Notice of Application Accepted for Filing, Soliciting Comments, Protests and Motions To Intervene; Sappi Cloquet LLC, 51617-51618 [2017-24153]
Download as PDF
Federal Register / Vol. 82, No. 214 / Tuesday, November 7, 2017 / Notices
burden of the collection of information
on respondents, including through the
use of automated collection techniques
or other forms of information
technology.
This information collection request
contains: (1) OMB No. 1910–5101; (2)
Information Collection Request Title:
Annual Alternative Fuel Vehicle
Acquisition Report for State
Government and Alternative Fuel
Provider Fleets; (3) Type of Review:
Renewal; (4) Purpose: The information
is required so that DOE can determine
whether alternative fuel provider and
State government fleets are in
compliance with the alternative fueled
vehicle acquisition mandates of sections
501 and 507(o) of the Energy Policy Act
of 1992, as amended, (EPAct), whether
such fleets should be allocated credits
under section 508 of EPAct, and
whether fleets that opted into the
alternative compliance program under
section 514 of EPAct are in compliance
with the applicable requirements; (5)
Annual Estimated Number of
Respondents: Approximately 303; (6)
Annual Estimated Number of Total
Responses: 335; (7) Annual Estimated
Number of Burden Hours: 1,970; (8)
Annual Estimated Reporting and
Recordkeeping Cost Burden: $120,000.
Statutory Authority: 42 U.S.C. 13251 et
seq.
Issued in Washington, DC on: November 1,
2017.
Michael Berube,
Director, Vehicle Technologies Office, Energy
Efficiency and Renewable Energy.
[FR Doc. 2017–24180 Filed 11–6–17; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
ethrower on DSK3G9T082PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP17–808–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: Report Filing: RP17–808
Supplemental Filing.
Filed Date: 10/30/17.
Accession Number: 20171030–5005.
Comments Due: 5 p.m. ET 11/8/17.
Docket Numbers: RP18–70–000.
Applicants: Trunkline Gas Company,
LLC.
VerDate Sep<11>2014
17:29 Nov 06, 2017
Jkt 244001
Description: Compliance filing
Annual Interruptible Storage Revenue
Credit filed 10–31–17.
Filed Date: 10/30/17.
Accession Number: 20171030–5085.
Comments Due: 5 p.m. ET 11/13/17.
Docket Numbers: RP18–71–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2017–10–30 Morgan Stanley to be
effective 11/1/2017.
Filed Date: 10/30/17.
Accession Number: 20171030–5106.
Comments Due: 5 p.m. ET 11/13/17.
Docket Numbers: RP18–72–000.
Applicants: Southern Star Central Gas
Pipeline, Inc.
Description: § 4(d) Rate Filing: Vol. 2
Negotiated and Non-Conforming PLS—
Tenaska November Amendment to be
effective 11/1/2017.
Filed Date: 10/30/17.
Accession Number: 20171030–5135.
Comments Due: 5 p.m. ET 11/13/17.
Docket Numbers: RP18–73–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2017–10–30 Encana to be effective
10/28/2017.
Filed Date: 10/30/17.
Accession Number: 20171030–5144.
Comments Due: 5 p.m. ET 11/13/17.
Docket Numbers: RP18–74–000.
Applicants: Kern River Gas
Transmission Company.
Description: § 4(d) Rate Filing: 2018
P2/AltP2 Rates, 15-Year 2003 Expansion
to be effective 5/1/2018.
Filed Date: 10/30/17.
Accession Number: 20171030–5145.
Comments Due: 5 p.m. ET 11/13/17.
Docket Numbers: RP18–75–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: AGT
FRQ 2017 Filing to be effective 12/1/
2017.
Filed Date: 10/30/17.
Accession Number: 20171030–5160.
Comments Due: 5 p.m. ET 11/13/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
51617
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated October 31, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–24149 Filed 11–6–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2363–088]
Notice of Application Accepted for
Filing, Soliciting Comments, Protests
and Motions To Intervene; Sappi
Cloquet LLC
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Extension of
License Term.
b. Project No.: P–2363–088.
c. Date Filed: October 23, 2017.
d. Licensee: Sappi Cloquet LLC.
e. Name and Location of Project:
Cloquet Hydroelectric Project, located
on the St. Louis River in Carlton
County, Minnesota.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
g. Licensee Contact Information: Mr.
