Notice of Commission and Commission Staff Attendance at Midcontinent Independent System Operator, Inc. Meetings, 57597-57598 [2017-26245]

Download as PDF Federal Register / Vol. 82, No. 233 / Wednesday, December 6, 2017 / Notices the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must (1) bear in all capital letters the title PROTEST, MOTION TO INTERVENE, COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, PRELIMINARY TERMS AND CONDITIONS, or PRELIMINARY FISHWAY PRESCRIPTIONS; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. Procedural Schedule: The application will be processed according to the following revised Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone daltland on DSKBBV9HB2PROD with NOTICES Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions. Commission issues Draft Environmental Statement (EIS). Comments on Draft EIS ........ Modified Terms and Conditions. Commission Issues Final EIS Target date December 2017. July 2018. September 2018. November 2018. February 2019. p. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of this notice. VerDate Sep<11>2014 18:07 Dec 05, 2017 Jkt 244001 q. A license applicant must file no later than 60 days following the date of issuance of the notice of acceptance and ready for environmental analysis provided for in 5.22: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Dated: November 30, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–26246 Filed 12–5–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission and Commission Staff Attendance at Midcontinent Independent System Operator, Inc. Meetings The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and its staff may attend the following MISO-related meetings: MISO Board of Directors Meeting, December 7, 2017, 8:30 a.m.– 11:00 a.m. Unless otherwise noted, all of the meetings above will be held at: MISO Headquarters, 720 City Center Drive, Carmel, IN 46032–7574. Further information and dial in instructions may be found at https:// www.misoenergy.org. All meetings are Eastern Time. The discussions may address matters at issue in the following proceedings: Docket No. ER16–1766, Midcontinent Independent System Operator, Inc. Docket No. EL16–108, Tilton Energy v. Midcontinent Independent System Operator, Inc. Docket No. ER16–2225, Midcontinent Independent System Operator, Inc. Docket No. ER16–2355, Midcontinent Independent System Operator, Inc. Docket No. ER17–215, Midcontinent Independent System Operator, Inc. Docket No. ER12–1266, Midcontinent Independent System Operator, Inc. Docket No. ER17–67, Midcontinent Independent System Operator, Inc. Docket No. ER17–827, Midcontinent Independent System Operator, Inc. Docket No. ER17–305, Midcontinent Independent System Operator, Inc. Docket No. ER17–892, Midcontinent Independent System Operator, Inc. Docket No. ER17–156, Midcontinent Independent System Operator, Inc. Docket No. ER16–2534, Midcontinent Independent System Operator, Inc. PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 57597 Docket No. ER17–1376, Midcontinent Independent System Operator, Inc. Docket No. ER17–1570, Midcontinent Independent System Operator, Inc. Docket No. ER17–1571, Midcontinent Independent System Operator, Inc. Docket No. ER17–1712, Midcontinent Independent System Operator, Inc. Docket No. ER17–1376, Midcontinent Independent System Operator, Inc. Docket No. ER17–2097, Midcontinent Independent System Operator, Inc. Docket No. ER17–2113, Midcontinent Independent System Operator, Inc. Docket No. ER17–1712, Midcontinent Independent System Operator, Inc. Docket No. ER17–215, Midcontinent Independent System Operator, Inc. Docket No. ER17–2220, Midcontinent Independent System Operator, Inc. Docket No. ER17–2323, Midcontinent Independent System Operator, Inc. Docket No. ER16–2225, Midcontinent Independent System Operator, Inc. Docket No. ER16–2355, Midcontinent Independent System Operator, Inc. Docket No. ER17–2552, Midcontinent Independent