Midship Pipeline Company, LLC; Notice of Schedule for Environmental Review of the Midcontinent Supply Header Interstate Pipeline Project, 57248-57249 [2017-26031]
Download as PDF
57248
Federal Register / Vol. 82, No. 231 / Monday, December 4, 2017 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–20–000]
sradovich on DSK3GMQ082PROD with NOTICES
Transcontinental Gas Pipe Line
Company, LLC; Notice of Request
Under Blanket Authorization
Take notice that on November 15,
2017, Transcontinental Gas Pipe Line
Company, LLC (Transco), P.O. Box
1396, Houston, Texas 77251, filed a
prior notice application pursuant to
sections 157.205, and 157.208 of the
Federal Energy Regulatory
Commission’s (Commission) regulations
under the Natural Gas Act (NGA), and
Transco’s blanket certificate issued in
Docket No. CP82–426–000. Transco
requests authorization to construct and
operate three new heaters and related
appurtenant facilities at the existing
Meadow Heater facility located in the
Borough of Ridgefield, Bergen County,
New Jersey, all as more fully set forth in
the application, which is open to the
public for inspection. The filing may
also be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Marg
Camardello, P.O. Box 1396, Houston,
Texas 77251 or by phone (713) 215–
3380.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
VerDate Sep<11>2014
18:22 Dec 01, 2017
Jkt 244001
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
Dated: November 27, 2017.
Kimberly D. Bose,
Secretary
[FR Doc. 2017–26001 Filed 12–1–17; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–458–000]
Midship Pipeline Company, LLC;
Notice of Schedule for Environmental
Review of the Midcontinent Supply
Header Interstate Pipeline Project
On May 31, 2017, Midship Pipeline
Company, LLC (Midship Pipeline) filed
an application with the Federal Energy
Regulatory Commission (FERC or
Commission) in Docket No. CP17–458–
000 requesting a Certificate of Public
Convenience and Necessity pursuant to
section 7(c) of the Natural Gas Act
(NGA) and part 157 of the Commission’s
regulations to construct, own, operate,
and maintain a new 233.6-mile-long
natural gas pipeline system and
associated facilities in Oklahoma. The
proposed project, known as the
Midcontinent Supply Header Interstate
Pipeline Project (MIDSHIP Project),
would provide 1,440 million standard
cubic feet per day of natural gas
transportation capacity from the
Anadarko Basin in Oklahoma to existing
natural gas pipelines near Bennington,
Oklahoma, for transport to growing Gulf
Coast and Southeast markets.
FERC issued its Notice of Application
for the MIDSHIP Project on June 14,
2017. Among other things, the notice
alerted other agencies issuing federal
authorizations of the requirement to
complete all necessary reviews and to
reach a final decision on the request for
a federal authorization within 90 days of
the date of issuance of the Commission
staff’s final environmental impact
statement (EIS) for the MIDSHIP Project.
This notice identifies the FERC staff’s
planned schedule for completion of the
final EIS for the MIDSHIP Project,
which is based on an issuance of the
draft EIS in February 2018.
Schedule for Environmental Review
Issuance of Notice of Availability of
the final EIS: June 21, 2018.
90-day Federal Authorization
Decision Deadline: September 19, 2018.
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the MIDSHIP
Project’s progress.
Background
On November 9, 2016, the
Commission staff granted Midship
Pipeline’s request to use FERC’s prefiling environmental review process and
assigned the MIDSHIP Project Docket
No. PF17–3–000. On January 27, 2017,
Frm 00054
Fmt 4703
Sfmt 4703
E:\FR\FM\04DEN1.SGM
04DEN1
Federal Register / Vol. 82, No. 231 / Monday, December 4, 2017 / Notices
the Commission issued a Notice of
Intent to Prepare an Environmental
Impact Statement for the Planned
Midcontinent Supply Header Interstate
Pipeline Project, Request for Comments
on Environmental Issues, and Notice of
Public Scoping Sessions. On March 22,
2017, the Commission issued a
Supplemental Notice to seek comments
on additional facilities identified by
Midship Pipeline as part of the
MIDSHIP Project. The notices were sent
to federal, state, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American Tribes;
affected property owners; other
interested parties; and local libraries
and newspapers. Major issues raised
include the potential for induced
seismicity; possible alternative routes;
and potential impacts on agricultural
lands, cattle grazing, threatened and
endangered species, surface water and
groundwater resources, air quality and
noise, and safety. The U.S.