Robert Schilling, Sappi North America,
2201 Avenue B, P.O. Box 511, Cloquet,
MN 55720, Phone: (218) 879–0638,
Email: Robert.Schilling@SAPPI.com and
Ms. Nancy J. Skancke, NJS Law PLC,
1025 Connecticut Avenue NW., Suite
1000, Washington, DC 20036, Phone:
(202) 327–5460, Email: njskancke@njslaw.com.
h. FERC Contact: Mr. Ashish Desai,
(202) 502–8370, Ashish.Desai@ferc.gov.
i. Deadline for filing comments,
motions to intervene and protests, is 30
days from the issuance date of this
notice by the Commission. The
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, and
recommendations, using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
E:\FR\FM\07NON1.SGM
07NON1
ethrower on DSK3G9T082PROD with NOTICES
51618
Federal Register / Vol. 82, No. 214 / Tuesday, November 7, 2017 / Notices
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2363–088.
j. Description of Proceeding: The
licensee, Sappi Cloquet LLC, requests
that the Commission extend the term of
the license for the Cloquet Hydroelectric
Project 10 years, from June 30, 2025 to
June 30, 2035. The licensee is requesting
the extension to align the license
expiration date of the project with that
of the St. Louis River Hydroelectric
Project No. 2360. The Cloquet Project is
located between the Knife Falls and
Scanlon developments of the St. Louis
River Project. The licensee states that
the extension would allow it to
coordinate its relicensing efforts with
those of the St. Louis River Project to
increase efficiency and evaluate the
operational and environment impacts of
the two projects in a comprehensive
manner. The licensee’s request includes
comments from the U.S. Fish and
Wildlife Service and the National Park
Service supporting the license
extension.
k. This notice is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE., Washington, DC
20426. The filing may also be viewed on
the Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the Docket number (P–2363–088)
excluding the last three digits in the
docket number field to access the
notice. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
VerDate Sep<11>2014
17:29 Nov 06, 2017
Jkt 244001
be received on or before the specified
comment date for the particular
application.
n. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title COMMENTS,
PROTEST, or MOTION TO INTERVENE
as applicable; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the request to
extend the license term. Agencies may
obtain copies of the application directly
from the applicant. A copy of any
protest or motion to intervene must be
served upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: November 1, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 11175–025]
Crown Hydro, LLC; Notice of
Teleconference To Discuss Section
106 Consultation for an Application To
Amend the Crown Mill Project
a. Project Name and Number: Crown
Mill Hydroelectric Project No. 11175.
b. Project licensee: Crown Hydro,
LLC.
c. Date and Time of Teleconference:
Wednesday, December 6, 2017, from
9:00 a.m. to 11:00 a.m. Central Standard
Time.
Frm 00022
Fmt 4703
Sfmt 4703
Dated: October 31, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–24142 Filed 11–6–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
[FR Doc. 2017–24153 Filed 11–6–17; 8:45 am]
PO 00000
d. FERC Contact: Jennifer Polardino,
(202) 502–6437 or jennifer.polardino@
ferc.gov
e. Purpose of Meeting: Commission
staff will hold a teleconference to
discuss the status of consultation under
section 106 of the National Historic
Preservation Act for an application to
amend the license of the unconstructed
Crown Mill Hydroelectric Project.
Crown Mill, LLC (licensee) proposes to
move the location of the project’s
powerhouse about 250 feet north to U.S.
Army Corps of Engineers (Corps) lands
within the campus of the Upper St.
Anthony Falls Lock and Dam. Crown
Mill, LLC also proposes to construct a
new tailrace tunnel instead of
connecting to an existing tunnel. The
project would be located on the
Mississippi River, in the downtown area
of the City of Minneapolis, Hennepin
County, Minnesota.
f. All local, state, and federal agencies,
Indian tribes, and other interested
entities are invited to participate in the
teleconference. Please call or email
Jennifer Polardino at (202) 502–6437 or
Jennifer.polardino@ferc.gov by
Thursday, November 30, 2017, to RSVP
and to receive the teleconference call-in
information.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–12–000.
