Combined Notice of Filings #1, 57249-57250 [2017-25997]

Download as PDF Federal Register / Vol. 82, No. 231 / Monday, December 4, 2017 / Notices the Commission issued a Notice of Intent to Prepare an Environmental Impact Statement for the Planned Midcontinent Supply Header Interstate Pipeline Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Sessions. On March 22, 2017, the Commission issued a Supplemental Notice to seek comments on additional facilities identified by Midship Pipeline as part of the MIDSHIP Project. The notices were sent to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; affected property owners; other interested parties; and local libraries and newspapers. Major issues raised include the potential for induced seismicity; possible alternative routes; and potential impacts on agricultural lands, cattle grazing, threatened and endangered species, surface water and groundwater resources, air quality and noise, and safety. The U.S. Environmental Protection Agency is a cooperating agency in the preparation of the EIS. sradovich on DSK3GMQ082PROD with NOTICES Additional Information In order to receive notification of the issuance of the EIS and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents via email. Go to www.ferc.gov/docs-filing/ esubscription.asp. Additional information about the MIDSHIP Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC Web site (www.ferc.gov). Using the eLibrary link, select General Search from the eLibrary menu, enter the selected date range and Docket Number excluding the last three digits (i.e., CP17–458), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ ferc.gov. The eLibrary link on the FERC Web site also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. [FR Doc. 2017–26031 Filed 12–1–17; 8:45 am] BILLING CODE 6717–01–P 18:22 Dec 01, 2017 Federal Energy Regulatory Commission [Docket Nos. CP17–40–000 and CP17–40– 001] Spire STL Pipeline LLC; Supplemental Notice of Availability of the Environmental Assessment and Reopening of Comment Period for the Proposed Spire STL Pipeline Project On September 29, 2017, the Federal Energy Regulatory Commission (FERC or Commission) issued in Docket Nos. CP17–40–000 and CP17–40–001 a Notice of Availability of the Environmental Assessment for the Proposed Spire STL Pipeline Project. FERC has subsequently learned that delivery of the CD version of the Environmental Assessment (EA) was delayed and as a result some stakeholders did not receive a copy of the EA until after the comment period had closed. In recognition of the delay in receipt, this supplemental notice announces the opening of another comment period. A CD containing an electronic copy of the EA was previously mailed to you. Alternatively, the EA is available for public viewing on the FERC’s Web site (www.ferc.gov) using the eLibrary link and searching for accession number 20170929–3022; the direct link is as follows: https://elibrary.FERC.gov/ idmws/file_list.asp?accession_num= 20170929-3022. The enclosure contains the original notice of availability describing the project and the methods you can use to file your comments to the Commission. To ensure that the Commission has the opportunity to consider your comments prior to making its decision on this project, it is important that we receive your comments in Washington, DC on or before December 22, 2017. Dated: November 22, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–25998 Filed 12–1–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Dated: November 28, 2017. Kimberly D. Bose, Secretary. VerDate Sep<11>2014 DEPARTMENT OF ENERGY Jkt 244001 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC18–23–000. PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 57249 Applicants: Dynegy Inc., Vistra Energy Corp. Description: Joint Application of Dynegy Inc., et al. for Authorization for Merger of Jurisdictional Assets and Purchase of Securities under Sections 203(a)(1) and 203(a)(2) of the Federal Power Act. Filed Date: 11/22/17. Accession Number: 20171122–5134. Comments Due: 5 p.m. ET 1/22/17. Docket Numbers: EC18–24–000. Applicants: Innergex Renewable Energy Inc. Description: Application of Innergex Renewable Energy Inc. for Authorization of Acquisition under Section 203(a)(2). Filed Date: 11/24/17. Accession Number: 20171124–5031. Comments Due: 5 p.m. ET 12/15/17. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2331–068; ER10–2319–058; ER10–2317–058; ER13–1351–040; ER10–2330–065. Applicants: J.P. Morgan Ventures Energy Corporation, BE CA LLC, BE Alabama LLC, Florida Power Development LLC, Utility Contract Funding, L.L.C. Description: Notice of Non-Material Change in Status of the J.P. Morgan Sellers. Filed Date: 11/27/17. Accession Number: 20171127–5059. Comments Due: 5 p.m. ET 12/18/17. Docket Numbers: ER17–2087–001. Applicants: Hog Creek Wind Project, LLC. Description: Notice of Non-Material Change in Status of Hog Creek Wind Project, LLC. Filed Date: 11/27/17. Accession Number: 20171127–5061. Comments Due: 5 p.m. ET 12/18/17. Docket Numbers: ER18–329–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Six Interconnection Service Agreements re: Dayton Transfer to be effective 10/26/2017. Filed Date: 11/27/17. Accession Number: 20171127–5010. Comments Due: 5 p.m. ET 12/18/17. Docket Numbers: ER18–330–000. Applicants: NSTAR Electric Company. Description: Tariff Cancellation: Notice of Cancellation of Essential Power Newington Design Engineering Agreement to be effective 11/27/2017. Filed Date: 11/27/17. Accession Number: 20171127–5080. Comments Due: 5 p.m. ET 12/18/17. E:\FR\FM\04DEN1.SGM 04DEN1 57250 Federal Register / Vol. 82, No. 231 / Monday, December 4, 2017 / Notices The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 27, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–25997 Filed 12–1–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 10822–013] sradovich on DSK3GMQ082PROD with NOTICES Town of Canton, Connecticut; Notice of Application for License Reinstatement, Amendment, Transfer, Extension of License Term, and Soliciting Comments, Motions To Intervene, Protests, Recommendations, Terms and Conditions, and Fishway Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Reinstatement, Amendment, and Transfer. b. Project No.: 10822–013. c. Date filed: October 12, 2017. d. Applicant: Town of Canton, Connecticut. e. Name of Project: Upper Collinsville Project. f. Location: On the Farmington River near the village of Collinsville in Hartford County, Connecticut. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r) and Public Law 113–122. h. Applicant Contact: Robert Skinner, Chief Administrative Officer, Town of Canton, Connecticut, P.O. Box 168, 4 Market Street, Collinsville, CT, (860) 693–7837 or rskinner@ townofcantonct.org. VerDate Sep<11>2014 18:22 Dec 01, 2017 Jkt 244001 i. FERC Contact: Diana Shannon, (202) 502–6136 or diana.shannon@ ferc.gov. j. Deadline for filing motions to intervene and protests, comments, recommendations, terms and conditions, and fishway prescriptions is 60 days from the issuance date of this notice by the Commission; reply comments are due 105 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file any motion to intervene, protest, comments, and/or recommendations using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–10822–013. k. Description of Request: On October 12, 2017, the Town of Canton, Connecticut, filed a request to reinstate, amend, and transfer the license for the Upper Collinsville Project No. 10822. The project was previously licensed to Summit Hydropower, but the license was terminated by Commission order dated December 4, 2007, for failure to start construction pursuant to Article 301 of the license and section 13 of the Federal Power Act. By Public Law 113– 122, dated June 30, 2014, Congress approved the Collinsville Renewable Energy Production Act, which at the request of the Town of Canton, and after reasonable notice, allows the Commission to: (1) Reinstate the license; (2) extend for two years after the date on which the license is reinstated the time period during which the licensee is required to commence construction of the project; and (3) allows the license to be transferred to the town of Canton. The Town of Canton proposes to rehabilitate the project, provide upstream and downstream fish and eel passage, and provide additional environmental measures, including water quality monitoring, mussel relocation, and recreation. The Town requests the Commission to reinstate the license with a new term of 40–50 years. l. Locations of the Application: A copy of the application is available for PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the addresses in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource E:\FR\FM\04DEN1.SGM 04DEN1

