Notice of Commission and Commission Staff Attendance at Midcontinent Independent System Operator, Inc. Meetings, 57597-57598 [2017-26245]
Download as PDF
Federal Register / Vol. 82, No. 233 / Wednesday, December 6, 2017 / Notices
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title PROTEST, MOTION TO
INTERVENE, COMMENTS, REPLY
COMMENTS, RECOMMENDATIONS,
PRELIMINARY TERMS AND
CONDITIONS, or PRELIMINARY
FISHWAY PRESCRIPTIONS; (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural Schedule:
The application will be processed
according to the following revised
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
daltland on DSKBBV9HB2PROD with NOTICES
Filing of recommendations,
preliminary terms and conditions, and preliminary
fishway prescriptions.
Commission issues Draft Environmental Statement
(EIS).
Comments on Draft EIS ........
Modified Terms and Conditions.
Commission Issues Final EIS
Target date
December
2017.
July 2018.
September
2018.
November
2018.
February
2019.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
VerDate Sep<11>2014
18:07 Dec 05, 2017
Jkt 244001
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: November 30, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–26246 Filed 12–5–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission and
Commission Staff Attendance at
Midcontinent Independent System
Operator, Inc. Meetings
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and its staff
may attend the following MISO-related
meetings: MISO Board of Directors
Meeting, December 7, 2017, 8:30 a.m.–
11:00 a.m.
Unless otherwise noted, all of the
meetings above will be held at: MISO
Headquarters, 720 City Center Drive,
Carmel, IN 46032–7574.
Further information and dial in
instructions may be found at https://
www.misoenergy.org. All meetings are
Eastern Time.
The discussions may address matters
at issue in the following proceedings:
Docket No. ER16–1766, Midcontinent
Independent System Operator, Inc.
Docket No. EL16–108, Tilton Energy v.
Midcontinent Independent System
Operator, Inc.
Docket No. ER16–2225, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–2355, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–215, Midcontinent
Independent System Operator, Inc.
Docket No. ER12–1266, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–67, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–827, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–305, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–892, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–156, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–2534, Midcontinent
Independent System Operator, Inc.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
57597
Docket No. ER17–1376, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–1570, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–1571, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–1712, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–1376, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–2097, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–2113, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–1712, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–215, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–2220, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–2323, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–2225, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–2355, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–2552, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–12, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–23, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–31, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–39, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–40, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–41, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–42, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–44, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–2097, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–56, Midcontinent
Independent System Operator, Inc.
Docket No. EL18–7, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–75, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–149, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–146, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–136, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–170, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–193, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–224, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–721, Midcontinent
Independent System Operator, Inc.
These meetings are open to the
public.
E:\FR\FM\06DEN1.SGM
06DEN1
57598
Federal Register / Vol. 82, No. 233 / Wednesday, December 6, 2017 / Notices
For more information, contact
Christopher Miller, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (317) 249–
5936 or Christopher.miller@ferc.gov.
system issues related to the privileged
files of the application.4
If you need assistance with eLibrary,
or any other FERC Online system,
please contact:
Dated: November 30, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
FERC Online Support
Email: ferconlinesupport@ferc.gov.
Telephone: 202–502–6652.
Toll-free: 1–866–208–3676.
Hours: 8:30 a.m. to 5 p.m. Eastern
Time, Monday-Friday (closed Federal
holidays).
[FR Doc. 2017–26245 Filed 12–5–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Dated: November 30, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2017–26243 Filed 12–5–17; 8:45 am]
[CP17–494–000]
BILLING CODE 6717–01–P
Pacific Connector Gas Pipeline, LP;
Notice of Correction to eLibrary
System
ENVIRONMENTAL PROTECTION
AGENCY
On September 21, 2017, Pacific
Connector Gas Pipeline, LP (Pacific
Connector) filed in Docket No. CP17–
494–000 an application to construct and
operate a new interstate pipeline. On
September 29, 2017, Commission staff
filed a memo to the public record in this
proceeding, explaining that the public
files for the application were not
viewable or accessible when users of the
Commission’s eLibrary system queried
through the General or Advanced
Search options.1 However, the public
files for the application would appear in
the results if users queried through the
Daily Search or Docket Search options.2
The memo provided a link to the public
files in the proceeding.3
The Commission has resolved the
issues with the eLibrary system as it
relates to the public files for the
application. The public files now appear
using the General Search and Advanced
Search options of eLibrary with the
same Filed Date as the application. For
technical reasons, certain files from the
September 21 application were placed
separately, and as new entries (with
new accession numbers), into eLibrary
to allow the General and Advanced
Search options to properly return the
files in search results; however, this is
the exact same filing made by Pacific
Connector on September 21, 2017. We
are working to resolve similar eLibrary
daltland on DSKBBV9HB2PROD with NOTICES
1 There
are five options for searching files on
eLibrary: General Search, Advanced Search, New
Docket Search, Docket Search, and Daily Search.
