Notice of Availability; Florida Trustee Implementation Group Deepwater Horizon, 51858-51860 [2017-24197]
Download as PDF
51858
Federal Register / Vol. 82, No. 215 / Wednesday, November 8, 2017 / Notices
reviewing and making
recommendations for changes, when
needed, on all Federal programs, and/or
regulations, to ensure support of
hunting as: (a) An enhancement to
foreign wildlife conservation and
survival, and (b) an effective tool to
combat illegal trafficking and poaching;
recommending strategies to benefit the
U.S. Fish and Wildlife Service’s permit
office in receiving timely country data
and information so as to remove barriers
that impact consulting with range states;
recommending removal of barriers to
the importation into the United States of
legally hunted wildlife; ongoing review
of import suspension/bans and
providing recommendations that seek to
resume the legal trade of those items,
where appropriate; reviewing seizure
and forfeiture actions/practices, and
providing recommendations for
regulations that will lead to a reduction
of unwarranted actions; reviewing the
Endangered Species Act’s foreign listed
species and interaction with the
Convention on International Trade in
Endangered Species of Wild Flora and
Fauna, with the goal of eliminating
regulatory duplications; and
recommending methods for
streamlining/expediting the process of
import permits.
The Council will meet approximately
two times per year. The Secretary will
appoint members and their alternates to
the Council to serve up to a 3-year term.
The Council will not exceed 18
discretionary members and 4 ex officio
members.
Ex officio members will include:
• Secretary of the Interior or
designated DOI representatives; and
• Secretary of State or designated
Department of State representatives.
The remaining members will be
selected from among, but not limited to,
the entities listed below. These
members must be senior-level
representatives of their organizations
and/or have the ability to represent their
designated constituency.
• Wildlife and habitat conservation/
management organizations;
• U.S. hunters actively engaged in
international and/or domestic hunting
conservation;
• The firearms or ammunition
manufacturing industry;
• Archery and/or hunting sports
industry; and
• Tourism, outfitter, and/or guide
industries related to international
hunting.
Nominations should include a resume
providing an adequate description of the
nominee’s qualifications, including
information that would enable DOI to
make an informed decision regarding
meeting the membership requirements
of the Council and to permit DOI to
contact a potential member.
Members of the Council serve without
compensation. However, while away
from their homes or regular places of
business, Council and subcommittee
members engaged in Council or
subcommittee business that the DFO
approves may be allowed travel
expenses, including per diem in lieu of
subsistence, as authorized by 5 U.S.C.
5703, in the same manner as persons
employed intermittently in Federal
Government service.
Public Disclosure of Comments:
Before including your address, phone
number, email address, or other
personal identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you can ask us in your comment
to withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Certification Statement: I hereby
certify that the International Wildlife
Conservation Council is necessary and
is in the public interest in connection
with the performance of duties imposed
on the Department of the Interior 43
U.S.C. 1457, under the provisions of the
Fish and Wildlife Act of 1956 (16 U.S.C.
742a–742j), and other Acts applicable to
specific bureaus.
Authority: 5 U.S.C. Appendix 2.
Dated: November 3, 2017.
Ryan K. Zinke,
Secretary, Department of the Interior.
[FR Doc. 2017–24328 Filed 11–7–17; 8:45 am]
BILLING CODE 4333–15–P
DEPARTMENT OF THE INTERIOR
[FWS–R4–ES–2017–N156;
FVHC98220410150–XXX–FF04G01000]
Notice of Availability; Florida Trustee
Implementation Group Deepwater
Horizon Oil Spill Draft Phase V.2
Restoration Plan and Supplemental
Environmental Assessment; Florida
Coastal Access Project
Interior.
ACTION: Notice of availability; request
for comments.
