Aquenergy Systems, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 55601-55602 [2017-25318]
Download as PDF
Federal Register / Vol. 82, No. 224 / Wednesday, November 22, 2017 / Notices
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–25319 Filed 11–21–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2428–007]
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Aquenergy Systems, LLC; Notice of
Application Ready for Environmental
Analysis and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
License.
b. Project No.: 2428–007.
c. Date filed: December 30, 2015.
d. Applicant: Aquenergy Systems,
LLC (Aquenergy).
e. Name of Project: Piedmont
Hydroelectric Project.
f. Location: The existing project is
located on the Saluda River in the Town
of Piedmont, in Anderson and
Greenville Counties, South Carolina.
The project does not affect federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)—825(r).
h. Applicant Contact: Beth E. Harris,
P.E., Regional Operations Manager, Enel
Green Power North America, Inc., 11
Anderson Street, Piedmont, SC 29673;
Telephone—(864) 846–0042; Email—
beth.harris@enel.com, OR Kevin Webb,
Hydro Licensing Manager, Enel Green
VerDate Sep<11>2014
18:57 Nov 21, 2017
Jkt 244001
Power North America, Inc., One Tech
Drive, Suite 220, Andover, MA 01810;
Telephone—(978) 681–1900; Email—
kevin.webb@enel.com.
i. FERC Contact: Navreet Deo, (202)
502–6304, or navreet.deo@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2428–007.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is now ready for environmental
analysis.
l. The Piedmont Project consists of:
(1) A 600-foot-long by 25-foot-high stone
masonry dam, consisting of (i) a 200foot-long non-overflow section, (ii) a
200-foot-long central overflow spillway
topped with 16-inch-high wooden
flashboards, and (iii) a 200-foot-long
non-overflow spillway housing the
inoperable J.P. Stevens Canal intake; (2)
a 22-acre impoundment at a normal
pool elevation of 774 feet mean sea
level; (3) a 140-foot-long by 81-foot-wide
intake canal consisting of eight gates at
the head of the canal controlling flow to
the powerhouse; (4) a 52-foot-long by
52-foot-wide brick masonry powerhouse
protected by a trashrack structure with
2-inch clear bar spacing, located 120
feet downstream of the dam, containing
one vertical Francis turbine generating
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
55601
unit that totals 1,000 kilowatt (kW); (5)
a 180-foot-long by 38-foot-wide tailrace;
(6) a 263-foot-long, 600-volt
transmission line connecting the
powerhouse to the non-project
substation; and (7) appurtenant
facilities.
Aquenergy operates the project in a
run-of-river mode using automatic pond
level control, with no useable storage or
flood control capacity. A continuous
minimum flow of 15 cubic feet per
second (cfs) or inflow, whichever is less,
is released into the bypassed area. The
minimum flow is achieved via an 8-footwide by 1-foot-deep weir on the
spillway crest. The project operates
under an estimated average head of 26
feet, including the 16-inch-high
spillway flashboards. The impoundment
water surface elevation is maintained at
774 feet. River flows between 159 cfs
and 535 cfs are used for power
generation, while flows in excess of 535
cfs are passed over the flashboards and
spillway. The total installed capacity of
the project is 1,000 kW from the single
generating unit. The project generates
approximately 5,369 megawatt-hours
annually, which are sold to a local
utility.
Aquenergy proposes to continue to
operate and maintain the Piedmont
Project as is required in the existing
license, and to develop canoe portage
facilities.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room, or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must: (1) Bear in all capital
letters the title COMMENTS, REPLY
COMMENTS, RECOMMENDATIONS,
TERMS AND CONDITIONS, or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
E:\FR\FM\22NON1.SGM
22NON1
55602
Federal Register / Vol. 82, No. 224 / Wednesday, November 22, 2017 / Notices
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: November 16, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–25318 Filed 11–21–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1585–010;
ER10–1594–010; ER16–733–001; ER10–
1617–010; ER16–1148–001; ER12–60–
012; ER10–1632–012; ER10–1626–007;
ER10–1628–010.
Applicants: Alabama Electric
Marketing, LLC, California Electric
Marketing, LLC, LQA, LLC, New Mexico
Electric Marketing, LLC, Tenaska
´
Energıa de Mexico, S. de R. L. d,
Tenaska Power Management, LLC,
Tenaska Power Services Co., Tenaska
Virginia Partners, L.P., Texas Electric
Marketing, LLC.