Applicants: Public Service Company
of New Hampshire, Granite Shore Power
LLC.
Description: Joint Application of
Public Service Company of NH, et al. for
Approval of the Disposition of
Jurisdictional Facilities Under Section
203 of the FPA, Request for Waivers,
Request for Shortened Notice Period
and Expedited Consideration.
Filed Date: 10/27/17.
Accession Number: 20171027–5272.
Comments Due: 5 p.m. ET 12/11/17.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–12–000.
Applicants: EGP Stillwater Solar PV
II, LLC.
E:\FR\FM\07NON1.SGM
07NON1
Agencies
[Federal Register Volume 82, Number 214 (Tuesday, November 7, 2017)]
[Notices]
[Pages 51617-51618]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-24153]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2363-088]
Notice of Application Accepted for Filing, Soliciting Comments,
Protests and Motions To Intervene; Sappi Cloquet LLC
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Proceeding: Extension of License Term.
b. Project No.: P-2363-088.
c. Date Filed: October 23, 2017.
d. Licensee: Sappi Cloquet LLC.
e. Name and Location of Project: Cloquet Hydroelectric Project,
located on the St. Louis River in Carlton County, Minnesota.
f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
g. Licensee Contact Information: Mr. Robert Schilling, Sappi North
America, 2201 Avenue B, P.O. Box 511, Cloquet, MN 55720, Phone: (218)
879-0638, Email: Robert.Schilling@SAPPI.com and Ms. Nancy J. Skancke,
NJS Law PLC, 1025 Connecticut Avenue NW., Suite 1000, Washington, DC
20036, Phone: (202) 327-5460, Email: law.com">njskancke@njs-law.com.
h. FERC Contact: Mr. Ashish Desai, (202) 502-8370,
Ashish.Desai@ferc.gov.
i. Deadline for filing comments, motions to intervene and protests,
is 30 days from the issuance date of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file motions
to intervene, protests, comments, and recommendations, using the
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance,
[[Page 51618]]
please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866)
208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, please send a paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426. The
first page of any filing should include docket number P-2363-088.
j. Description of Proceeding: The licensee, Sappi Cloquet LLC,
requests that the Commission extend the term of the license for the
Cloquet Hydroelectric Project 10 years, from June 30, 2025 to June 30,
2035. The licensee is requesting the extension to align the license
expiration date of the project with that of the St. Louis River
Hydroelectric Project No. 2360. The Cloquet Project is located between
the Knife Falls and Scanlon developments of the St. Louis River
Project. The licensee states that the extension would allow it to
coordinate its relicensing efforts with those of the St. Louis River
Project to increase efficiency and evaluate the operational and
environment impacts of the two projects in a comprehensive manner. The
licensee's request includes comments from the U.S. Fish and Wildlife
Service and the National Park Service supporting the license extension.
k. This notice is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may also be viewed on the Commission's
Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the
Docket number (P-2363-088) excluding the last three digits in the
docket number field to access the notice. You may also register online
at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via
email of new filings and issuances related to this or other pending
projects. For assistance, call toll-free 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659.
l. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
m. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
n. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO
INTERVENE as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions
to intervene, or protests must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). All comments,
motions to intervene, or protests should relate to the request to
extend the license term. Agencies may obtain copies of the application
directly from the applicant. A copy of any protest or motion to
intervene must be served upon each representative of the applicant
specified in the particular application. If an intervener files
comments or documents with the Commission relating to the merits of an
issue that may affect the responsibilities of a particular resource
agency, they must also serve a copy of the document on that resource
agency. A copy of all other filings in reference to this application
must be accompanied by proof of service on all persons listed in the
service list prepared by the Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and 385.2010.
Dated: November 1, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-24153 Filed 11-6-17; 8:45 am]
BILLING CODE 6717-01-P