AGENCY:
In accordance with the Oil
Pollution Act of 1990, the National
Environmental Policy Act, the
Deepwater Horizon Oil Spill Final
Programmatic Damage Assessment and
Restoration Plan and Final
Programmatic Environmental Impact
Statement (Final PDARP/PEIS), and the
resulting Consent Decree, the Federal
and State natural resource trustee
agencies for the Florida Trustee
Implementation Group (Florida TIG)
have prepared a Draft Phase V.2
Restoration Plan and Supplemental
Environmental Assessment (Draft Phase
V.2 RP/SEA). The Draft Phase V.2 RP/
SEA supplements the 2016 Final Phase
V Early Restoration Plan and
Environmental Assessment (Final Phase
V ERP/EA) and describes and proposes
the second phase of the Florida Coastal
Access Project intended to continue the
process of restoring natural resources
and services injured or lost as a result
of the Deepwater Horizon oil spill,
which occurred on or about April 20,
2010, in the Gulf of Mexico.
DATES: The Florida TIG will consider
public comments received on or before
December 8, 2017.
Public Meeting: The Florida TIG has
scheduled a public meeting to facilitate
public review and comment on the Draft
Phase V.2 RP/SEA. Both written and
verbal comments will be taken at the
public meeting. The Florida TIG will
hold an open house followed by a
public meeting. The public meeting will
include a presentation of the Draft Phase
V.2 RP/SEA. The public meeting
schedule is as follows:
SUMMARY:
Time
Location
November 16, 2017 .............
ethrower on DSK3G9T082PROD with NOTICES
Date
5:30 to 6:30 p.m.: Open house—6:30 to 8:00 p.m.:
Public meeting (presentations and discussion).
Robert M. Moore Administration Building, 1000 Cecil G.
Costin Sr. Blvd., Port St. Joe, FL 32456.
Obtaining Documents: You
may download the Draft Phase V.2 RP/
SEA at any of the following sites:
ADDRESSES:
VerDate Sep<11>2014
17:26 Nov 07, 2017
Jkt 244001
• https://
www.gulfspillrestoration.noaa.gov.
• https://www.doi.gov/
deepwaterhorizon.
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
• https://dep.state.fl.us/
deepwaterhorizon/default.htm.
Alternatively, you may request a CD
of the Draft Phase V.2 RP/SEA (see FOR
E:\FR\FM\08NON1.SGM
08NON1
Federal Register / Vol. 82, No. 215 / Wednesday, November 8, 2017 / Notices
FURTHER INFORMATION CONTACT). You
may also view the document at any of
the public facilities listed at https://
www.gulfspillrestoration.noaa.gov.
Submitting Comments: You may
submit comments on the Draft Phase V.2
RP/SEA by one of following methods:
• Via the Web: https://
www.gulfspillrestoration.noaa.gov.
• Via U.S. Mail: U.S. Fish and
Wildlife Service, P.O. Box 49567,
Atlanta, GA 30345.
In order to be considered, mailed
comments must be postmarked on or
before the comment deadline given in
the DATES section of this notice.
• In Person: Written and oral
comments may be submitted at the
public meeting on November 16, 2017
(see Public Availability of Comments
below).
FOR FURTHER INFORMATION CONTACT:
Nanciann Regalado, at 404–679–4161,
or email nanciann_regalado@fws.gov.
SUPPLEMENTARY INFORMATION:
ethrower on DSK3G9T082PROD with NOTICES
Introduction
On or about April 20, 2010, the
mobile offshore drilling unit Deepwater
Horizon, which was being used to drill
a well for BP Exploration and
Production, Inc. (BP), in the Macondo
prospect (Mississippi Canyon 252–
MC252), experienced a significant
explosion, fire, and subsequent sinking
in the Gulf of Mexico, resulting in an
unprecedented volume of oil and other
discharges from the rig and from the
wellhead on the seabed. The Deepwater
Horizon oil spill is the largest off shore
oil spill in U.S. history, discharging
millions of barrels of oil over a period
of 87 days. In addition, well over 1
million gallons of dispersants were
applied to the waters of the spill area in
an attempt to disperse the spilled oil.
An undetermined amount of natural gas
was also released into the environment
as a result of the spill.
