Spire STL Pipeline LLC; Supplemental Notice of Availability of the Environmental Assessment and Reopening of Comment Period for the Proposed Spire STL Pipeline Project, 57249 [2017-25998]
Download as PDF
Federal Register / Vol. 82, No. 231 / Monday, December 4, 2017 / Notices
the Commission issued a Notice of
Intent to Prepare an Environmental
Impact Statement for the Planned
Midcontinent Supply Header Interstate
Pipeline Project, Request for Comments
on Environmental Issues, and Notice of
Public Scoping Sessions. On March 22,
2017, the Commission issued a
Supplemental Notice to seek comments
on additional facilities identified by
Midship Pipeline as part of the
MIDSHIP Project. The notices were sent
to federal, state, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American Tribes;
affected property owners; other
interested parties; and local libraries
and newspapers. Major issues raised
include the potential for induced
seismicity; possible alternative routes;
and potential impacts on agricultural
lands, cattle grazing, threatened and
endangered species, surface water and
groundwater resources, air quality and
noise, and safety. The U.S.
Environmental Protection Agency is a
cooperating agency in the preparation of
the EIS.
sradovich on DSK3GMQ082PROD with NOTICES
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents via email. Go to
www.ferc.gov/docs-filing/
esubscription.asp.
Additional information about the
MIDSHIP Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the eLibrary
link, select General Search from the
eLibrary menu, enter the selected date
range and Docket Number excluding the
last three digits (i.e., CP17–458), and
follow the instructions. For assistance
with access to eLibrary, the helpline can
be reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
Web site also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
[FR Doc. 2017–26031 Filed 12–1–17; 8:45 am]
BILLING CODE 6717–01–P
18:22 Dec 01, 2017
Federal Energy Regulatory
Commission
[Docket Nos. CP17–40–000 and CP17–40–
001]
Spire STL Pipeline LLC; Supplemental
Notice of Availability of the
Environmental Assessment and
Reopening of Comment Period for the
Proposed Spire STL Pipeline Project
On September 29, 2017, the Federal
Energy Regulatory Commission (FERC
or Commission) issued in Docket Nos.
CP17–40–000 and CP17–40–001 a
Notice of Availability of the
Environmental Assessment for the
Proposed Spire STL Pipeline Project.
FERC has subsequently learned that
delivery of the CD version of the
Environmental Assessment (EA) was
delayed and as a result some
stakeholders did not receive a copy of
the EA until after the comment period
had closed. In recognition of the delay
in receipt, this supplemental notice
announces the opening of another
comment period.
A CD containing an electronic copy of
the EA was previously mailed to you.
Alternatively, the EA is available for
public viewing on the FERC’s Web site
(www.ferc.gov) using the eLibrary link
and searching for accession number
20170929–3022; the direct link is as
follows: https://elibrary.FERC.gov/
idmws/file_list.asp?accession_num=
20170929-3022.
The enclosure contains the original
notice of availability describing the
project and the methods you can use to
file your comments to the Commission.
To ensure that the Commission has the
opportunity to consider your comments
prior to making its decision on this
project, it is important that we receive
your comments in Washington, DC on
or before December 22, 2017.
Dated: November 22, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–25998 Filed 12–1–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Dated: November 28, 2017.
Kimberly D. Bose,
Secretary.
VerDate Sep<11>2014
DEPARTMENT OF ENERGY
Jkt 244001
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–23–000.
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
57249
Applicants: Dynegy Inc., Vistra
Energy Corp.
Description: Joint Application of
Dynegy Inc., et al. for Authorization for
Merger of Jurisdictional Assets and
Purchase of Securities under Sections
203(a)(1) and 203(a)(2) of the Federal
Power Act.
Filed Date: 11/22/17.
Accession Number: 20171122–5134.
Comments Due: 5 p.m. ET 1/22/17.
Docket Numbers: EC18–24–000.
Applicants: Innergex Renewable
Energy Inc.
Description: Application of Innergex
Renewable Energy Inc. for
Authorization of Acquisition under
Section 203(a)(2).
Filed Date: 11/24/17.
Accession Number: 20171124–5031.
Comments Due: 5 p.m. ET 12/15/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2331–068;
ER10–2319–058; ER10–2317–058;
ER13–1351–040; ER10–2330–065.
Applicants: J.P. Morgan Ventures
Energy Corporation, BE CA LLC, BE
Alabama LLC, Florida Power
Development LLC, Utility Contract
Funding, L.L.C.
Description: Notice of Non-Material
Change in Status of the J.P. Morgan
Sellers.
Filed Date: 11/27/17.
Accession Number: 20171127–5059.
Comments Due: 5 p.m. ET 12/18/17.
Docket Numbers: ER17–2087–001.
Applicants: Hog Creek Wind Project,
LLC.
Description: Notice of Non-Material
Change in Status of Hog Creek Wind
Project, LLC.
Filed Date: 11/27/17.
Accession Number: 20171127–5061.
Comments Due: 5 p.m. ET 12/18/17.
Docket Numbers: ER18–329–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: Six
Interconnection Service Agreements re:
Dayton Transfer to be effective
10/26/2017.
Filed Date: 11/27/17.
Accession Number: 20171127–5010.
Comments Due: 5 p.m. ET 12/18/17.
Docket Numbers: ER18–330–000.
Applicants: NSTAR Electric
Company.
Description: Tariff Cancellation:
Notice of Cancellation of Essential
Power Newington Design Engineering
Agreement to be effective 11/27/2017.
Filed Date: 11/27/17.
Accession Number: 20171127–5080.
Comments Due: 5 p.m. ET 12/18/17.
E:\FR\FM\04DEN1.SGM
04DEN1
Agencies
[Federal Register Volume 82, Number 231 (Monday, December 4, 2017)]
[Notices]
[Page 57249]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-25998]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP17-40-000 and CP17-40-001]
Spire STL Pipeline LLC; Supplemental Notice of Availability of
the Environmental Assessment and Reopening of Comment Period for the
Proposed Spire STL Pipeline Project
On September 29, 2017, the Federal Energy Regulatory Commission
(FERC or Commission) issued in Docket Nos. CP17-40-000 and CP17-40-001
a Notice of Availability of the Environmental Assessment for the
Proposed Spire STL Pipeline Project. FERC has subsequently learned that
delivery of the CD version of the Environmental Assessment (EA) was
delayed and as a result some stakeholders did not receive a copy of the
EA until after the comment period had closed. In recognition of the
delay in receipt, this supplemental notice announces the opening of
another comment period.
A CD containing an electronic copy of the EA was previously mailed
to you. Alternatively, the EA is available for public viewing on the
FERC's Web site (www.ferc.gov) using the eLibrary link and searching
for accession number 20170929-3022; the direct link is as follows:
https://elibrary.FERC.gov/idmws/file_list.asp?accession_num=20170929-3022.
The enclosure contains the original notice of availability
describing the project and the methods you can use to file your
comments to the Commission. To ensure that the Commission has the
opportunity to consider your comments prior to making its decision on
this project, it is important that we receive your comments in
Washington, DC on or before December 22, 2017.
Dated: November 22, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-25998 Filed 12-1-17; 8:45 am]