Federal Register / Vol. 82, No. 231 / Monday, December 4, 2017 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7016–006]
sradovich on DSK3GMQ082PROD with NOTICES
City of Hailey, Idaho; Notice of
Application for Surrender of License,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Application for
surrender of exemption.
b. Project No.: 7016–006.
c. Date Filed: October 31, 2017.
d. Licensee: City of Hailey, Idaho.
e. Name of Project: Hailey
Hydroelectric Project.
f. Location: The project is located on
the artesian Indian Creek Springs, in
Blaine County, Idaho.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Licensee Contact: Ms. Mariel
Miller, Public Works Director, City of
Hailey, 115 Main Street South, Suite H,
Hailey, ID 83333, Telephone: (208) 788–
4221.
i. FERC Contact: Mr. Ashish Desai,
(202) 502–8370, Ashish.Desai@ferc.gov.
j. Deadline for filing comments,
interventions, and protests is 30 days
from the issuance date of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file motions to intervene, protests
and comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–7016–006.
k. Description of Project Facilities:
The project consists of the City of
Hailey’s groundwater collection and
power production facilities, including:
(1) A spring collection system,
comprising 10-inch-diameter infiltration
pipes and a collection box; (2) a 2.5mile-long, 12-inch-diameter penstock
connecting the collection system to the
powerhouse; (3) a 700-foot-long, 18-
VerDate Sep<11>2014
18:22 Dec 01, 2017
Jkt 244001
inch-diameter steel penstock, bifurcated
from the water main; (4) a powerhouse
containing one generating unit rated at
56 kilowatts; and (5) an 800-foot-long,
underground transmission line. The
City of Hailey sells project power to
Idaho Power.
l. Description of Request: On August
24, 2017, the Commission issued an
Order Ruling on Declaration of Intention
and Finding Licensing Not Required for
the project under docket number DI17–
6–000 finding that a license or
exemption for licensing is not required
to operate and maintain the project. As
a result, the exemptee, the City of
Hailey, Idaho, has determined it would
like to surrender the exemption. No
ground disturbance is associated with
the proposed surrender and project
features will remain in place.
m. This filing may be viewed on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction in the Commission’s
Public Reference Room located at 888
First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502–8371.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .212
and .214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
p. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title COMMENTS,
PROTEST, or MOTION TO INTERVENE
as applicable; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
57253
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the surrender
application that is the subject of this
notice. Agencies may obtain copies of
the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
q. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described proceeding.
If any agency does not file comments
within the time specified for filing
comments, it will be presumed to have
no comments.
Dated: November 28, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–26034 Filed 12–1–17; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2017–0409; FRL–9970–33]
Certain New Chemicals; Receipt and
Status Information for September 2017
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA is required under the
Toxic Substances Control Act (TSCA) to
publish in the Federal Register a notice
of receipt of a premanufacture notice
(PMN); an application for a test
marketing exemption (TME), both
pending and/or expired; and a periodic
status report on any new chemicals
under EPA review and the receipt of
notices of commencement (NOC) to
manufacture those chemicals. This
SUMMARY:
E:\FR\FM\04DEN1.SGM
04DEN1
Agencies
[Federal Register Volume 82, Number 231 (Monday, December 4, 2017)]
[Notices]
[Page 57253]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-26034]
[[Page 57253]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7016-006]
City of Hailey, Idaho; Notice of Application for Surrender of
License, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Proceeding: Application for surrender of exemption.
b. Project No.: 7016-006.
c. Date Filed: October 31, 2017.
d. Licensee: City of Hailey, Idaho.
e. Name of Project: Hailey Hydroelectric Project.
f. Location: The project is located on the artesian Indian Creek
Springs, in Blaine County, Idaho.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Licensee Contact: Ms. Mariel Miller, Public Works Director, City
of Hailey, 115 Main Street South, Suite H, Hailey, ID 83333, Telephone:
(208) 788-4221.
i. FERC Contact: Mr. Ashish Desai, (202) 502-8370,
Ashish.Desai@ferc.gov.
j. Deadline for filing comments, interventions, and protests is 30
days from the issuance date of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file motions
to intervene, protests and comments using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. The first page of any filing should
include docket number P-7016-006.
k. Description of Project Facilities: The project consists of the
City of Hailey's groundwater collection and power production
facilities, including: (1) A spring collection system, comprising 10-
inch-diameter infiltration pipes and a collection box; (2) a 2.5-mile-
long, 12-inch-diameter penstock connecting the collection system to the
powerhouse; (3) a 700-foot-long, 18-inch-diameter steel penstock,
bifurcated from the water main; (4) a powerhouse containing one
generating unit rated at 56 kilowatts; and (5) an 800-foot-long,
underground transmission line. The City of Hailey sells project power
to Idaho Power.
l. Description of Request: On August 24, 2017, the Commission
issued an Order Ruling on Declaration of Intention and Finding
Licensing Not Required for the project under docket number DI17-6-000
finding that a license or exemption for licensing is not required to
operate and maintain the project. As a result, the exemptee, the City
of Hailey, Idaho, has determined it would like to surrender the
exemption. No ground disturbance is associated with the proposed
surrender and project features will remain in place.
m. This filing may be viewed on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number
excluding the last three digits in the docket number field to access
the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction in the Commission's Public Reference Room located at 888
First Street NE., Room 2A, Washington, DC 20426, or by calling (202)
502-8371.
n. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
o. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.212 and .214. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
p. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO
INTERVENE as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions
to intervene, or protests must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). All comments,
motions to intervene, or protests should relate to the surrender
application that is the subject of this notice. Agencies may obtain
copies of the application directly from the applicant. A copy of any
protest or motion to intervene must be served upon each representative
of the applicant specified in the particular application. If an
intervener files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency. A copy of all other filings in reference to
this application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
q. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described proceeding. If any agency does not
file comments within the time specified for filing comments, it will be
presumed to have no comments.
Dated: November 28, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-26034 Filed 12-1-17; 8:45 am]
BILLING CODE 6717-01-P