There is a hyperlink for each search option on the
left side of the eLibrary page.
2 The Daily Search and Docket Search options
continue to properly display the public files for the
application.
3 https://elibrary.ferc.gov/idmws/File_list.asp?
document_id=14604355.
VerDate Sep<11>2014
18:07 Dec 05, 2017
Jkt 244001
[EPA–R09–OW–2017–0478; FRL–9969–70Region 9]
Notice of Availability of Proposed
National Pollutant Discharge
Elimination System (NPDES) General
Permit for Low Threat Discharges in
Navajo Nation and NPDES General
Permit for Bulk Fuel Storage Facilities
in Guam.
Environmental Protection
Agency (EPA).
ACTION: Notice of Availability of
Proposed NPDES General Permits.
AGENCY:
EPA Region 9 is proposing to
issue a general NPDES permit for
discharges from facilities with
discharges classified as low threat
located in the Navajo Nation (Permit No.
NNG990001) and a general NPDES
permit for discharges from bulk fuel
storage facilities located in Guam
(Permit No. GUG000001). These are new
proposed permits which will be issued
upon completion of the notice and
comment period and after due
consideration has been given to all
comments received.
Use of a general permit in the two
categories and locations described above
allows EPA and dischargers to allocate
resources in a more efficient manner,
obtain timely permit coverage, and
avoid issuing resource intensive
individual permits to each facility,
while simultaneously providing greater
certainty and efficiency to the regulated
community while ensuring consistent
permit conditions for comparable
facilities.
SUMMARY:
4 The list of privileged files for the application
can be found here: https://elibrary.ferc.gov/idmws/
File_list.asp?document_id=14604356.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
This notice announces the availability
of the proposed general permits and the
corresponding fact sheets for public
comment which can be found on Region
9’s Web site at: https://www.epa.gov/
region09/water/npdes/pubnotices.html.
DATES: Comments on the proposed
permits must be received or postmarked
no later than February 5, 2018.
ADDRESSES: Public comments on the
proposed permits may be submitted by
U.S. Mail to: Environmental Protection
Agency, Region 9, Attn: Gary Sheth,
NPDES Permits Section, Water Division
(WTR–2–3), 75 Hawthorne Street, San
Francisco, California 94105–3901, or by
email to: sheth.gary@epa.gov. Please
include the following Docket No. in the
email subject line:
EPA–R09–OW–2017–0478.
FOR FURTHER INFORMATION CONTACT: Gary
Sheth, EPA Region 9, NPDES Permits
Section, Water Division (WTR–2–3), 75
Hawthorne Street, San Francisco,
California 94105–3901, or telephone
(415) 972–3516. A copy of the proposed
permits and fact sheets will be provided
upon request and are also available on
Region 9’s Web site at: https://
www.epa.gov/region09/water/npdes/
pubnotices.html.
Administrative record: The proposed
permits and other related documents in
the administrative record are on file and
may be inspected any time between 8:30
a.m. and 4:00 p.m., Monday through
Friday, excluding legal holidays, at the
following address: U.S. EPA Region 9,
NPDES Permits Section, Water Division
(WTR–2–3), 75 Hawthorne Street, San
Francisco, CA 94105–3901.
SUPPLEMENTARY INFORMATION:
A. Does this action apply to me?
The proposed NPDES General Permit
for Low Threat Discharge in Navajo
Nation is intended to provide coverage
to entities that discharge wastewater
that is relatively pollutant free, below a
specified volume, and/or for a limited
time, within the Navajo Nation. The
proposed NPDES General Permit for
Bulk Fuel Storage Facilities in Guam
replaces individual NPDES permits for
five bulk fuel storage facilities and
provides coverage for new eligible bulk
fuel facilities in Guam.
B. How can I submit comments?
* Identify which General Permit
included in this notice you are
commenting on.
* Include documentation to support
your comments.
* Submit comments by the deadline
identified in this Federal Register
notice.
