Description: Operational Purchases
and Sales Report of UGI Mt. Bethel
Pipeline Company, LLC under RP18–
192.
Filed Date: 11/28/17.
Accession Number: 20171128–5093.
Comments Due: 5 p.m. ET 12/11/17.
Docket Numbers: RP18–193–000.
Applicants: UGI Sunbury, LLC.
Description: Operational Purchases
and Sales Report of UGI Sunbury, LLC
under RP18–193.
Filed Date: 11/28/17.
Accession Number: 20171128–5100.
Comments Due: 5 p.m. ET 12/11/17.
Docket Numbers: RP18–194–000.
Applicants: Northwest Pipeline LLC.
Description: Northwest Pipeline LLC
submits tariff filing per 154.204: 2017
Miscellaneous Filing to be effective 1/1/
2018.
Filed Date: 11/28/17.
Accession Number: 20171128–5134.
Comments Due: 5 p.m. ET 12/11/17.
Docket Numbers: RP18–195–000.
Applicants: Northwest Pipeline LLC.
Description: Northwest Pipeline LLC
submits tariff filing per 154.204:
Interconnect Facilities Credit Provisions
Filing to be effective 1/1/2018.
Filed Date: 11/28/17.
Accession Number: 20171128–5140.
Comments Due: 5 p.m. ET 12/11/17.
Docket Numbers: CP18–19–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: Authorization to
Abandon Service under CP18–19.
Filed Date: 11/15/17.
Accession Number: 20171115–5093.
Comments Due: 5 p.m. ET 12/6/17.
Docket Number: PR17–64–001.
Applicants: Boardwalk Texas
Intrastate, LLC.
Description: Tariff filing per
284.123(b), (e)+(g): Revised Petition for
Rate Approval to be effective 10/1/2017.
Filed Date: 11/27/17.
Accession Number: 201711275012.
Comments Due: 5 p.m. ET 12/18/17.
284.123(g) Protests Due: 5 p.m. ET 12/
18/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
VerDate Sep<11>2014
18:13 Dec 04, 2017
Jkt 244001
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 29, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–26133 Filed 12–4–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–26–000.
Applicants: Deseret Generation &
Transmission Co-operative, Inc.
Description: Application for
Expedited Approval of Acquisition of
Assets Pursuant to Section 203 of the
Federal Power Act of Deseret Generation
& Transmission Co-operative, Inc.
Filed Date: 11/28/17.
Accession Number: 20171128–5165.
Comments Due: 5 p.m. ET 12/19/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–2541–001.
Applicants: Estill Solar I, LLC.
Description: Notice of Non-Material
Change in Status of Estill Solar I, LLC.
Filed Date: 11/28/17.
Accession Number: 20171128–5151.
Comments Due: 5 p.m. ET 12/19/17.
Docket Numbers: ER18–15–001.
Applicants: Westwood Generation,
LLC.
Description: Compliance filing:
Response to FERC Deficiency Notice to
be effective N/A.
Filed Date: 11/28/17.
Accession Number: 20171128–5143.
Comments Due: 5 p.m. ET 12/19/17.
Docket Numbers: ER18–158–001.
Applicants: EnPowered.
Description: Tariff Amendment:
EnPowered USA, Inc. Market Based
Rate Tariff to be effective 10/31/2017.
Filed Date: 11/29/17.
Accession Number: 20171129–5097.
Comments Due: 5 p.m. ET 12/20/17.
Docket Numbers: ER18–336–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2017–11–28_4th Quarter Tariff CleanUp Filing to be effective 11/29/2017.
Filed Date: 11/28/17.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
57435
Accession Number: 20171128–5113.
Comments Due: 5 p.m. ET 12/19/17.
Docket Numbers: ER18–337–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: City
of Hurricane Requirements Contract to
be effective 12/1/2017.
Filed Date: 11/28/17.
Accession Number: 20171128–5114.
Comments Due: 5 p.m. ET 12/19/17.
Docket Numbers: ER18–339–000.
Applicants: Bishop Hill
Interconnection LLC.
Description: Compliance filing:
Bishop Hill Interconnection LLC
Certificate of Concurrence to be effective
10/15/2017.
Filed Date: 11/28/17.
Accession Number: 20171128–5132.
Comments Due: 5 p.m. ET 12/19/17.
Docket Numbers: ER18–340–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2017–11–29_SA 749 ATC–CWP IA
Termination to be effective 11/30/2017.