The Trustees conducted the natural
resource damage assessment (NRDA) for
the Deepwater Horizon oil spill under
OPA. Pursuant to OPA (OPA; 33 U.S.C.
2701 et seq.), Federal and State agencies
act as trustees on behalf of the public to
assess natural resource injuries and
losses and to determine the actions
required to compensate the public for
those injuries and losses. OPA further
instructs the designated trustees to
develop and implement a plan for the
restoration, rehabilitation, replacement,
or acquisition of the equivalent of the
injured natural resources under their
trusteeship, including the loss of use
and services from those resources from
the time of injury until the time of
restoration to baseline (the resource
VerDate Sep<11>2014
17:26 Nov 07, 2017
Jkt 244001
quality and conditions that would exist
if the spill had not occurred) is
complete.
The Deepwater Horizon Trustees are:
• U.S. Department of the Interior
(DOI), as represented by the National
Park Service, U.S. Fish and Wildlife
Service, and Bureau of Land
Management;
• National Oceanic and Atmospheric
Administration (NOAA), on behalf of
the U.S. Department of Commerce;
• U.S. Department of Agriculture
(USDA);
• U.S. Environmental Protection
Agency (EPA);
• State of Louisiana Coastal
Protection and Restoration Authority,
Oil Spill Coordinator’s Office,
Department of Environmental Quality,
Department of Wildlife and Fisheries,
and Department of Natural Resources;
• State of Mississippi Department of
Environmental Quality;
• State of Alabama Department of
Conservation and Natural Resources and
Geological Survey of Alabama;
• State of Florida Department of
Environmental Protection and Fish and
Wildlife Conservation Commission; and
• State of Texas: Texas Parks and
Wildlife Department, Texas General
Land Office, and Texas Commission on
Environmental Quality.
Upon completion of the NRDA, the
Trustees reached and finalized a
settlement of their natural resource
damage claims with BP in an April 4,
2016, Consent Decree approved by the
United States District Court for the
Eastern District of Louisiana. Pursuant
to that Consent Decree, restoration
projects in the Florida Restoration Area
are now chosen and managed by the
Florida TIG. The Florida TIG is
composed of the following six Trustees:
State of Florida Department of
Environmental Protection and Fish and
Wildlife Conservation Commission;
DOI; NOAA; EPA; and USDA.
Background
In the 2011 Framework Agreement for
Early Restoration Addressing Injuries
Resulting from the Deepwater Horizon
Oil Spill (Framework Agreement), BP
agreed to provide to the Trustees up to
$1 billion toward early restoration
projects in the Gulf of Mexico to address
injuries to natural resources caused by
the Deepwater Horizon oil spill. The
Framework Agreement represented a
preliminary step toward the restoration
of injured natural resources and was
intended to expedite the start of
restoration in the Gulf in advance of the
completion of the injury assessment
process. Early restoration was not
intended to and did not fully address all
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
51859
injuries caused by the Deepwater
Horizon oil spill.
In the five phases of the early
restoration process, the Trustees
selected, and BP agreed to fund, a total
of 65 early restoration projects expected
to cost a total of approximately $877
million. The Trustees selected these
projects after public notice, public
meetings, and consideration of public
comments, through the Phase I Early
Restoration Plan/Environmental
Assessment (Phase I ERP/EA), Phase II
Early Restoration Plan/Environmental
Review (Phase II ERP/ER), Phase III
ERP/PEIS, Phase IV Early Restoration
Plan/Environment Assessments (Phase
IV ERP/EA), and Phase V ERP/EA.
These plans are available at: https://
www.doi.gov/deepwaterhorizon.
The April 4, 2016, Consent Decree
terminated and replaced the Framework
Agreement and provided that the
Trustees shall use remaining early
restoration funds as specified in the
early restoration plans and in
accordance with the Consent Decree.
The Trustees have determined that
decisions concerning any unexpended
early restoration funds are to be made
by the appropriate Trustee
Implementation Group for that project.
