City Water and Light Plant of the City of Jonesboro; Notice of Filing, 56596 [2017-25758]

Download as PDF pmangrum on DSK3GDR082PROD with NOTICES1 56596 Federal Register / Vol. 82, No. 228 / Wednesday, November 29, 2017 / Notices https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. n. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must (1) bear in all capital letters the title PROTEST, MOTION TO INTERVENE, COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, TERMS AND CONDITIONS, or PRESCRIPTIONS; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) VerDate Sep<11>2014 15:19 Nov 28, 2017 Jkt 241001 evidence of waiver of water quality certification. Dated: November 21, 2017. Kimberly D. Bose, Secretary. Dated: November 22, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–25758 Filed 11–28–17; 8:45 am] BILLING CODE 6717–01–P [FR Doc. 2017–25725 Filed 11–28–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. CP18–14–000] Blue Mountain Midstream LLC; Notice of Application [Docket No. EL18–36–000] City Water and Light Plant of the City of Jonesboro; Notice of Filing Take notice that on November 21, 2017, City Water and Light Plant of the City of Jonesboro submitted a proposed revenue requirement under Schedule 2 of the Midcontinent Independent Transmission System Operator Tariff. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on December 12, 2017. PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 Take notice that on November 9, 2017, Blue Mountain Midstream LLC (Blue Mountain), 14701 Hertz Quail Springs Pkwy, Oklahoma City, Oklahoma 73134, filed in Docket No. CP18–14–000 an application under section 7(c) of the Natural Gas Act (NGA) and Part 157 of the Commission’s regulations, seeking a certificate of limited jurisdiction for the Blue Mountain Delivery Line located in Grady County, Oklahoma, all as more fully set forth in the application which is on file with the Commission and open to public inspection. Blue Mountain also requests a blanket certificate under Subpart F of Part 157 of the Commission’s regulations. Blue Mountain further requests waivers of certain Commission regulatory requirements as set forth in the application. Questions regarding this application should be directed to William F. Demarest, Jr., Husch Blackwell LLP, 750 17th Street NW., Suite 900, Washington, DC 20006, or by telephone at (202) 378– 2310, or by email at william.demarest@ huschblackwell.com. This filing is available for review at the Commission’s Washington, DC offices, or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the e-Library link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, or call toll-free at (866) 208– 3676, or for TTY, contact (202) 502– 8659. Blue Mountain seeks authority to construct, own and operate the Blue Mountain Delivery Line downstream from the Chisolm Trail Plant which will entail the construction of two natural gas pipelines totaling 9.57 miles and a metering and pigging facility. The two natural gas pipelines would be constructed in two stages. The first stage would be a 20-inch diameter steel pipeline approximately 4.35 miles in E:\FR\FM\29NON1.SGM 29NON1

Agencies

[Federal Register Volume 82, Number 228 (Wednesday, November 29, 2017)]
[Notices]
[Page 56596]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-25758]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL18-36-000]


City Water and Light Plant of the City of Jonesboro; Notice of 
Filing

    Take notice that on November 21, 2017, City Water and Light Plant 
of the City of Jonesboro submitted a proposed revenue requirement under 
Schedule 2 of the Midcontinent Independent Transmission System Operator 
Tariff.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
eLibrary link and is available for review in the Commission's Public 
Reference Room in Washington, DC. There is an eSubscription link on the 
Web site that enables subscribers to receive email notification when a 
document is added to a subscribed docket(s). For assistance with any 
FERC Online service, please email FERCOnlineSupport@ferc.gov, or call 
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on December 12, 2017.

    Dated: November 22, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-25758 Filed 11-28-17; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.