Filed Date: 11/29/17.
Accession Number: 20171129–5027.
Comments Due: 5 p.m. ET 12/20/17.
Docket Numbers: ER18–341–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
4743; Queue No. AC1–046 to be
effective 12/18/2017.
Filed Date: 11/29/17.
Accession Number: 20171129–5036.
Comments Due: 5 p.m. ET 12/20/17.
Docket Numbers: ER18–342–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
4744; Queue No. AC1–047 to be
effective 12/18/2017.
Filed Date: 11/29/17.
Accession Number: 20171129–5037.
Comments Due: 5 p.m. ET 12/20/17.
Docket Numbers: ER18–343–000.
Applicants: Citigroup Energy Inc.
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective
11/30/2017.
Filed Date: 11/29/17.
Accession Number: 20171129–5056.
Comments Due: 5 p.m. ET 12/20/17.
Docket Numbers: ER18–344–000.
Applicants: C.P. Crane LLC.
Description: Request for Waiver of
C.P. Crane LLC.
Filed Date: 11/29/17.
Accession Number: 20171129–5057.
Comments Due: 5 p.m. ET 12/20/17.
Docket Numbers: ER18–345–000.
Applicants: Citigroup Energy Canada
ULC.
E:\FR\FM\05DEN1.SGM
05DEN1
57436
Federal Register / Vol. 82, No. 232 / Tuesday, December 5, 2017 / Notices
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective
11/30/2017.
Filed Date: 11/29/17.
Accession Number: 20171129–5058.
Comments Due: 5 p.m. ET 12/20/17.
Docket Numbers: ER18–346–000.
Applicants: New England Power
Company.
Description: § 205(d) Rate Filing:
Related Facilities Agreement with
Granite Reliable Power, LLC to be
effective 11/1/2017.
Filed Date: 11/29/17.
Accession Number: 20171129–5085.
Comments Due: 5 p.m. ET 12/20/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 29, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–26132 Filed 12–4–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF17–10–000]
sradovich on DSK3GMQ082PROD with NOTICES
National Fuel Gas Supply Corporation;
Notice of Intent To Prepare an
Environmental Assessment for the
Planned FM100 Modernization Project
and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the FM100 Modernization Project
involving construction and operation of
facilities by National Fuel Gas Supply
Corporation (National Fuel) in Cameron,
Clearfield, Elk, McKean, and Potter
VerDate Sep<11>2014
18:13 Dec 04, 2017
Jkt 244001
Counties, Pennsylvania. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
You can make a difference by providing
us with your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. To ensure that your
comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before December
29, 2017.
If you sent comments on this project
to the Commission before the opening of
this docket on September 14, 2017, you
will need to file those comments in
Docket No. PF17–10–000 to ensure they
are considered as part of this
proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
planned facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC Web site (www.ferc.gov). This
fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings.
Public Participation
For your convenience, there are three
methods you can use to submit your
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
comments to the Commission. The
Commission encourages electronic filing
of comments and has expert staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on eRegister. If you are filing a
comment on a particular project, please
select ‘‘Comment on a Filing’’ as the
filing type; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (PF17–10–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Room 1A, Washington, DC 20426.
Summary of the Planned Project
National Fuel plans to abandon,
construct, and operate certain pipeline
and compressor facilities in order to
modernize its system to meet existing
delivery requirements. The FM100
Modernization Project would consist of
the following facilities and actions:
• Abandonment in place of
approximately 12 miles of 12-inchdiameter pipeline (Line FM120) in
Cameron and Elk Counties;
• abandonment in place of
approximately 44.9 miles of 12-inchdiameter pipeline (Line FM100) in
Clearfield, Cameron, Elk, and Potter
Counties;
• abandonment by removal of the
existing Costello Compressor Station in
Potter County;
• installation of 28.9 miles of new 12or 16-inch-diameter natural gas pipeline
in McKean and Potter Counties; 1
• installation of the new Marvindale
Compressor Station (up to 2,000
horsepower) in McKean County;
1 National Fuel is currently gauging interest from
shippers along this section of new pipeline. If
enough interest is received, National Fuel may
expand the pipeline diameter from 12 to 16 inches,
resulting in an increase in capacity on National
Fuel’s system, making the project an expansion
project.
E:\FR\FM\05DEN1.SGM
05DEN1
Agencies
[Federal Register Volume 82, Number 232 (Tuesday, December 5, 2017)]
[Notices]
[Pages 57435-57436]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-26132]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-26-000.