System Operator, Inc. Docket No. ER18–12, Midcontinent Independent System Operator, Inc. Docket No. ER18–23, Midcontinent Independent System Operator, Inc. Docket No. ER18–31, Midcontinent Independent System Operator, Inc. Docket No. ER18–39, Midcontinent Independent System Operator, Inc. Docket No. ER18–40, Midcontinent Independent System Operator, Inc. Docket No. ER18–41, Midcontinent Independent System Operator, Inc. Docket No. ER18–42, Midcontinent Independent System Operator, Inc. Docket No. ER18–44, Midcontinent Independent System Operator, Inc. Docket No. ER17–2097, Midcontinent Independent System Operator, Inc. Docket No. ER18–56, Midcontinent Independent System Operator, Inc. Docket No. EL18–7, Midcontinent Independent System Operator, Inc. Docket No. ER18–75, Midcontinent Independent System Operator, Inc. Docket No. ER18–149, Midcontinent Independent System Operator, Inc. Docket No. ER18–146, Midcontinent Independent System Operator, Inc. Docket No. ER18–136, Midcontinent Independent System Operator, Inc. Docket No. ER18–170, Midcontinent Independent System Operator, Inc. Docket No. ER18–193, Midcontinent Independent System Operator, Inc. Docket No. ER18–224, Midcontinent Independent System Operator, Inc. Docket No. ER17–721, Midcontinent Independent System Operator, Inc. These meetings are open to the public. E:\FR\FM\06DEN1.SGM 06DEN1 57598 Federal Register / Vol. 82, No. 233 / Wednesday, December 6, 2017 / Notices For more information, contact Christopher Miller, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (317) 249– 5936 or Christopher.miller@ferc.gov. system issues related to the privileged files of the application.4 If you need assistance with eLibrary, or any other FERC Online system, please contact: Dated: November 30, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. FERC Online Support Email: ferconlinesupport@ferc.gov. Telephone: 202–502–6652. Toll-free: 1–866–208–3676. Hours: 8:30 a.m. to 5 p.m. Eastern Time, Monday-Friday (closed Federal holidays). [FR Doc. 2017–26245 Filed 12–5–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Dated: November 30, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. Federal Energy Regulatory Commission [FR Doc. 2017–26243 Filed 12–5–17; 8:45 am] [CP17–494–000] BILLING CODE 6717–01–P Pacific Connector Gas Pipeline, LP; Notice of Correction to eLibrary System ENVIRONMENTAL PROTECTION AGENCY On September 21, 2017, Pacific Connector Gas Pipeline, LP (Pacific Connector) filed in Docket No. CP17– 494–000 an application to construct and operate a new interstate pipeline. On September 29, 2017, Commission staff filed a memo to the public record in this proceeding, explaining that the public files for the application were not viewable or accessible when users of the Commission’s eLibrary system queried through the General or Advanced Search options.1 However, the public files for the application would appear in the results if users queried through the Daily Search or Docket Search options.2 The memo provided a link to the public files in the proceeding.3 The Commission has resolved the issues with the eLibrary system as it relates to the public files for the application. The public files now appear using the General Search and Advanced Search options of eLibrary with the same Filed Date as the application. For technical reasons, certain files from the September 21 application were placed separately, and as new entries (with new accession numbers), into eLibrary to allow the General and Advanced Search options to properly return the files in search results; however, this is the exact same filing made by Pacific Connector on September 21, 2017. We are working to resolve similar eLibrary daltland on DSKBBV9HB2PROD with NOTICES 1 There are five options for searching files on eLibrary: General Search, Advanced Search, New Docket Search, Docket Search, and Daily Search. There is a hyperlink for each search option on the left side of the eLibrary page. 2 The Daily Search and Docket Search options continue to properly display the public files for the application. 