South Carolina Electric & Gas Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 52719 [2017-24584]

Download as PDF Federal Register / Vol. 82, No. 218 / Tuesday, November 14, 2017 / Notices Filed Date: 11/7/17. Accession Number: 20171107–5150. Comments Due: 5 p.m. ET 11/28/17. Docket Numbers: ER18–260–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to SA Nos. 1570, 2510 and 2534 re: Dayton transfer to AES Ohio to be effective 5/17/2010. Filed Date: 11/7/17. Accession Number: 20171107–5179. Comments Due: 5 p.m. ET 11/28/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 7, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–24580 Filed 11–13–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1894–208] ethrower on DSK3G9T082PROD with NOTICES South Carolina Electric & Gas Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Amendment of license to change project boundary. b. Project No: 1894–208. c. Date Filed: July 10, 2017. d. Applicant: South Carolina Electric & Gas Company. e. Name of Project: Parr Shoals Hydroelectric Project. f. Location: The affected project land is located on the Broad River in Fairfield County, South Carolina. VerDate Sep<11>2014 16:27 Nov 13, 2017 Jkt 244001 g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: William Argentieri, South Carolina Electric & Gas Company, 220 Operation Way, MC A221, Cayce, SC 29033–3701, (803) 217–9162. i. FERC Contact: Hillary Berlin, (202) 502–8915, hillary.berlin@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: December 7, 2017. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–1894–208. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: South Carolina Electric & Gas Company (licensee) filed an application to remove 8.12 acres of land on the western side of Monticello Reservoir from the project boundary. This parcel is located away from the shoreline on Ladd Road, and has been leased to Fairfield County to construct a community center. The licensee states that the land is not needed for any project purpose. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at PO 00000 Frm 00010 Fmt 4703 Sfmt 9990 52719 https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: November 7, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–24584 Filed 11–13–17; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\14NON1.SGM 14NON1

Agencies

[Federal Register Volume 82, Number 218 (Tuesday, November 14, 2017)]
[Notices]
[Page 52719]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-24584]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1894-208]


South Carolina Electric & Gas Company; Notice of Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Amendment of license to change project 
boundary.
    b. Project No: 1894-208.
    c. Date Filed: July 10, 2017.
    d. Applicant: South Carolina Electric & Gas Company.
    e. Name of Project: Parr Shoals Hydroelectric Project.
    f. Location: The affected project land is located on the Broad 
River in Fairfield County, South Carolina.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: William Argentieri, South Carolina Electric & 
Gas Company, 220 Operation Way, MC A221, Cayce, SC 29033-3701, (803) 
217-9162.
    i. FERC Contact: Hillary Berlin, (202) 502-8915, 
hillary.berlin@ferc.gov.
    j. Deadline for filing comments, motions to intervene, and 
protests: December 7, 2017.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE., Washington, DC 20426. The first page of any 
filing should include docket number P-1894-208. Comments emailed to 
Commission staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: South Carolina Electric & Gas Company 
(licensee) filed an application to remove 8.12 acres of land on the 
western side of Monticello Reservoir from the project boundary. This 
parcel is located away from the shoreline on Ladd Road, and has been 
leased to Fairfield County to construct a community center. The 
licensee states that the land is not needed for any project purpose.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the eLibrary 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above. Agencies may obtain copies of the application directly from 
the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as 
applicable; (2) set forth in the heading the name of the applicant and 
the project number of the application to which the filing responds; (3) 
furnish the name, address, and telephone number of the person 
commenting, protesting or intervening; and (4) otherwise comply with 
the requirements of 18 CFR 385.2001 through 385.2005. All comments, 
motions to intervene, or protests must set forth their evidentiary 
basis. Any filing made by an intervenor must be accompanied by proof of 
service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 385.2010.

    Dated: November 7, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-24584 Filed 11-13-17; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.