Overview of the Draft Phase V.2 RP/
SEA
In the Final Phase V ERP/EA, the
Deepwater Horizon State and Federal
natural resource trustees (Trustees)
evaluated and selected the first phase of
the Florida Coastal Access Project. The
Final Phase V ERP/EA provided that the
Florida Coastal Access Project would
proceed in phases, and that these future
phases would consist of similar
restoration activities to be identified and
selected by the Trustees in the same
manner and using the same criteria as
described in the Final Phase V ERP/EA,
in accordance with OPA, NEPA, and
other applicable laws, and after public
review of the proposed activities.
The proposed second phase of the
Florida Coastal Access Project is
consistent with the early restoration
program alternatives selected in the
Final Phase III Early Restoration Plan/
Programmatic Environmental Impact
Statement (Final Phase III ERP/PEIS)
and the Final PDARP/PEIS. The purpose
of this notice is to inform the public of
the availability of the Draft Phase V.2
RP/SEA and to seek public comments
on the proposed second phase of the
Florida Coastal Access Project and
supporting analysis.
The Draft Phase V.2 RP/SEA is being
released in accordance with OPA,
NRDA regulations found in the Code of
Federal Regulations (CFR) at 15 CFR
E:\FR\FM\08NON1.SGM
08NON1
51860
Federal Register / Vol. 82, No. 215 / Wednesday, November 8, 2017 / Notices
part 990, NEPA, the Consent Decree, the
Final PDARP/PEIS, the Phase III ERP/
PEIS and the Phase V ERP/EA.
The Florida TIG is considering the
second phase of the Florida Coastal
Access Project in the Draft Phase V.2
RP/SEA to address lost recreational
opportunities in Florida caused by the
Deepwater Horizon oil spill. In the Draft
Phase V.2 RP/SEA, the Florida TIG
proposes one preferred alternative, the
Salinas Park Addition, which involves
the acquisition and enhancement of a
6.6-acre coastal parcel. The Florida
Coastal Access Project was allocated
approximately $45.4 million in early
restoration funds, and the Salinas Park
Addition would cost approximately $3.1
million of the $6.4 million remaining
funds not utilized in the first phase of
the Florida Coastal Access Project. The
Florida TIG also considered two
additional land acquisition and
improvement alternatives, as well as the
no action alternative in the Draft Phase
V.2 RP/SEA. One or more alternatives
may be selected for implementation by
the Florida TIG in the Final Phase V.2
RP/SEA or in future restoration plans.
Details on the proposed second phase of
the Florida Coastal Access Project are
provided in the Draft Phase V.2 RP/SEA.
The proposed second phase of the
Florida Coastal Access Project is
intended to continue the process of
using restoration funding to restore
natural resources, ecological services,
and recreational use services injured or
lost as a result of the Deepwater Horizon
oil spill. Additional restoration
planning for the Florida Restoration
Area will continue.
Next Steps
As described above, a public meeting
is scheduled to facilitate the public
review and comment process on the
Draft Phase V.2 RP/SEA. After the
public comment period ends, the
Florida TIG will consider and address
the comments received before issuing a
final Phase V.2 RP/SEA.
ethrower on DSK3G9T082PROD with NOTICES
Public Availability of Comments
Before including your address, phone
number, email address, or other
personal identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you can ask us in your comment
to withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
VerDate Sep<11>2014
17:26 Nov 07, 2017
Jkt 244001
Administrative Record
The documents comprising the
Administrative Record for the Draft
Phase V.2 RP/SEA can be viewed
electronically at https://www.doi.gov/
deepwaterhorizon/administrativerecord.
Authority
The authority of this action is the Oil
Pollution Act of 1990 (33 U.S.C. 2701 et
seq.) and its implementing Natural
Resource Damage Assessment
regulations found at 15 CFR part 990
and the National Environmental Policy
Act of 1969 (42 U.S.C. 4321 et seq.).
Kevin D. Reynolds,
Designated Department of the Interior Natural
Resource Trustee Official.