3 https://elibrary.ferc.gov/idmws/File_list.asp? document_id=14604355. VerDate Sep<11>2014 18:07 Dec 05, 2017 Jkt 244001 [EPA–R09–OW–2017–0478; FRL–9969–70Region 9] Notice of Availability of Proposed National Pollutant Discharge Elimination System (NPDES) General Permit for Low Threat Discharges in Navajo Nation and NPDES General Permit for Bulk Fuel Storage Facilities in Guam. Environmental Protection Agency (EPA). ACTION: Notice of Availability of Proposed NPDES General Permits. AGENCY: EPA Region 9 is proposing to issue a general NPDES permit for discharges from facilities with discharges classified as low threat located in the Navajo Nation (Permit No. NNG990001) and a general NPDES permit for discharges from bulk fuel storage facilities located in Guam (Permit No. GUG000001). These are new proposed permits which will be issued upon completion of the notice and comment period and after due consideration has been given to all comments received. Use of a general permit in the two categories and locations described above allows EPA and dischargers to allocate resources in a more efficient manner, obtain timely permit coverage, and avoid issuing resource intensive individual permits to each facility, while simultaneously providing greater certainty and efficiency to the regulated community while ensuring consistent permit conditions for comparable facilities. SUMMARY: 4 The list of privileged files for the application can be found here: https://elibrary.ferc.gov/idmws/ File_list.asp?document_id=14604356. PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 This notice announces the availability of the proposed general permits and the corresponding fact sheets for public comment which can be found on Region 9’s Web site at: https://www.epa.gov/ region09/water/npdes/pubnotices.html. DATES: Comments on the proposed permits must be received or postmarked no later than February 5, 2018. ADDRESSES: Public comments on the proposed permits may be submitted by U.S. Mail to: Environmental Protection Agency, Region 9, Attn: Gary Sheth, NPDES Permits Section, Water Division (WTR–2–3), 75 Hawthorne Street, San Francisco, California 94105–3901, or by email to: sheth.gary@epa.gov. Please include the following Docket No. in the email subject line: EPA–R09–OW–2017–0478. FOR FURTHER INFORMATION CONTACT: Gary Sheth, EPA Region 9, NPDES Permits Section, Water Division (WTR–2–3), 75 Hawthorne Street, San Francisco, California 94105–3901, or telephone (415) 972–3516. A copy of the proposed permits and fact sheets will be provided upon request and are also available on Region 9’s Web site at: https:// www.epa.gov/region09/water/npdes/ pubnotices.html. Administrative record: The proposed permits and other related documents in the administrative record are on file and may be inspected any time between 8:30 a.m. and 4:00 p.m., Monday through Friday, excluding legal holidays, at the following address: U.S. EPA Region 9, NPDES Permits Section, Water Division (WTR–2–3), 75 Hawthorne Street, San Francisco, CA 94105–3901. SUPPLEMENTARY INFORMATION: A. Does this action apply to me? The proposed NPDES General Permit for Low Threat Discharge in Navajo Nation is intended to provide coverage to entities that discharge wastewater that is relatively pollutant free, below a specified volume, and/or for a limited time, within the Navajo Nation. The proposed NPDES General Permit for Bulk Fuel Storage Facilities in Guam replaces individual NPDES permits for five bulk fuel storage facilities and provides coverage for new eligible bulk fuel facilities in Guam. B. How can I submit comments? * Identify which General Permit included in this notice you are commenting on. * Include documentation to support your comments. * Submit comments by the deadline identified in this Federal Register notice. E:\FR\FM\06DEN1.SGM 06DEN1