Description: Supplement to June 28,
2016 Updated Market Power Analysis of
the Tenaska Northeast MBR Sellers.
Filed Date: 11/16/17.
Accession Number: 20171116–5099.
Comments Due: 5 p.m. ET 12/7/17.
Docket Numbers: ER18–295–001.
Applicants: Louisville Gas and
Electric Company.
Description: Tariff Amendment:
Refiling EKPC NITSA Under Correct
Record ID to be effective 10/16/2017.
Filed Date: 11/16/17.
Accession Number: 20171116–5059.
Comments Due: 5 p.m. ET 12/7/17.
Docket Numbers: ER18–302–000.
Applicants: Tampa Electric Company.
VerDate Sep<11>2014
18:57 Nov 21, 2017
Jkt 244001
Description: § 205(d) Rate Filing:
Section 205 Requirements Depreciation
Rates—Polk 2 Buildout to be effective
2/1/2017.
Filed Date: 11/16/17.
Accession Number: 20171116–5060.
Comments Due: 5 p.m. ET 12/7/17.
Docket Numbers: ER18–303–000.
Applicants: South Jersey Energy ISO2,
LLC.
Description: Tariff Cancellation:
Cancel market-based rate tariff to be
effective 11/17/2017.
Filed Date: 11/16/17.
Accession Number: 20171116–5061.
Comments Due: 5 p.m. ET 12/7/17.
Docket Numbers: ER18–304–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
LGIA Sienna Solar Farm Project SA No.
199 to be effective 11/17/2017.
Filed Date: 11/16/17.
Accession Number: 20171116–5063.
Comments Due: 5 p.m. ET 12/7/17.
Docket Numbers: ER18–305–000.
Applicants: Bishop Hill Energy LLC.
Description: § 205(d) Rate Filing:
Revised Rate Schedule to be effective
10/15/2017.
Filed Date: 11/16/17.
Accession Number: 20171116–5109.
Comments Due: 5 p.m. ET 12/7/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 16, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–25325 Filed 11–21–17; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–3297–011.
Applicants: Powerex Corp. .
Description: Notice of Change in
Status and Request for Confidential
Treatment of Powerex Corp.
Filed Date: 11/15/17.
Accession Number: 20171115–5236.
Comments Due: 5 p.m. ET 12/6/17.
Docket Numbers: ER11–3417–013;
ER11–2292–019; ER11–3942–018;
ER11–2293–019; ER10–2917–018;
ER11–2294–017; ER12–2447–017;
ER13–1613–011 ER10–2918–019; ER10–
2920–018; ER11–3941–016; ER10–2921–
018; ER10–2922–018; ER13–1346–009;
ER10–2966–018; ER11–2383–013;
ER10–3178–010; ER12–161–018; ER12–
2068–014; ER12–645–019; ER10–2460–
014; ER10–2461–015; ER12–682–015;
ER10–2463–014; ER11–2201–018;
ER13–1139–017; ER13–17–012; ER14–
25–014; ER14–2630–010; ER12–1311–
014; ER10–2466–015; ER11–4029–014;
ER10–2895–018; ER14–1964–009;
ER16–287–004; ER13–2143–011; ER10–
3167–010; ER13–203–010; ER17–482–
003.
Applicants: Alta Wind VIII, LLC, Bear
Swamp Power Company LLC, BIF II
Safe Harbor Holdings, LLC, BIF III
Holtwood LLC, Black Bear Development
Holdings, LLC, Black Bear Hydro
Partners, LLC, Black Bear SO, LLC,
BREG Aggregator LLC, Brookfield
Energy Marketing Inc., Brookfield
Energy Marketing LP, Brookfield Energy
Marketing US LLC, Brookfield Power
Piney & Deep Creek LLC, Brookfield
Renewable Energy Marketing US LLC,
Brookfield Smoky Mountain
Hydropower LLC, Brookfield White
Pine Hydro LLC, Carr Street Generating
Station, L.P., Erie Boulevard
Hydropower, L.P., Granite Reliable
Power, LLC, Great Lakes Hydro
America, LLC, Hawks Nest Hydro LLC,
Mesa Wind Power Corporation,
Rumford Falls Hydro LLC, Safe Harbor
Water Power Corporation, Windstar
Energy, LLC, Bishop Hill Energy LLC,
Blue Sky East, LLC, California Ridge
Wind Energy LLC, Canandaigua Power
Partners, LLC, Canandaigua Power
Partners II, LLC, Erie Wind, LLC,
Evergreen Wind Power, LLC, Evergreen
Wind Power III, LLC, Imperial Valley
Solar 1, LLC, Niagara Wind Power, LLC,
Prairie Breeze Wind Energy LLC,
Regulus Solar, LLC, Stetson Holdings,
E:\FR\FM\22NON1.SGM
22NON1
Agencies
[Federal Register Volume 82, Number 224 (Wednesday, November 22, 2017)]
[Notices]
[Pages 55601-55602]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-25318]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2428-007]
Aquenergy Systems, LLC; Notice of Application Ready for
Environmental Analysis and Soliciting Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent License.