Environmental Protection Agency is a
cooperating agency in the preparation of
the EIS.
sradovich on DSK3GMQ082PROD with NOTICES
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents via email. Go to
www.ferc.gov/docs-filing/
esubscription.asp.
Additional information about the
MIDSHIP Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the eLibrary
link, select General Search from the
eLibrary menu, enter the selected date
range and Docket Number excluding the
last three digits (i.e., CP17–458), and
follow the instructions. For assistance
with access to eLibrary, the helpline can
be reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
Web site also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
[FR Doc. 2017–26031 Filed 12–1–17; 8:45 am]
BILLING CODE 6717–01–P
18:22 Dec 01, 2017
Federal Energy Regulatory
Commission
[Docket Nos. CP17–40–000 and CP17–40–
001]
Spire STL Pipeline LLC; Supplemental
Notice of Availability of the
Environmental Assessment and
Reopening of Comment Period for the
Proposed Spire STL Pipeline Project
On September 29, 2017, the Federal
Energy Regulatory Commission (FERC
or Commission) issued in Docket Nos.
CP17–40–000 and CP17–40–001 a
Notice of Availability of the
Environmental Assessment for the
Proposed Spire STL Pipeline Project.
FERC has subsequently learned that
delivery of the CD version of the
Environmental Assessment (EA) was
delayed and as a result some
stakeholders did not receive a copy of
the EA until after the comment period
had closed. In recognition of the delay
in receipt, this supplemental notice
announces the opening of another
comment period.
A CD containing an electronic copy of
the EA was previously mailed to you.
Alternatively, the EA is available for
public viewing on the FERC’s Web site
(www.ferc.gov) using the eLibrary link
and searching for accession number
20170929–3022; the direct link is as
follows: https://elibrary.FERC.gov/
idmws/file_list.asp?accession_num=
20170929-3022.
The enclosure contains the original
notice of availability describing the
project and the methods you can use to
file your comments to the Commission.
To ensure that the Commission has the
opportunity to consider your comments
prior to making its decision on this
project, it is important that we receive
your comments in Washington, DC on
or before December 22, 2017.
Dated: November 22, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–25998 Filed 12–1–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Dated: November 28, 2017.
Kimberly D. Bose,
Secretary.
VerDate Sep<11>2014
DEPARTMENT OF ENERGY
Jkt 244001
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–23–000.
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
57249
Applicants: Dynegy Inc., Vistra
Energy Corp.
Description: Joint Application of
Dynegy Inc., et al. for Authorization for
Merger of Jurisdictional Assets and
Purchase of Securities under Sections
203(a)(1) and 203(a)(2) of the Federal
Power Act.
Filed Date: 11/22/17.
Accession Number: 20171122–5134.
Comments Due: 5 p.m. ET 1/22/17.
Docket Numbers: EC18–24–000.
Applicants: Innergex Renewable
Energy Inc.
Description: Application of Innergex
Renewable Energy Inc. for
Authorization of Acquisition under
Section 203(a)(2).
Filed Date: 11/24/17.
Accession Number: 20171124–5031.
Comments Due: 5 p.m. ET 12/15/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2331–068;
ER10–2319–058; ER10–2317–058;
ER13–1351–040; ER10–2330–065.
Applicants: J.P. Morgan Ventures
Energy Corporation, BE CA LLC, BE
Alabama LLC, Florida Power
Development LLC, Utility Contract
Funding, L.L.C.
Description: Notice of Non-Material
Change in Status of the J.P. Morgan
Sellers.
Filed Date: 11/27/17.
Accession Number: 20171127–5059.
Comments Due: 5 p.m. ET 12/18/17.
Docket Numbers: ER17–2087–001.
Applicants: Hog Creek Wind Project,
LLC.
Description: Notice of Non-Material
Change in Status of Hog Creek Wind
Project, LLC.
Filed Date: 11/27/17.
Accession Number: 20171127–5061.
Comments Due: 5 p.m. ET 12/18/17.
Docket Numbers: ER18–329–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: Six
Interconnection Service Agreements re:
Dayton Transfer to be effective
10/26/2017.
