Notice of Application for Surrender of License, Soliciting Comments, Motions To Intervene, And Protests; Far West Power Corporation, 49366-49367 [2017-23113]

Download as PDF 49366 Federal Register / Vol. 82, No. 205 / Wednesday, October 25, 2017 / Notices • Vegetation and wildlife; • Air quality and noise; • Endangered and threatened species; • Public safety; and • Cumulative impacts. We will also evaluate reasonable alternatives to the proposed project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. The EA will present our independent analysis of the issues. The EA will be available in the public record through eLibrary. Depending on the comments received during the scoping process, we may also publish and distribute the EA to the public for an allotted comment period. We will consider all comments on the EA before making our recommendations to the Commission. To ensure we have the opportunity to consider and address your comments, please carefully follow the instructions in the Public Participation section on page 2. With this notice, we are asking agencies with jurisdiction by law and/ or special expertise with respect to the environmental issues of this project to formally cooperate with us in the preparation of the EA.4 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. sradovich on DSK3GMQ082PROD with NOTICES Consultations Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, we are using this notice to initiate consultation with the applicable State Historic Preservation Office (SHPO), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.5 We will define the project-specific Area of Potential Effects (APE) in consultation with the SHPO as the project develops. On natural gas facility projects, the APE at a minimum encompasses all areas subject to ground disturbance (examples include construction right-of-way, contractor/ 4 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at Title 40, Code of Federal Regulations, Part 1501.6. 5 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal Regulations, Part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. VerDate Sep<11>2014 22:06 Oct 24, 2017 Jkt 244001 pipe storage yards, compressor stations, and access roads). Our EA for this project will document our findings on the impacts on historic properties and summarize the status of consultations under section 106. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. If we publish and distribute the EA, copies will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (appendix 2). Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an intervenor which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are in the Document-less Intervention Guide under the e-filing link on the Commission’s Web site. Motions to intervene are more fully described at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site at www.ferc.gov using the eLibrary link. Click on the eLibrary link, click on General Search and enter the docket PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 number, excluding the last three digits in the Docket Number field (i.e., CP17– 490). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Finally, public sessions or site visits will be posted on the Commission’s calendar located at www.ferc.gov/Event Calendar/EventsList.aspx along with other related information. Dated: October 19, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–23107 Filed 10–24–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 8936–024] Notice of Application for Surrender of License, Soliciting Comments, Motions To Intervene, And Protests; Far West Power Corporation Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Proceeding: Application for surrender of license. b. Project No.: 8936–024. c. Date Filed: August 1, 2017. d. Licensee: Far West Power Corporation. e. Name of Project: Power Canal Hydroelectric Project. f. Location: The project is located on the tailrace canal of Pacific Gas and Electric Company’s (PG&E) Potter Valley Hydroelectric Project No. 77, on the East Fork Russian River, in Mendocino County, California. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Licensee Contact: Mr. Ross Goodwin, Far West Power Corporation, E:\FR\FM\25OCN1.SGM 25OCN1 sradovich on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 82, No. 205 / Wednesday, October 25, 2017 / Notices 3330 Clayton Road, Suite B, Concord, CA 94518, Telephone: (925) 692–2198. i. FERC Contact: Mr. Ashish Desai, (202) 502–8370, Ashish.Desai@ferc.gov. j. Deadline for filing comments, interventions, and protests is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests and comments using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–8936–024. k. Description of Project Facilities: The project consists of: (a) A 6-foot-high diversion dam; (b) an intake structure; (c) a 150-foot-long, 49-foot-square flume; (d) a 36-inch-diameter, 28-foot-long penstock; (e) a powerhouse containing two generating units, each with an installed capacity of 200 kilowatts; (f) 0.48-kilovolt (kV) generator leads with a 12.7–kV step-up transformer; (g) 60-footlong, 12.7–kV transmission line connecting to an existing PG&E transmission line; and (h) appurtenant facilities. l. Description of Request: The licensee proposes to surrender the project as it no longer intends to operate the project. The existing water right for the project has been surrendered and the power sales agreement has been terminated. No ground disturbance is associated with the proposed surrender and project features will remain in place. m. This filing may be viewed on the Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction in the Commission’s Public Reference Room located at 888 VerDate Sep<11>2014 22:06 Oct 24, 2017 Jkt 244001 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. n. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. o. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .212 and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. p. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to the surrender application that is the subject of this notice. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. q. Agency Comments—Federal, state, and local agencies are invited to file comments on the described proceeding. If any agency does not file comments within the time specified for filing PO 00000 Frm 00057 Fmt 4703 Sfmt 4703 49367 comments, it will be presumed to have no comments. Dated: October 19, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–23113 Filed 10–24–17; 8:45 am] BILLING CODE 6717–01–P FEDERAL COMMUNICATIONS COMMISSION [OMB 3060–0208] Information Collection Being Submitted for Review and Approval to the Office of Management and Budget Federal Communications Commission. ACTION: Notice and request for comments. AGENCY: As part of its continuing effort to reduce paperwork burdens, and as required by the Paperwork Reduction Act (PRA) of 1995, the Federal Communications Commission (FCC or the Commission) invites the general public and other Federal agencies to take this opportunity to comment on the following information collection. Comments are requested concerning: Whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; the accuracy of the Commission’s burden estimate; ways to enhance the quality, utility, and clarity of the information collected; ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology; and ways to further reduce the information collection burden on small business concerns with fewer than 25 employees. The Commission may not conduct or sponsor a collection of information unless it displays a currently valid Office of Management and Budget (OMB) control number. No person shall be subject to any penalty for failing to comply with a collection of information subject to the PRA that does not display a valid OMB control number. DATES: Written comments should be submitted on or before November 24, 2017. If you anticipate that you will be submitting comments, but find it difficult to do so within the period of time allowed by this notice, you should advise the contacts listed below as soon as possible. ADDRESSES: Direct all PRA comments to Nicholas A. Fraser, OMB, via email SUMMARY: E:\FR\FM\25OCN1.SGM 25OCN1

