Alabama Power Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 50642 [2017-23779]
Download as PDF
50642
Federal Register / Vol. 82, No. 210 / Wednesday, November 1, 2017 / Notices
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: October 26, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL18–21–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426, in accordance with Rule 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214, within 21
days of the date of issuance of the order.
Dated: October 26, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–23779 Filed 10–31–17; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2017–23780 Filed 10–31–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings
[Docket No. EL18–21–000]
Alabama Power Company; Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
On October 25, 2017, the Commission
issued an order in Docket No. EL18–21–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into whether Southern Companies’ 1
market-based rate authority in the South
Carolina Electric and Gas Co., City of
Tallahassee, and Santee Cooper
balancing authority areas may be unjust,
unreasonable, unduly discriminatory or
preferential. Alabama Power Company,
161 FERC 61,102 (2017).
The refund effective date in Docket
No. EL18–21–000, established pursuant
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP18–51–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing: Targa
Gas Marketing Negotiated Rate to be
effective 11/1/2017.
Filed Date: 10/23/17.
Accession Number: 20171023–5300.
Comments Due: 5 p.m. ET 11/6/17.
Docket Numbers: RP18–52–000.
Applicants: Kern River Gas
Transmission Company.
Description: § 4(d) Rate Filing: 2017
October Negotiated Rates to be effective
10/23/2017.
Filed Date: 10/23/17.
Accession Number: 20171023–5482.
Comments Due: 5 p.m. ET 11/6/17.
Docket Numbers: RP18–53–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing: Update
to Fuel Exemption Routes to be effective
12/1/2017.
Filed Date: 10/23/17.
Accession Number: 20171023–5485.
Comments Due: 5 p.m. ET 11/6/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 25, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–23778 Filed 10–31–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Petition for Declaratory Order
Docket
No.
IGS ORIX Solar I, LLC, IGS Solar I, LLC .............
IGS ORIX Solar I, LLC ..........................................
Docket No. EL18–24–000.
Docket Nos. QF17–1029–002, QF17–1030–001, QF17–1337–001, QF17–1338–001, QF17–
1357–001, QF17–1455–001, QF17–1532–001, QF17–1537–001, QF17–1538–001.
Docket Nos. QF17–1256–002, QF17–1257–002, QF17–1258–002.
sradovich on DSK3GMQ082PROD with NOTICES
IGS Solar I, LLC ....................................................
Take notice that on October 24, 2017,
pursuant to Rule 207 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207 (2017), IGS
ORIX Solar I, LLC and IGS Solar I, LLC
(together Applicants) filed a petition for
declaratory order requesting the
Commission grant certain of Applicants’
solar generating projects limited waivers
of the qualifying facility certification
requirement set forth in section
292.203(a)(3) 1 for the period of time
during which each project commenced
operation to the date Applicants caused
a FERC Form 556 Notice of Self-
Certification of Qualifying Facility
Status to be filed for such project, all as
more fully explained in the petition.
Any person desiring to intervene or to
protest in this proceeding must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
1 Southern Companies include the following:
Alabama Power Company; Southern Power
Company; Mississippi Power Company; Georgia
Power Company; Gulf Power Company; Oleander
Power Project, Limited Partnership; Southern
Company—Florida LLC; and Mankato Energy
Center, LLC.
1 18 CFR 292.203(a)(3) (2017).
VerDate Sep<11>2014
18:16 Oct 31, 2017
Jkt 244001
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
E:\FR\FM\01NON1.SGM
01NON1
Agencies
[Federal Register Volume 82, Number 210 (Wednesday, November 1, 2017)]
[Notices]
[Page 50642]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-23779]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL18-21-000]
Alabama Power Company; Notice of Institution of Section 206
Proceeding and Refund Effective Date
On October 25, 2017, the Commission issued an order in Docket No.
EL18-21-000, pursuant to section 206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an investigation into whether Southern
Companies' \1\ market-based rate authority in the South Carolina
Electric and Gas Co., City of Tallahassee, and Santee Cooper balancing
authority areas may be unjust, unreasonable, unduly discriminatory or
preferential. Alabama Power Company, 161 FERC 61,102 (2017).
---------------------------------------------------------------------------
\1\ Southern Companies include the following: Alabama Power
Company; Southern Power Company; Mississippi Power Company; Georgia
Power Company; Gulf Power Company; Oleander Power Project, Limited
Partnership; Southern Company--Florida LLC; and Mankato Energy
Center, LLC.
---------------------------------------------------------------------------
The refund effective date in Docket No. EL18-21-000, established
pursuant to section 206(b) of the FPA, will be the date of publication
of this notice in the Federal Register.
Any interested person desiring to be heard in Docket No. EL18-21-
000 must file a notice of intervention or motion to intervene, as
appropriate, with the Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426, in accordance with Rule 214 of the
Commission's Rules of Practice and Procedure, 18 CFR 385.214, within 21
days of the date of issuance of the order.
Dated: October 26, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-23779 Filed 10-31-17; 8:45 am]
BILLING CODE 6717-01-P