[FR Doc. 2017–24197 Filed 11–7–17; 8:45 am]
BILLING CODE 4333–15–P
DEPARTMENT OF THE INTERIOR
Office of the Secretary
[18XD0120AF/DT20000000/DST000000/
241A/T0110100]
Tribal Consultation on Indian Trust
Asset Reform Act (ITARA) Sec. 304,
Transition Plan for the Office of the
Special Trustee for American Indians
Office of the Secretary, Interior.
Notice.
AGENCY:
ACTION:
This notice announces that
the Department of the Interior
(Department) will be hosting two Tribal
consultation sessions on a proposal to
transfer the Office of the Special Trustee
for American Indians (OST) to report to
the Office of the Assistant Secretary—
Indian Affairs (AS–IA) in FY 2018 via
a Secretary’s Order. Under the proposal,
the office would be headed temporarily
by the Principal Deputy Special Trustee,
who would be delegated the authorities
of the Special Trustee for American
Indians. Subsequently, the Department
plans to appoint a career executive to
act as the Director of OST.
DATES: Tribal consultation sessions will
be held by phone on Wednesday,
December 13, 1:00 p.m.– 4:00 p.m. EST,
and Thursday, December 14, 9:00 a.m.–
12:00 p.m. EST. Comments on this
proposal must be received by January
15, 2018.
ADDRESSES: Please submit comments via
email to consultation@bia.gov or mail to
Attn: ITARA Transition, c/o Elizabeth
Appel, Office of Regulatory Affairs &
Collaborative Action—Indian Affairs,
1849 C Street NW., Mail Stop 4660,
Washington, DC 20240. The toll free
call-in number for the consultation
sessions is: (888) 324–2907, and the
SUMMARY:
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
passcode is 9793554. Additional
information is available at www.doi.gov/
OST/ITARA.
FOR FURTHER INFORMATION CONTACT: Ms.
Elizabeth Appel, Director, Office of
Regulatory Affairs & Collaborative
Action, Office of the Assistant
Secretary—Indian Affairs, at
elizabeth.appel@bia.gov or (202) 273–
4680.
SUPPLEMENTARY INFORMATION: OST was
established in the Department by the
American Indian Trust Fund
Management Reform Act of 1994 (1994
Act), Public Law 103–412, when
Congress decided a Special Trustee was
needed to oversee reforms relating to
trust responsibilities throughout the
Department. In 1996, the Secretary of
the Interior (Secretary) transferred
management of Indian trust funds from
the Bureau of Indian Affairs (BIA) to the
OST. See Secretarial Order No. 3197.
OST has implemented reforms and
managed Indian trust funds for over 20
years.
In June 2016, Congress passed the
Indian Trust Asset Reform Act (ITARA),
Public Law 114–178. ITARA Section
304(a) requires the Secretary to prepare
and submit a plan for the transition of
functions of the OST to other bureaus or
agencies within the Department within
two years of submission of the plan to
Congress. Beginning in August 2016, the
Department held one listening session
and 10 Tribal consultation sessions
throughout Indian Country and held an
open period to solicit comments via a
notice in the Federal Register. Based on
consultation feedback, the Department
determined that the most appropriate
place for OST’s core functions is to
remain with OST as a permanent
organization. To ensure fully integrated
Indian policy and programs, we propose
to realign OST to report to AS–IA. To
meet the two-year deadline required by
ITARA Section 304(a), the Department
proposes transferring the OST to AS–IA
in FY 2018 via a Secretary’s Order.
Today, the OST holds approximately
$5 billion under trust management and
administers approximately 3,400 tribal
trust accounts for more than 250 Indian
Tribes and over 400,000 Individual
Indian Money (IIM) accounts. Each year,
OST disburses roughly $1.2 billion to
individual Indians and tribes.
Receipting, investing, and disbursing
activity is accomplished through the
processing of 10.3 million financial
transactions.