b. Project No.: 2428-007.
c. Date filed: December 30, 2015.
d. Applicant: Aquenergy Systems, LLC (Aquenergy).
e. Name of Project: Piedmont Hydroelectric Project.
f. Location: The existing project is located on the Saluda River in
the Town of Piedmont, in Anderson and Greenville Counties, South
Carolina. The project does not affect federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)--825(r).
h. Applicant Contact: Beth E. Harris, P.E., Regional Operations
Manager, Enel Green Power North America, Inc., 11 Anderson Street,
Piedmont, SC 29673; Telephone--(864) 846-0042; Email_
beth.harris@enel.com, OR Kevin Webb, Hydro Licensing Manager, Enel
Green Power North America, Inc., One Tech Drive, Suite 220, Andover, MA
01810; Telephone--(978) 681-1900; Email_kevin.webb@enel.com.
i. FERC Contact: Navreet Deo, (202) 502-6304, or
navreet.deo@ferc.gov.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-2428-007.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted and is now ready for
environmental analysis.
l. The Piedmont Project consists of: (1) A 600-foot-long by 25-
foot-high stone masonry dam, consisting of (i) a 200-foot-long non-
overflow section, (ii) a 200-foot-long central overflow spillway topped
with 16-inch-high wooden flashboards, and (iii) a 200-foot-long non-
overflow spillway housing the inoperable J.P. Stevens Canal intake; (2)
a 22-acre impoundment at a normal pool elevation of 774 feet mean sea
level; (3) a 140-foot-long by 81-foot-wide intake canal consisting of
eight gates at the head of the canal controlling flow to the
powerhouse; (4) a 52-foot-long by 52-foot-wide brick masonry powerhouse
protected by a trashrack structure with 2-inch clear bar spacing,
located 120 feet downstream of the dam, containing one vertical Francis
turbine generating unit that totals 1,000 kilowatt (kW); (5) a 180-
foot-long by 38-foot-wide tailrace; (6) a 263-foot-long, 600-volt
transmission line connecting the powerhouse to the non-project
substation; and (7) appurtenant facilities.
Aquenergy operates the project in a run-of-river mode using
automatic pond level control, with no useable storage or flood control
capacity. A continuous minimum flow of 15 cubic feet per second (cfs)
or inflow, whichever is less, is released into the bypassed area. The
minimum flow is achieved via an 8-foot-wide by 1-foot-deep weir on the
spillway crest. The project operates under an estimated average head of
26 feet, including the 16-inch-high spillway flashboards. The
impoundment water surface elevation is maintained at 774 feet. River
flows between 159 cfs and 535 cfs are used for power generation, while
flows in excess of 535 cfs are passed over the flashboards and
spillway. The total installed capacity of the project is 1,000 kW from
the single generating unit. The project generates approximately 5,369
megawatt-hours annually, which are sold to a local utility.
Aquenergy proposes to continue to operate and maintain the Piedmont
Project as is required in the existing license, and to develop canoe
portage facilities.
m. A copy of the application is available for review at the
Commission in the Public Reference Room, or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
All filings must: (1) Bear in all capital letters the title
COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, TERMS AND CONDITIONS, or
``PRESCRIPTIONS;'' (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person submitting the filing; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments,
recommendations, terms and conditions or prescriptions must set forth
their evidentiary basis and otherwise comply with the requirements of
18 CFR 4.34(b). Agencies may obtain copies of the application directly
from the applicant. Each filing must be accompanied by proof of service
on all persons listed on
[[Page 55602]]
the service list prepared by the Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and 385.2010.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
Dated: November 16, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-25318 Filed 11-21-17; 8:45 am]
BILLING CODE 6717-01-P