Turlock Irrigation District, Modesto Irrigation District; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions, 57592-57593 [2017-26247]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
57592
Federal Register / Vol. 82, No. 233 / Wednesday, December 6, 2017 / Notices
Agency NITSA NOA to be effective 2/
1/2018.
Filed Date: 11/30/17.
Accession Number: 20171130–5084.
Comments Due: 5 p.m. ET 12/21/17.
Docket Numbers: ER18–353–000.
Applicants: New England Power Pool
Participants Committee.
Description: § 205(d) Rate Filing: Dec
2017 Membership Filing to be effective
12/1/2017.
Filed Date: 11/30/17.
Accession Number: 20171130–5139.
Comments Due: 5 p.m. ET 12/21/17.
Docket Numbers: ER18–354–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original Service Agreement No. 4849;
Queue No. AA2–169 (WMPA) to be
effective 11/16/2017.
Filed Date: 11/30/17.
Accession Number: 20171130–5140.
Comments Due: 5 p.m. ET 12/21/17.
Docket Numbers: ER18–355–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Cottonwood Dynamic Schedule
Agreement SA No. 4823 to be effective
11/29/2017.
Filed Date: 11/30/17.
Accession Number: 20171130–5142.
Comments Due: 5 p.m. ET 12/21/17.
Docket Numbers: ER18–356–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing:
Amendment to Due West-DEC NITSA to
be effective 1/1/2018.
Filed Date: 11/30/17.
Accession Number: 20171130–5148.
Comments Due: 5 p.m. ET 12/21/17.
Docket Numbers: ER18–357–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
November 2017 Western WDT Service
Agreement Biannual Filing to be
effective 2/1/2018.
Filed Date: 11/30/17.
Accession Number: 20171130–5153.
Comments Due: 5 p.m. ET 12/21/17.
Docket Numbers: ER18–358–000.
Applicants: San Diego Gas & Electric
Company.
Description: Fifth Annual
Informational Filing [Cycle 5] of Fourth
Transmission Owner Rate Formula rate
mechanism of San Diego Gas & Electric
Company.
Filed Date: 11/30/17.
Accession Number: 20171130–5155.
Comments Due: 5 p.m. ET 12/21/17.
Docket Numbers: ER18–359–000.
Applicants: Pacific Gas and Electric
Company.
VerDate Sep<11>2014
18:07 Dec 05, 2017
Jkt 244001
Description: § 205(d) Rate Filing:
November 2017 Western
Interconnection Agreement Biannual
Filing to be effective 2/1/2018.
Filed Date: 11/30/17.
Accession Number: 20171130–5161.
Comments Due: 5 p.m. ET 12/21/17.
Docket Numbers: ER18–360–000.
Applicants: Entergy Arkansas, Inc.
Description: § 205(d) Rate Filing:
AECI LBA Agreement to be effective 12/
1/2017.
Filed Date: 11/30/17.
Accession Number: 20171130–5171.
Comments Due: 5 p.m. ET 12/21/17.
Docket Numbers: ER18–361–000.
Applicants: Public Service Company
of Oklahoma.
Description: § 205(d) Rate Filing:
PSO–OGE Malcolm Road Delivery Point
Agreement to be effective 11/2/2017.
Filed Date: 11/30/17.
Accession Number: 20171130–5186.
Comments Due: 5 p.m. ET 12/21/17.
Docket Numbers: ER18–362–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX-Apex Midway Wind IA 3rd
Amend & Restated to be effective 11/5/
2017.
Filed Date: 11/30/17.
Accession Number: 20171130–5187.
Comments Due: 5 p.m. ET 12/21/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 30, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–26241 Filed 12–5–17; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14581–002]
Turlock Irrigation District, Modesto
Irrigation District; Notice of Application
Accepted for Filing, Soliciting Motions
To Intervene and Protests, Ready for
Environmental Analysis, and Soliciting
Comments, Recommendations,
Preliminary Terms and Conditions, and
Preliminary Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major License.
b. Project No.: 14581–002.
c. Date filed: October 11, 2017.
d. Applicant: Turlock Irrigation
District (TID) and Modesto Irrigation
District (MID) (Districts).