The OST organization features five
Regional Trust Administrators with
extensive backgrounds in trust
management, with over 50 Fiduciary
Trust Officers to serve as the primary
E:\FR\FM\08NON1.SGM
08NON1
Agencies
[Federal Register Volume 82, Number 215 (Wednesday, November 8, 2017)]
[Notices]
[Pages 51858-51860]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-24197]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
[FWS-R4-ES-2017-N156; FVHC98220410150-XXX-FF04G01000]
Notice of Availability; Florida Trustee Implementation Group
Deepwater Horizon Oil Spill Draft Phase V.2 Restoration Plan and
Supplemental Environmental Assessment; Florida Coastal Access Project
AGENCY: Interior.
ACTION: Notice of availability; request for comments.
-----------------------------------------------------------------------
SUMMARY: In accordance with the Oil Pollution Act of 1990, the National
Environmental Policy Act, the Deepwater Horizon Oil Spill Final
Programmatic Damage Assessment and Restoration Plan and Final
Programmatic Environmental Impact Statement (Final PDARP/PEIS), and the
resulting Consent Decree, the Federal and State natural resource
trustee agencies for the Florida Trustee Implementation Group (Florida
TIG) have prepared a Draft Phase V.2 Restoration Plan and Supplemental
Environmental Assessment (Draft Phase V.2 RP/SEA). The Draft Phase V.2
RP/SEA supplements the 2016 Final Phase V Early Restoration Plan and
Environmental Assessment (Final Phase V ERP/EA) and describes and
proposes the second phase of the Florida Coastal Access Project
intended to continue the process of restoring natural resources and
services injured or lost as a result of the Deepwater Horizon oil
spill, which occurred on or about April 20, 2010, in the Gulf of
Mexico.
DATES: The Florida TIG will consider public comments received on or
before December 8, 2017.
Public Meeting: The Florida TIG has scheduled a public meeting to
facilitate public review and comment on the Draft Phase V.2 RP/SEA.
Both written and verbal comments will be taken at the public meeting.
The Florida TIG will hold an open house followed by a public meeting.
The public meeting will include a presentation of the Draft Phase V.2
RP/SEA. The public meeting schedule is as follows:
------------------------------------------------------------------------
Date Time Location
------------------------------------------------------------------------
November 16, 2017........... 5:30 to 6:30 p.m.: Robert M. Moore
Open house--6:30 to Administration
8:00 p.m.: Public Building, 1000
meeting Cecil G. Costin Sr.
(presentations and Blvd., Port St.
discussion). Joe, FL 32456.
------------------------------------------------------------------------
ADDRESSES: Obtaining Documents: You may download the Draft Phase V.2
RP/SEA at any of the following sites:
https://www.gulfspillrestoration.noaa.gov.
https://www.doi.gov/deepwaterhorizon.
https://dep.state.fl.us/deepwaterhorizon/default.htm.
Alternatively, you may request a CD of the Draft Phase V.2 RP/SEA
(see FOR
[[Page 51859]]
FURTHER INFORMATION CONTACT). You may also view the document at any of
the public facilities listed at https://www.gulfspillrestoration.noaa.gov.
Submitting Comments: You may submit comments on the Draft Phase V.2
RP/SEA by one of following methods:
Via the Web: https://www.gulfspillrestoration.noaa.gov.
Via U.S. Mail: U.S. Fish and Wildlife Service, P.O. Box
49567, Atlanta, GA 30345.
In order to be considered, mailed comments must be postmarked on or
before the comment deadline given in the DATES section of this notice.
In Person: Written and oral comments may be submitted at
the public meeting on November 16, 2017 (see Public Availability of
Comments below).
FOR FURTHER INFORMATION CONTACT: Nanciann Regalado, at 404-679-4161, or
email nanciann_regalado@fws.gov.