Agencies

[Federal Register Volume 82, Number 233 (Wednesday, December 6, 2017)]
[Notices]
[Pages 57597-57598]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-26245]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Commission and Commission Staff Attendance at 
Midcontinent Independent System Operator, Inc. Meetings

    The Federal Energy Regulatory Commission hereby gives notice that 
members of the Commission and its staff may attend the following MISO-
related meetings: MISO Board of Directors Meeting, December 7, 2017, 
8:30 a.m.-11:00 a.m.
    Unless otherwise noted, all of the meetings above will be held at: 
MISO Headquarters, 720 City Center Drive, Carmel, IN 46032-7574.
    Further information and dial in instructions may be found at 
https://www.misoenergy.org. All meetings are Eastern Time.
    The discussions may address matters at issue in the following 
proceedings:
Docket No. ER16-1766, Midcontinent Independent System Operator, Inc.
Docket No. EL16-108, Tilton Energy v. Midcontinent Independent System 
Operator, Inc.
Docket No. ER16-2225, Midcontinent Independent System Operator, Inc.
Docket No. ER16-2355, Midcontinent Independent System Operator, Inc.
Docket No. ER17-215, Midcontinent Independent System Operator, Inc.
Docket No. ER12-1266, Midcontinent Independent System Operator, Inc.
Docket No. ER17-67, Midcontinent Independent System Operator, Inc.
Docket No. ER17-827, Midcontinent Independent System Operator, Inc.
Docket No. ER17-305, Midcontinent Independent System Operator, Inc.
Docket No. ER17-892, Midcontinent Independent System Operator, Inc.
Docket No. ER17-156, Midcontinent Independent System Operator, Inc.
Docket No. ER16-2534, Midcontinent Independent System Operator, Inc.
Docket No. ER17-1376, Midcontinent Independent System Operator, Inc.
Docket No. ER17-1570, Midcontinent Independent System Operator, Inc.
Docket No. ER17-1571, Midcontinent Independent System Operator, Inc.
Docket No. ER17-1712, Midcontinent Independent System Operator, Inc.
Docket No. ER17-1376, Midcontinent Independent System Operator, Inc.
Docket No. ER17-2097, Midcontinent Independent System Operator, Inc.
Docket No. ER17-2113, Midcontinent Independent System Operator, Inc.
Docket No. ER17-1712, Midcontinent Independent System Operator, Inc.
Docket No. ER17-215, Midcontinent Independent System Operator, Inc.
Docket No. ER17-2220, Midcontinent Independent System Operator, Inc.
Docket No. ER17-2323, Midcontinent Independent System Operator, Inc.
Docket No. ER16-2225, Midcontinent Independent System Operator, Inc.
Docket No. ER16-2355, Midcontinent Independent System Operator, Inc.
Docket No. ER17-2552, Midcontinent Independent System Operator, Inc.
Docket No. ER18-12, Midcontinent Independent System Operator, Inc.
Docket No. ER18-23, Midcontinent Independent System Operator, Inc.
Docket No. ER18-31, Midcontinent Independent System Operator, Inc.
Docket No. ER18-39, Midcontinent Independent System Operator, Inc.
Docket No. ER18-40, Midcontinent Independent System Operator, Inc.
Docket No. ER18-41, Midcontinent Independent System Operator, Inc.
Docket No. ER18-42, Midcontinent Independent System Operator, Inc.
Docket No. ER18-44, Midcontinent Independent System Operator, Inc.
Docket No. ER17-2097, Midcontinent Independent System Operator, Inc.
Docket No. ER18-56, Midcontinent Independent System Operator, Inc.
Docket No. EL18-7, Midcontinent Independent System Operator, Inc.
Docket No. ER18-75, Midcontinent Independent System Operator, Inc.
Docket No. ER18-149, Midcontinent Independent System Operator, Inc.
Docket No. ER18-146, Midcontinent Independent System Operator, Inc.
Docket No. ER18-136, Midcontinent Independent System Operator, Inc.
Docket No. ER18-170, Midcontinent Independent System Operator, Inc.
Docket No. ER18-193, Midcontinent Independent System Operator, Inc.
Docket No. ER18-224, Midcontinent Independent System Operator, Inc.
Docket No. ER17-721, Midcontinent Independent System Operator, Inc.

    These meetings are open to the public.

[[Page 57598]]

    For more information, contact Christopher Miller, Office of Energy 
Market Regulation, Federal Energy Regulatory Commission at (317) 249-
5936 or Christopher.miller@ferc.gov.

    Dated: November 30, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-26245 Filed 12-5-17; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.