Agencies

[Federal Register Volume 82, Number 231 (Monday, December 4, 2017)]
[Notices]
[Pages 57249-57250]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-25997]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC18-23-000.
    Applicants: Dynegy Inc., Vistra Energy Corp.
    Description: Joint Application of Dynegy Inc., et al. for 
Authorization for Merger of Jurisdictional Assets and Purchase of 
Securities under Sections 203(a)(1) and 203(a)(2) of the Federal Power 
Act.
    Filed Date: 11/22/17.
    Accession Number: 20171122-5134.
    Comments Due: 5 p.m. ET 1/22/17.

    Docket Numbers: EC18-24-000.
    Applicants: Innergex Renewable Energy Inc.
    Description: Application of Innergex Renewable Energy Inc. for 
Authorization of Acquisition under Section 203(a)(2).
    Filed Date: 11/24/17.
    Accession Number: 20171124-5031.
    Comments Due: 5 p.m. ET 12/15/17.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2331-068; ER10-2319-058; ER10-2317-058; ER13-
1351-040; ER10-2330-065.
    Applicants: J.P. Morgan Ventures Energy Corporation, BE CA LLC, BE 
Alabama LLC, Florida Power Development LLC, Utility Contract Funding, 
L.L.C.
    Description: Notice of Non-Material Change in Status of the J.P. 
Morgan Sellers.
    Filed Date: 11/27/17.
    Accession Number: 20171127-5059.
    Comments Due: 5 p.m. ET 12/18/17.

    Docket Numbers: ER17-2087-001.
    Applicants: Hog Creek Wind Project, LLC.
    Description: Notice of Non-Material Change in Status of Hog Creek 
Wind Project, LLC.
    Filed Date: 11/27/17.
    Accession Number: 20171127-5061.
    Comments Due: 5 p.m. ET 12/18/17.

    Docket Numbers: ER18-329-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Six Interconnection Service 
Agreements re: Dayton Transfer to be effective 10/26/2017.
    Filed Date: 11/27/17.
    Accession Number: 20171127-5010.
    Comments Due: 5 p.m. ET 12/18/17.

    Docket Numbers: ER18-330-000.
    Applicants: NSTAR Electric Company.
    Description: Tariff Cancellation: Notice of Cancellation of 
Essential Power Newington Design Engineering Agreement to be effective 
11/27/2017.
    Filed Date: 11/27/17.
    Accession Number: 20171127-5080.
    Comments Due: 5 p.m. ET 12/18/17.


[[Page 57250]]


    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: November 27, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-25997 Filed 12-1-17; 8:45 am]
BILLING CODE 6717-01-P