Agencies

[Federal Register Volume 82, Number 205 (Wednesday, October 25, 2017)]
[Notices]
[Pages 49366-49367]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-23113]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 8936-024]


Notice of Application for Surrender of License, Soliciting 
Comments, Motions To Intervene, And Protests; Far West Power 
Corporation

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Proceeding: Application for surrender of license.
    b. Project No.: 8936-024.
    c. Date Filed: August 1, 2017.
    d. Licensee: Far West Power Corporation.
    e. Name of Project: Power Canal Hydroelectric Project.
    f. Location: The project is located on the tailrace canal of 
Pacific Gas and Electric Company's (PG&E) Potter Valley Hydroelectric 
Project No. 77, on the East Fork Russian River, in Mendocino County, 
California.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Licensee Contact: Mr. Ross Goodwin, Far West Power Corporation,

[[Page 49367]]

3330 Clayton Road, Suite B, Concord, CA 94518, Telephone: (925) 692-
2198.
    i. FERC Contact: Mr. Ashish Desai, (202) 502-8370, 
[email protected].
    j. Deadline for filing comments, interventions, and protests is 30 
days from the issuance date of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file motions 
to intervene, protests and comments using the Commission's eFiling 
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-8936-024.
    k. Description of Project Facilities: The project consists of: (a) 
A 6-foot-high diversion dam; (b) an intake structure; (c) a 150-foot-
long, 49-foot-square flume; (d) a 36-inch-diameter, 28-foot-long 
penstock; (e) a powerhouse containing two generating units, each with 
an installed capacity of 200 kilowatts; (f) 0.48-kilovolt (kV) 
generator leads with a 12.7-kV step-up transformer; (g) 60-foot-long, 
12.7-kV transmission line connecting to an existing PG&E transmission 
line; and (h) appurtenant facilities.
    l. Description of Request: The licensee proposes to surrender the 
project as it no longer intends to operate the project. The existing 
water right for the project has been surrendered and the power sales 
agreement has been terminated. No ground disturbance is associated with 
the proposed surrender and project features will remain in place.
    m. This filing may be viewed on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and 
issuances related to this or other pending projects. For assistance, 
call 1-866-208-3676 or email [email protected], for TTY, call 
(202) 502-8659. A copy is also available for inspection and 
reproduction in the Commission's Public Reference Room located at 888 
First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 
502-8371.
    n. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    o. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.212 and .214. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    p. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO 
INTERVENE as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions 
to intervene, or protests must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). All comments, 
motions to intervene, or protests should relate to the surrender 
application that is the subject of this notice. Agencies may obtain 
copies of the application directly from the applicant. A copy of any 
protest or motion to intervene must be served upon each representative 
of the applicant specified in the particular application. If an 
intervener files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency. A copy of all other filings in reference to 
this application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    q. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described proceeding. If any agency does not 
file comments within the time specified for filing comments, it will be 
presumed to have no comments.

    Dated: October 19, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-23113 Filed 10-24-17; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.