comments should be submitted on or before February 12, 2018. If you anticipate that you will be submitting comments, but find it difficult to do so within the period of time allowed by this notice, you should advise the contacts below as soon as possible. ADDRESSES: Direct all PRA comments to Cathy Williams, FCC, via email: PRA@ fcc.gov and to Cathy.Williams@fcc.gov. FOR FURTHER INFORMATION CONTACT: For additional information about the information collection, contact Cathy Williams at (202) 418–2918. SUPPLEMENTARY INFORMATION: As part of its continuing effort to reduce paperwork burdens, and as required by the PRA, 44 U.S.C. 3501–3520, the FCC invites the general public and other Federal agencies to take this opportunity to comment on the following information collections. Comments are requested concerning: Whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; the accuracy of the Commission’s burden estimate; ways to enhance the quality, utility, and clarity of the information collected; ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology; and ways to further reduce the information collection burden on small business concerns with fewer than 25 employees. OMB Control No.: 3060–1054. Title: Application for Renewal of an International Broadcast Station License. Form No.: FCC Form 422–IB. Type of Review: Extension of a currently approved information collection. Respondents: Business or other forprofit entities. Number of Respondents: 10 respondents; 50 responses. Estimated Time per Response: 1–8 hours per response. Frequency of Response: On occasion reporting requirement; Recordkeeping requirement. Obligation To Respond: Required to obtain or retain benefits. The statutory E:\FR\FM\12DEN1.SGM 12DEN1

Agencies

[Federal Register Volume 82, Number 237 (Tuesday, December 12, 2017)]
[Notices]
[Pages 58387-58388]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-26743]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: CP16-22-002.
    Applicants: NEXUS Gas Transmission, LLC.
    Description: Abbreviated Application for an Amendment to the 
Certificate of Public Convenience and Necessity issued to NEXUS Gas 
Transmission, LLC.
    Filed Date: 12/4/17.
    Accession Number: 20171204-5151.
    Comments Due: 5 p.m. ET 12/26/17.

    Docket Numbers: RP17-972-001.
    Applicants: Wyoming Interstate Company, L.L.C.

[[Page 58388]]

    Description: Compliance filing Settlement Compliance Filing in 
Docket No. RP17-972 to be effective 11/1/2017.
    Filed Date: 12/1/17.
    Accession Number: 20171201-5312.
    Comments Due: 5 p.m. ET 12/13/17.

    Docket Numbers: RP18-235-000.
    Applicants: Wyoming Interstate Company, L.L.C.
    Description: Sec.  4(d) Rate Filing: Non-Conforming Agreement 
Filing (CLFP) to be effective 1/4/2018.
    Filed Date: 12/5/17.
    Accession Number: 20171205-5001.
    Comments Due: 5 p.m. ET 12/18/17.

    Docket Numbers: RP18-236-000.
    Applicants: Guardian Pipeline, L.L.C.
    Description: Sec.  4(d) Rate Filing: Update Contact Information on 
Title Sheet to be effective 1/5/2018.
    Filed Date: 12/5/17.
    Accession Number: 20171205-5022.
    Comments Due: 5 p.m. ET 12/18/17.

    Docket Numbers: RP18-237-000.
    Applicants: Guardian Pipeline, L.L.C.
    Description: Sec.  4(d) Rate Filing: Update Contact Information on 
Tariff's Title sheet to be effective 1/5/2018.
    Filed Date: 12/5/17.
    Accession Number: 20171205-5025.
    Comments Due: 5 p.m. ET 12/18/17.

    Docket Numbers: RP18-238-000.
    Applicants: Midwestern Gas Transmission Company.
    Description: Sec.  4(d) Rate Filing: Update contact information on 
Title Page to be effective 1/5/2018.
    Filed Date: 12/5/17.
    Accession Number: 20171205-5026.
    Comments Due: 5 p.m. ET 12/18/17.

    Docket Numbers: RP18-239-000.
    Applicants: OkTex Pipeline Company, L.L.C.
    Description: Sec.  4(d) Rate Filing: Update Josh Franks Information 
on Title Page to be effective 1/5/2018.
    Filed Date: 12/5/17.
    Accession Number: 20171205-5027.
    Comments Due: 5 p.m. ET 12/18/17.

    Docket Numbers: RP18-240-000.
    Applicants: Viking Gas Transmission Company.
    Description: Sec.  4(d) Rate Filing: Update Contact Information on 
Tariff's Title Sheet to be effective 1/5/2018.
    Filed Date: 12/5/17.
    Accession Number: 20171205-5046.
    Comments Due: 5 p.m. ET 12/18/17.

    Docket Numbers: RP18-241-000.
    Applicants: Northwest Pipeline LLC.
    Description: Sec.  4(d) Rate Filing: Acquiring Available Capacity 
Revisions Filing to be effective 2/1/2018.
    Filed Date: 12/5/17.
    Accession Number: 20171205-5129.
    Comments Due: 5 p.m. ET 12/18/17.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: December 6, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-26743 Filed 12-11-17; 8:45 am]
 BILLING CODE 6717-01-P