e. Name of Project: La Grange
Hydroelectric Project,
f. Location: The La Grange Project is
located on the Tuolumne River in
Stanislaus and Tuolumne Counties,
California. Portions of the project
occupy public lands managed by the
Bureau of Land Management.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contacts: Steve Boyd,
Turlock Irrigation District, 333 East
Canal Drive, Turlock, California 95381–
0949, (209) 883–8300; and Anna
Brathwaite, Modesto Irrigation District,
P.O. Box 4060, Modesto, CA 95352,
(209) 526–7384.
i. FERC Contact: Jim Hastreiter at
(503) 552–2760 or james.hastreiter@
ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
prescriptions: 60 days from the issuance
date of this notice; reply comments are
due 105 days from the issuance date of
this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
fishway prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
E:\FR\FM\06DEN1.SGM
06DEN1
57593
daltland on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 82, No. 233 / Wednesday, December 6, 2017 / Notices
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14581–002.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. The La Grange Project consists of
the following existing facilities: (1) La
Grange dam, a 310-foot-long, 131-foothigh, masonry arch dam; (2) La Grange
reservoir with a storage capacity of
about 500 acre-feet; (3) MID headworks,
canal, and sluice gates are part of MID’s
retired irrigation canal facilities; (4) TID
irrigation intake and tunnel; (5) a
powerhouse with two Francis turbinegenerator units with a maximum
capacity of 4.9 megawatts. The project’s
estimated average annual generation is
about 19,638 megawatt-hours.
The Districts propose to: (1) Provide
a minimum flow of approximately 5 to
10 cubic feet per second to the plunge
pool downstream of La Grange diversion
dam at all times; (2) install a fish
exclusion barrier at the TID sluice
channel entrance; (3) conduct dissolved
oxygen monitoring in the vicinity of the
La Grange powerhouse; (4) construct a
recreational foot trail extending from the
former Don Pedro Visitor Center parking
lot to the La Grange headpond; and (5)
develop an HPMP in consultation with
Tribes, Bureau of Land Management,
and State Historical Preservation Officer
to manage potential effects on historic
properties.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
VerDate Sep<11>2014
18:07 Dec 05, 2017
Jkt 244001
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title PROTEST, MOTION TO
INTERVENE, COMMENTS, REPLY
COMMENTS, RECOMMENDATIONS,
PRELIMINARY TERMS AND
CONDITIONS, or PRELIMINARY
FISHWAY PRESCRIPTIONS; (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural Schedule:
The application will be processed
according to the following revised
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Target date
Filing of recommendations,
preliminary terms and conditions, and preliminary
fishway prescriptions.
Commission issues Draft Environmental Statement
(EIS).
Comments on Draft EIS ........
Modified Terms and Conditions.
January 2018.
PO 00000
Frm 00025
Fmt 4703
August 2018.
October 2018.
December
2018.
Sfmt 4703
Milestone
Commission Issues Final EIS
Target date
March 2019.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: November 30, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–26247 Filed 12–5–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP17–21–001, CP17–21–000,
CP18–7–000]
Port Arthur Pipeline LLC; Notice of
Amendment to Application
Take notice that on November 7,
2017, Port Arthur Pipeline LLC (Port
Arthur Pipeline), 2925 Briarpark, Suite
900, Houston, Texas 77042, filed an
amendment to its application in Docket
No. CP17–21–000, pursuant to section
7(c) of the Natural Gas Act (NGA) and
Part 157 of the Commission’s
regulations for a certificate of public
convenience and necessity to construct
and operate the Texas Connector Project
located in Orange and Jefferson
Counties, Texas and Cameron Parish,
Louisiana.
Specifically, Port Arthur Pipeline
filed an amendment to its proposed Rate
Schedules and General Terms and
Conditions (GT&C) to reflect the pro
forma tariff proposed by Port Arthur
Pipeline in Docket No. CP18–7–000 for
its Louisiana Connector Project. Further,
Port Arthur Pipeline proposes changes
to its initial rates for service through the
Texas Connector Project to reflect
changes to: (i) The Allowance for Funds
Used During Construction, (ii) the rate
for service under Port Arthur Pipeline’s
proposed Rate Schedule Enhanced
Hourly Firm Transportation; and (iii)
the precedent agreement between Port
Arthur Pipeline and Port Arthur LNG,
LLC (Port Arthur LNG) executed in
association with the open seasons
E:\FR\FM\06DEN1.SGM
06DEN1
Agencies
[Federal Register Volume 82, Number 233 (Wednesday, December 6, 2017)]
[Notices]
[Pages 57592-57593]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-26247]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14581-002]
Turlock Irrigation District, Modesto Irrigation District; Notice
of Application Accepted for Filing, Soliciting Motions To Intervene and
Protests, Ready for Environmental Analysis, and Soliciting Comments,
Recommendations, Preliminary Terms and Conditions, and Preliminary
Fishway Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Major License.