SUPPLEMENTARY INFORMATION:
Introduction
On or about April 20, 2010, the mobile offshore drilling unit
Deepwater Horizon, which was being used to drill a well for BP
Exploration and Production, Inc. (BP), in the Macondo prospect
(Mississippi Canyon 252-MC252), experienced a significant explosion,
fire, and subsequent sinking in the Gulf of Mexico, resulting in an
unprecedented volume of oil and other discharges from the rig and from
the wellhead on the seabed. The Deepwater Horizon oil spill is the
largest off shore oil spill in U.S. history, discharging millions of
barrels of oil over a period of 87 days. In addition, well over 1
million gallons of dispersants were applied to the waters of the spill
area in an attempt to disperse the spilled oil. An undetermined amount
of natural gas was also released into the environment as a result of
the spill.
The Trustees conducted the natural resource damage assessment
(NRDA) for the Deepwater Horizon oil spill under OPA. Pursuant to OPA
(OPA; 33 U.S.C. 2701 et seq.), Federal and State agencies act as
trustees on behalf of the public to assess natural resource injuries
and losses and to determine the actions required to compensate the
public for those injuries and losses. OPA further instructs the
designated trustees to develop and implement a plan for the
restoration, rehabilitation, replacement, or acquisition of the
equivalent of the injured natural resources under their trusteeship,
including the loss of use and services from those resources from the
time of injury until the time of restoration to baseline (the resource
quality and conditions that would exist if the spill had not occurred)
is complete.
The Deepwater Horizon Trustees are:
U.S. Department of the Interior (DOI), as represented by
the National Park Service, U.S. Fish and Wildlife Service, and Bureau
of Land Management;
National Oceanic and Atmospheric Administration (NOAA), on
behalf of the U.S. Department of Commerce;
U.S. Department of Agriculture (USDA);
U.S. Environmental Protection Agency (EPA);
State of Louisiana Coastal Protection and Restoration
Authority, Oil Spill Coordinator's Office, Department of Environmental
Quality, Department of Wildlife and Fisheries, and Department of
Natural Resources;
State of Mississippi Department of Environmental Quality;
State of Alabama Department of Conservation and Natural
Resources and Geological Survey of Alabama;
State of Florida Department of Environmental Protection
and Fish and Wildlife Conservation Commission; and
State of Texas: Texas Parks and Wildlife Department, Texas
General Land Office, and Texas Commission on Environmental Quality.
Upon completion of the NRDA, the Trustees reached and finalized a
settlement of their natural resource damage claims with BP in an April
4, 2016, Consent Decree approved by the United States District Court
for the Eastern District of Louisiana. Pursuant to that Consent Decree,
restoration projects in the Florida Restoration Area are now chosen and
managed by the Florida TIG. The Florida TIG is composed of the
following six Trustees: State of Florida Department of Environmental
Protection and Fish and Wildlife Conservation Commission; DOI; NOAA;
EPA; and USDA.
Background
In the 2011 Framework Agreement for Early Restoration Addressing
Injuries Resulting from the Deepwater Horizon Oil Spill (Framework
Agreement), BP agreed to provide to the Trustees up to $1 billion
toward early restoration projects in the Gulf of Mexico to address
injuries to natural resources caused by the Deepwater Horizon oil
spill. The Framework Agreement represented a preliminary step toward
the restoration of injured natural resources and was intended to
expedite the start of restoration in the Gulf in advance of the
completion of the injury assessment process. Early restoration was not
intended to and did not fully address all injuries caused by the
Deepwater Horizon oil spill.
In the five phases of the early restoration process, the Trustees
selected, and BP agreed to fund, a total of 65 early restoration
projects expected to cost a total of approximately $877 million. The
Trustees selected these projects after public notice, public meetings,
and consideration of public comments, through the Phase I Early
Restoration Plan/Environmental Assessment (Phase I ERP/EA), Phase II
Early Restoration Plan/Environmental Review (Phase II ERP/ER), Phase
III ERP/PEIS, Phase IV Early Restoration Plan/Environment Assessments
(Phase IV ERP/EA), and Phase V ERP/EA. These plans are available at:
https://www.doi.gov/deepwaterhorizon.
The April 4, 2016, Consent Decree terminated and replaced the
Framework Agreement and provided that the Trustees shall use remaining
early restoration funds as specified in the early restoration plans and
in accordance with the Consent Decree. The Trustees have determined
that decisions concerning any unexpended early restoration funds are to
be made by the appropriate Trustee Implementation Group for that
project.
