City Water and Light Plant of the City of Jonesboro; Notice of Filing, 56596 [2017-25758]
Download as PDF
pmangrum on DSK3GDR082PROD with NOTICES1
56596
Federal Register / Vol. 82, No. 228 / Wednesday, November 29, 2017 / Notices
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title PROTEST, MOTION TO
INTERVENE, COMMENTS, REPLY
COMMENTS, RECOMMENDATIONS,
TERMS AND CONDITIONS, or
PRESCRIPTIONS; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
VerDate Sep<11>2014
15:19 Nov 28, 2017
Jkt 241001
evidence of waiver of water quality
certification.
Dated: November 21, 2017.
Kimberly D. Bose,
Secretary.
Dated: November 22, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–25758 Filed 11–28–17; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2017–25725 Filed 11–28–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. CP18–14–000]
Blue Mountain Midstream LLC; Notice
of Application
[Docket No. EL18–36–000]
City Water and Light Plant of the City
of Jonesboro; Notice of Filing
Take notice that on November 21,
2017, City Water and Light Plant of the
City of Jonesboro submitted a proposed
revenue requirement under Schedule 2
of the Midcontinent Independent
Transmission System Operator Tariff.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on December 12, 2017.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
Take notice that on November 9,
2017, Blue Mountain Midstream LLC
(Blue Mountain), 14701 Hertz Quail
Springs Pkwy, Oklahoma City,
Oklahoma 73134, filed in Docket No.
CP18–14–000 an application under
section 7(c) of the Natural Gas Act
(NGA) and Part 157 of the Commission’s
regulations, seeking a certificate of
limited jurisdiction for the Blue
Mountain Delivery Line located in
Grady County, Oklahoma, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. Blue Mountain
also requests a blanket certificate under
Subpart F of Part 157 of the
Commission’s regulations. Blue
Mountain further requests waivers of
certain Commission regulatory
requirements as set forth in the
application.
Questions regarding this application
should be directed to William F.
Demarest, Jr., Husch Blackwell LLP, 750
17th Street NW., Suite 900, Washington,
DC 20006, or by telephone at (202) 378–
2310, or by email at william.demarest@
huschblackwell.com.
This filing is available for review at
the Commission’s Washington, DC
offices, or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the e-Library link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, or call toll-free at (866) 208–
3676, or for TTY, contact (202) 502–
8659.
Blue Mountain seeks authority to
construct, own and operate the Blue
Mountain Delivery Line downstream
from the Chisolm Trail Plant which will
entail the construction of two natural
gas pipelines totaling 9.57 miles and a
metering and pigging facility. The two
natural gas pipelines would be
constructed in two stages. The first stage
would be a 20-inch diameter steel
pipeline approximately 4.35 miles in
E:\FR\FM\29NON1.SGM
29NON1
Agencies
[Federal Register Volume 82, Number 228 (Wednesday, November 29, 2017)]
[Notices]
[Page 56596]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-25758]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL18-36-000]
City Water and Light Plant of the City of Jonesboro; Notice of
Filing
Take notice that on November 21, 2017, City Water and Light Plant
of the City of Jonesboro submitted a proposed revenue requirement under
Schedule 2 of the Midcontinent Independent Transmission System Operator
Tariff.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
eLibrary link and is available for review in the Commission's Public
Reference Room in Washington, DC. There is an eSubscription link on the
Web site that enables subscribers to receive email notification when a
document is added to a subscribed docket(s). For assistance with any
FERC Online service, please email FERCOnlineSupport@ferc.gov, or call
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on December 12, 2017.
Dated: November 22, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-25758 Filed 11-28-17; 8:45 am]
BILLING CODE 6717-01-P