Filed Date: 11/27/17.
Accession Number: 20171127–5010.
Comments Due: 5 p.m. ET 12/18/17.
Docket Numbers: ER18–330–000.
Applicants: NSTAR Electric
Company.
Description: Tariff Cancellation:
Notice of Cancellation of Essential
Power Newington Design Engineering
Agreement to be effective 11/27/2017.
Filed Date: 11/27/17.
Accession Number: 20171127–5080.
Comments Due: 5 p.m. ET 12/18/17.
E:\FR\FM\04DEN1.SGM
04DEN1
Agencies
[Federal Register Volume 82, Number 231 (Monday, December 4, 2017)]
[Notices]
[Pages 57248-57249]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-26031]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-458-000]
Midship Pipeline Company, LLC; Notice of Schedule for
Environmental Review of the Midcontinent Supply Header Interstate
Pipeline Project
On May 31, 2017, Midship Pipeline Company, LLC (Midship Pipeline)
filed an application with the Federal Energy Regulatory Commission
(FERC or Commission) in Docket No. CP17-458-000 requesting a
Certificate of Public Convenience and Necessity pursuant to section
7(c) of the Natural Gas Act (NGA) and part 157 of the Commission's
regulations to construct, own, operate, and maintain a new 233.6-mile-
long natural gas pipeline system and associated facilities in Oklahoma.
The proposed project, known as the Midcontinent Supply Header
Interstate Pipeline Project (MIDSHIP Project), would provide 1,440
million standard cubic feet per day of natural gas transportation
capacity from the Anadarko Basin in Oklahoma to existing natural gas
pipelines near Bennington, Oklahoma, for transport to growing Gulf
Coast and Southeast markets.
FERC issued its Notice of Application for the MIDSHIP Project on
June 14, 2017. Among other things, the notice alerted other agencies
issuing federal authorizations of the requirement to complete all
necessary reviews and to reach a final decision on the request for a
federal authorization within 90 days of the date of issuance of the
Commission staff's final environmental impact statement (EIS) for the
MIDSHIP Project. This notice identifies the FERC staff's planned
schedule for completion of the final EIS for the MIDSHIP Project, which
is based on an issuance of the draft EIS in February 2018.
Schedule for Environmental Review
Issuance of Notice of Availability of the final EIS: June 21, 2018.
90-day Federal Authorization Decision Deadline: September 19, 2018.
If a schedule change becomes necessary, an additional notice will
be provided so that the relevant agencies are kept informed of the
MIDSHIP Project's progress.
Background
On November 9, 2016, the Commission staff granted Midship
Pipeline's request to use FERC's pre-filing environmental review
process and assigned the MIDSHIP Project Docket No. PF17-3-000. On
January 27, 2017,
[[Page 57249]]
the Commission issued a Notice of Intent to Prepare an Environmental
Impact Statement for the Planned Midcontinent Supply Header Interstate
Pipeline Project, Request for Comments on Environmental Issues, and
Notice of Public Scoping Sessions. On March 22, 2017, the Commission
issued a Supplemental Notice to seek comments on additional facilities
identified by Midship Pipeline as part of the MIDSHIP Project. The
notices were sent to federal, state, and local government
representatives and agencies; elected officials; environmental and
public interest groups; Native American Tribes; affected property
owners; other interested parties; and local libraries and newspapers.
Major issues raised include the potential for induced seismicity;
possible alternative routes; and potential impacts on agricultural
lands, cattle grazing, threatened and endangered species, surface water
and groundwater resources, air quality and noise, and safety. The U.S.
Environmental Protection Agency is a cooperating agency in the
preparation of the EIS.
Additional Information
In order to receive notification of the issuance of the EIS and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents via email. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the MIDSHIP Project is available from
the Commission's Office of External Affairs at (866) 208-FERC or on the
FERC Web site (www.ferc.gov). Using the eLibrary link, select General
Search from the eLibrary menu, enter the selected date range and Docket
Number excluding the last three digits (i.e., CP17-458), and follow the
instructions. For assistance with access to eLibrary, the helpline can
be reached at (866) 208-3676, TTY (202) 502-8659, or at
FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC Web site also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: November 28, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-26031 Filed 12-1-17; 8:45 am]