Overview of the Draft Phase V.2 RP/SEA
In the Final Phase V ERP/EA, the Deepwater Horizon State and
Federal natural resource trustees (Trustees) evaluated and selected the
first phase of the Florida Coastal Access Project. The Final Phase V
ERP/EA provided that the Florida Coastal Access Project would proceed
in phases, and that these future phases would consist of similar
restoration activities to be identified and selected by the Trustees in
the same manner and using the same criteria as described in the Final
Phase V ERP/EA, in accordance with OPA, NEPA, and other applicable
laws, and after public review of the proposed activities.
The proposed second phase of the Florida Coastal Access Project is
consistent with the early restoration program alternatives selected in
the Final Phase III Early Restoration Plan/Programmatic Environmental
Impact Statement (Final Phase III ERP/PEIS) and the Final PDARP/PEIS.
The purpose of this notice is to inform the public of the availability
of the Draft Phase V.2 RP/SEA and to seek public comments on the
proposed second phase of the Florida Coastal Access Project and
supporting analysis.
The Draft Phase V.2 RP/SEA is being released in accordance with
OPA, NRDA regulations found in the Code of Federal Regulations (CFR) at
15 CFR
[[Page 51860]]
part 990, NEPA, the Consent Decree, the Final PDARP/PEIS, the Phase III
ERP/PEIS and the Phase V ERP/EA.
The Florida TIG is considering the second phase of the Florida
Coastal Access Project in the Draft Phase V.2 RP/SEA to address lost
recreational opportunities in Florida caused by the Deepwater Horizon
oil spill. In the Draft Phase V.2 RP/SEA, the Florida TIG proposes one
preferred alternative, the Salinas Park Addition, which involves the
acquisition and enhancement of a 6.6-acre coastal parcel. The Florida
Coastal Access Project was allocated approximately $45.4 million in
early restoration funds, and the Salinas Park Addition would cost
approximately $3.1 million of the $6.4 million remaining funds not
utilized in the first phase of the Florida Coastal Access Project. The
Florida TIG also considered two additional land acquisition and
improvement alternatives, as well as the no action alternative in the
Draft Phase V.2 RP/SEA. One or more alternatives may be selected for
implementation by the Florida TIG in the Final Phase V.2 RP/SEA or in
future restoration plans. Details on the proposed second phase of the
Florida Coastal Access Project are provided in the Draft Phase V.2 RP/
SEA.
The proposed second phase of the Florida Coastal Access Project is
intended to continue the process of using restoration funding to
restore natural resources, ecological services, and recreational use
services injured or lost as a result of the Deepwater Horizon oil
spill. Additional restoration planning for the Florida Restoration Area
will continue.
Next Steps
As described above, a public meeting is scheduled to facilitate the
public review and comment process on the Draft Phase V.2 RP/SEA. After
the public comment period ends, the Florida TIG will consider and
address the comments received before issuing a final Phase V.2 RP/SEA.
Public Availability of Comments
Before including your address, phone number, email address, or
other personal identifying information in your comment, you should be
aware that your entire comment--including your personal identifying
information--may be made publicly available at any time. While you can
ask us in your comment to withhold your personal identifying
information from public review, we cannot guarantee that we will be
able to do so.
Administrative Record
The documents comprising the Administrative Record for the Draft
Phase V.2 RP/SEA can be viewed electronically at https://www.doi.gov/deepwaterhorizon/administrativerecord.
Authority
The authority of this action is the Oil Pollution Act of 1990 (33
U.S.C. 2701 et seq.) and its implementing Natural Resource Damage
Assessment regulations found at 15 CFR part 990 and the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
Kevin D. Reynolds,
Designated Department of the Interior Natural Resource Trustee
Official.
[FR Doc. 2017-24197 Filed 11-7-17; 8:45 am]
BILLING CODE 4333-15-P