Applicants: Deseret Generation & Transmission Co-operative, Inc.
Description: Application for Expedited Approval of Acquisition of
Assets Pursuant to Section 203 of the Federal Power Act of Deseret
Generation & Transmission Co-operative, Inc.
Filed Date: 11/28/17.
Accession Number: 20171128-5165.
Comments Due: 5 p.m. ET 12/19/17.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-2541-001.
Applicants: Estill Solar I, LLC.
Description: Notice of Non-Material Change in Status of Estill
Solar I, LLC.
Filed Date: 11/28/17.
Accession Number: 20171128-5151.
Comments Due: 5 p.m. ET 12/19/17.
Docket Numbers: ER18-15-001.
Applicants: Westwood Generation, LLC.
Description: Compliance filing: Response to FERC Deficiency Notice
to be effective N/A.
Filed Date: 11/28/17.
Accession Number: 20171128-5143.
Comments Due: 5 p.m. ET 12/19/17.
Docket Numbers: ER18-158-001.
Applicants: EnPowered.
Description: Tariff Amendment: EnPowered USA, Inc. Market Based
Rate Tariff to be effective 10/31/2017.
Filed Date: 11/29/17.
Accession Number: 20171129-5097.
Comments Due: 5 p.m. ET 12/20/17.
Docket Numbers: ER18-336-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2017-11-28_4th Quarter
Tariff Clean-Up Filing to be effective 11/29/2017.
Filed Date: 11/28/17.
Accession Number: 20171128-5113.
Comments Due: 5 p.m. ET 12/19/17.
Docket Numbers: ER18-337-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: City of Hurricane
Requirements Contract to be effective 12/1/2017.
Filed Date: 11/28/17.
Accession Number: 20171128-5114.
Comments Due: 5 p.m. ET 12/19/17.
Docket Numbers: ER18-339-000.
Applicants: Bishop Hill Interconnection LLC.
Description: Compliance filing: Bishop Hill Interconnection LLC
Certificate of Concurrence to be effective 10/15/2017.
Filed Date: 11/28/17.
Accession Number: 20171128-5132.
Comments Due: 5 p.m. ET 12/19/17.
Docket Numbers: ER18-340-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2017-11-29_SA 749 ATC-CWP IA
Termination to be effective 11/30/2017.
Filed Date: 11/29/17.
Accession Number: 20171129-5027.
Comments Due: 5 p.m. ET 12/20/17.
Docket Numbers: ER18-341-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of WMPA SA
No. 4743; Queue No. AC1-046 to be effective 12/18/2017.
Filed Date: 11/29/17.
Accession Number: 20171129-5036.
Comments Due: 5 p.m. ET 12/20/17.
Docket Numbers: ER18-342-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of WMPA SA
No. 4744; Queue No. AC1-047 to be effective 12/18/2017.
Filed Date: 11/29/17.
Accession Number: 20171129-5037.
Comments Due: 5 p.m. ET 12/20/17.
Docket Numbers: ER18-343-000.
Applicants: Citigroup Energy Inc.
Description: Sec. 205(d) Rate Filing: Revised MBR Tariff to be
effective 11/30/2017.
Filed Date: 11/29/17.
Accession Number: 20171129-5056.
Comments Due: 5 p.m. ET 12/20/17.
Docket Numbers: ER18-344-000.
Applicants: C.P. Crane LLC.
Description: Request for Waiver of C.P. Crane LLC.
Filed Date: 11/29/17.
Accession Number: 20171129-5057.
Comments Due: 5 p.m. ET 12/20/17.
Docket Numbers: ER18-345-000.
Applicants: Citigroup Energy Canada ULC.
[[Page 57436]]
Description: Sec. 205(d) Rate Filing: Revised MBR Tariff to be
effective 11/30/2017.
Filed Date: 11/29/17.
Accession Number: 20171129-5058.
Comments Due: 5 p.m. ET 12/20/17.
Docket Numbers: ER18-346-000.
Applicants: New England Power Company.
Description: Sec. 205(d) Rate Filing: Related Facilities Agreement
with Granite Reliable Power, LLC to be effective 11/1/2017.
Filed Date: 11/29/17.
Accession Number: 20171129-5085.
Comments Due: 5 p.m. ET 12/20/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: November 29, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-26132 Filed 12-4-17; 8:45 am]
BILLING CODE 6717-01-P