b. Project No.: 14581-002.
c. Date filed: October 11, 2017.
d. Applicant: Turlock Irrigation District (TID) and Modesto
Irrigation District (MID) (Districts).
e. Name of Project: La Grange Hydroelectric Project,
f. Location: The La Grange Project is located on the Tuolumne River
in Stanislaus and Tuolumne Counties, California. Portions of the
project occupy public lands managed by the Bureau of Land Management.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contacts: Steve Boyd, Turlock Irrigation District, 333
East Canal Drive, Turlock, California 95381-0949, (209) 883-8300; and
Anna Brathwaite, Modesto Irrigation District, P.O. Box 4060, Modesto,
CA 95352, (209) 526-7384.
i. FERC Contact: Jim Hastreiter at (503) 552-2760 or
james.hastreiter@ferc.gov.
j. Deadline for filing motions to intervene and protests, comments,
recommendations, preliminary terms and conditions, and preliminary
prescriptions: 60 days from the issuance date of this notice; reply
comments are due 105 days from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, comments, recommendations, preliminary
terms and conditions, and preliminary fishway prescriptions using the
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[[Page 57593]]
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14581-002.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. The La Grange Project consists of the following existing
facilities: (1) La Grange dam, a 310-foot-long, 131-foot-high, masonry
arch dam; (2) La Grange reservoir with a storage capacity of about 500
acre-feet; (3) MID headworks, canal, and sluice gates are part of MID's
retired irrigation canal facilities; (4) TID irrigation intake and
tunnel; (5) a powerhouse with two Francis turbine-generator units with
a maximum capacity of 4.9 megawatts. The project's estimated average
annual generation is about 19,638 megawatt-hours.
The Districts propose to: (1) Provide a minimum flow of
approximately 5 to 10 cubic feet per second to the plunge pool
downstream of La Grange diversion dam at all times; (2) install a fish
exclusion barrier at the TID sluice channel entrance; (3) conduct
dissolved oxygen monitoring in the vicinity of the La Grange
powerhouse; (4) construct a recreational foot trail extending from the
former Don Pedro Visitor Center parking lot to the La Grange headpond;
and (5) develop an HPMP in consultation with Tribes, Bureau of Land
Management, and State Historical Preservation Officer to manage
potential effects on historic properties.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Anyone may submit comments, a protest, or a motion to intervene
in accordance with the requirements of Rules of Practice and Procedure,
18 CFR 385.210, .211, and .214. In determining the appropriate action
to take, the Commission will consider all protests or other comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received on or
before the specified comment date for the particular application.
All filings must (1) bear in all capital letters the title PROTEST,
MOTION TO INTERVENE, COMMENTS, REPLY COMMENTS, RECOMMENDATIONS,
PRELIMINARY TERMS AND CONDITIONS, or PRELIMINARY FISHWAY PRESCRIPTIONS;
(2) set forth in the heading the name of the applicant and the project
number of the application to which the filing responds; (3) furnish the
name, address, and telephone number of the person protesting or
intervening; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. All comments, recommendations, terms and
conditions or prescriptions must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may
obtain copies of the application directly from the applicant. A copy of
any protest or motion to intervene must be served upon each
representative of the applicant specified in the particular
application. A copy of all other filings in reference to this
application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
o. Procedural Schedule:
The application will be processed according to the following
revised Hydro Licensing Schedule. Revisions to the schedule may be made
as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing of recommendations, preliminary January 2018.
terms and conditions, and preliminary
fishway prescriptions.
Commission issues Draft Environmental August 2018.
Statement (EIS).
Comments on Draft EIS..................... October 2018.
Modified Terms and Conditions............. December 2018.
Commission Issues Final EIS............... March 2019.
------------------------------------------------------------------------
p. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of this notice.
q. A license applicant must file no later than 60 days following
the date of issuance of the notice of acceptance and ready for
environmental analysis provided for in 5.22: (1) A copy of the water
quality certification; (2) a copy of the request for certification,
including proof of the date on which the certifying agency received the
request; or (3) evidence of waiver of water quality certification.
Dated: November 30, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-26247 Filed 12-5-17; 8:45 am]
BILLING CODE 6717-01-P