E:\FR\FM\06DEN1.SGM
06DEN1
Agencies
[Federal Register Volume 82, Number 233 (Wednesday, December 6, 2017)]
[Notices]
[Pages 57597-57598]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-26245]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission and Commission Staff Attendance at
Midcontinent Independent System Operator, Inc. Meetings
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission and its staff may attend the following MISO-
related meetings: MISO Board of Directors Meeting, December 7, 2017,
8:30 a.m.-11:00 a.m.
Unless otherwise noted, all of the meetings above will be held at:
MISO Headquarters, 720 City Center Drive, Carmel, IN 46032-7574.
Further information and dial in instructions may be found at
https://www.misoenergy.org. All meetings are Eastern Time.
The discussions may address matters at issue in the following
proceedings:
Docket No. ER16-1766, Midcontinent Independent System Operator, Inc.
Docket No. EL16-108, Tilton Energy v. Midcontinent Independent System
Operator, Inc.
Docket No. ER16-2225, Midcontinent Independent System Operator, Inc.
Docket No. ER16-2355, Midcontinent Independent System Operator, Inc.
Docket No. ER17-215, Midcontinent Independent System Operator, Inc.
Docket No. ER12-1266, Midcontinent Independent System Operator, Inc.
Docket No. ER17-67, Midcontinent Independent System Operator, Inc.
Docket No. ER17-827, Midcontinent Independent System Operator, Inc.
Docket No. ER17-305, Midcontinent Independent System Operator, Inc.
Docket No. ER17-892, Midcontinent Independent System Operator, Inc.
Docket No. ER17-156, Midcontinent Independent System Operator, Inc.
Docket No. ER16-2534, Midcontinent Independent System Operator, Inc.
Docket No. ER17-1376, Midcontinent Independent System Operator, Inc.
Docket No. ER17-1570, Midcontinent Independent System Operator, Inc.
Docket No. ER17-1571, Midcontinent Independent System Operator, Inc.
Docket No. ER17-1712, Midcontinent Independent System Operator, Inc.
Docket No. ER17-1376, Midcontinent Independent System Operator, Inc.
Docket No. ER17-2097, Midcontinent Independent System Operator, Inc.
Docket No. ER17-2113, Midcontinent Independent System Operator, Inc.
Docket No. ER17-1712, Midcontinent Independent System Operator, Inc.
Docket No. ER17-215, Midcontinent Independent System Operator, Inc.
Docket No. ER17-2220, Midcontinent Independent System Operator, Inc.
Docket No. ER17-2323, Midcontinent Independent System Operator, Inc.
Docket No. ER16-2225, Midcontinent Independent System Operator, Inc.
Docket No. ER16-2355, Midcontinent Independent System Operator, Inc.
Docket No. ER17-2552, Midcontinent Independent System Operator, Inc.
Docket No. ER18-12, Midcontinent Independent System Operator, Inc.
Docket No. ER18-23, Midcontinent Independent System Operator, Inc.
Docket No. ER18-31, Midcontinent Independent System Operator, Inc.
Docket No. ER18-39, Midcontinent Independent System Operator, Inc.
Docket No. ER18-40, Midcontinent Independent System Operator, Inc.
Docket No. ER18-41, Midcontinent Independent System Operator, Inc.
Docket No. ER18-42, Midcontinent Independent System Operator, Inc.
Docket No. ER18-44, Midcontinent Independent System Operator, Inc.
Docket No. ER17-2097, Midcontinent Independent System Operator, Inc.
Docket No. ER18-56, Midcontinent Independent System Operator, Inc.
Docket No. EL18-7, Midcontinent Independent System Operator, Inc.
Docket No. ER18-75, Midcontinent Independent System Operator, Inc.
Docket No. ER18-149, Midcontinent Independent System Operator, Inc.
Docket No. ER18-146, Midcontinent Independent System Operator, Inc.
Docket No. ER18-136, Midcontinent Independent System Operator, Inc.
Docket No. ER18-170, Midcontinent Independent System Operator, Inc.
Docket No. ER18-193, Midcontinent Independent System Operator, Inc.
Docket No. ER18-224, Midcontinent Independent System Operator, Inc.
Docket No. ER17-721, Midcontinent Independent System Operator, Inc.
These meetings are open to the public.
[[Page 57598]]
For more information, contact Christopher Miller, Office of Energy
Market Regulation, Federal Energy Regulatory Commission at (317) 249-
5936 or Christopher.miller@ferc.gov.
Dated: November 30, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-26245 Filed 12-5-17; 8:45 am]
BILLING CODE 6717-01-P