Columbia Gas Transmission, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Buckeye Xpress Project; Request for Comments on Environmental Issues, and Notice of Public Scoping Sessions, 49012-49015 [2017-22917]
Download as PDF
49012
Federal Register / Vol. 82, No. 203 / Monday, October 23, 2017 / Notices
On June 16, 2017, the Commission
issued its Notice of Application for the
Majorsville Compressor Station
Amendment, now being considered in
Docket No. CP17–464–000. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the project.
Schedule for Environmental Review
Issuance of EA—November 1, 2017.
90-day Federal Authorization Decision
Deadline—January 30, 2018.
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
ethrower on DSK3G9T082PROD with NOTICES
Project Description
Rover proposes to install a third 3,550
horsepower natural gas compressor unit
at the Majorsville Compressor Station 1
and a new equipment run at the
Majorsville Meter Station in Marshall
County, West Virginia. The new unit
would bring the Majorsville Compressor
Station to a total of 10,650 horsepower.
The proposal would increase the point
capacity of the Majorsville Compressor
Station and the Majorsville Meter
Station from 300 MMcf/d to 400 MMcf/
d. Rover would house the new unit (and
the previously approved units) by
expanding the length of the currently
under construction compressor
building. Rover has not proposed to
expand the station boundary beyond the
previously approved limits.
Background
On August 4, 2017, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Majorsville Compressor
Station Amendment and Request for
Comments on Environmental Issues
(NOI). The NOI was sent to federal,
state, and local government
representatives and agencies;
environmental and public interest
groups; and other interested parties. It
was also sent to all affected landowners
(as defined in the Commission’s
regulations) who are within 0.5 mile of
the Majorsville Compressor Station. In
1 The Majorsville Compressor Station was
approved by the Commission on February 2, 2017,
in Docket No. CP15–93–000 as a component of the
Rover Pipeline Project and is currently under
construction.
VerDate Sep<11>2014
20:08 Oct 20, 2017
Jkt 244001
response to the NOI, the Commission
received comments from the U.S.
Environmental Protection Agency
(EPA). The primary issues raised by the
EPA are purpose and need, alternatives,
and air quality and noise.
The EPA is currently participating as
a cooperating agency in the preparation
of the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the eLibrary
link, select General Search from the
eLibrary menu, enter the selected date
range and Docket Number excluding the
last three digits (i.e., CP17–464), and
follow the instructions. For assistance
with access to eLibrary, the helpline can
be reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
Web site also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
Dated: October 17, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–22921 Filed 10–20–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF17–6–000]
Columbia Gas Transmission, LLC;
Notice of Intent To Prepare an
Environmental Assessment for the
Planned Buckeye Xpress Project;
Request for Comments on
Environmental Issues, and Notice of
Public Scoping Sessions
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the planned Buckeye Xpress Project
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
(Buckeye Project) involving
construction and operation of facilities
by Columbia Gas Transmission, LLC
(Columbia) in Vinton, Jackson, Gallia,
and Lawrence Counties, Ohio. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the Project.
You can make a difference by providing
us with your specific comments or
concerns about the Project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. To ensure that your
comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before November
16, 2017.
If you sent comments on this Project
to the Commission before the opening of
this docket on August 1, 2017, you will
need to file those comments in Docket
No. PF17–6–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this planned
Project and encourage them to comment
on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
planned facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
A fact sheet prepared by the FERC
entitled An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know? is available for viewing on
the FERC Web site (www.ferc.gov). This
fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings.
E:\FR\FM\23OCN1.SGM
23OCN1
Federal Register / Vol. 82, No. 203 / Monday, October 23, 2017 / Notices
Public Participation
For your convenience, there are four
methods you can use to submit your
comments to the Commission. The
Commission will provide equal
consideration to all comments received,
whether filed in written form or
provided verbally. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on eRegister. If you are filing a
Date and time
ethrower on DSK3G9T082PROD with NOTICES
The primary goal of these scoping
sessions is to have you identify the
specific environmental issues and
concerns that should be considered in
the EA to be prepared for this project.
Individual verbal comments will be
taken on a one-on-one basis with a court
reporter. This format is designed to
receive the maximum amount of verbal
comments, in a convenient way during
the timeframe allotted.
Each scoping session is scheduled
from 4:30 p.m. to 7:30 p.m. Eastern
time. You may arrive at any time after
4:30 p.m. There will not be a formal
presentation by Commission staff when
the session opens. If you wish to speak,
the Commission staff will hand out
numbers in the order of your arrival.
Comments will be taken until 6:30 p.m.
However, if no additional numbers have
been handed out and all individuals
who wish to provide comments have
had an opportunity to do so, staff may
conclude the session at 7:00 p.m. Please
see appendix 1 for additional
information on the session format and
conduct.1
Your scoping comments will be
recorded by the court reporter (with
FERC staff or representative present)
and become part of the public record for
this proceeding. Transcripts will be
publicly available on FERC’s eLibrary
system (see below for instructions on
using eLibrary). If a significant number
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
20:08 Oct 20, 2017
Jkt 244001
comment on a particular project, please
select ‘‘Comment on a Filing’’ as the
filing type;
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (PF17–6–000)
with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Room 1A, Washington, DC 20426;
or
(4) In lieu of sending written or
electronic comments, the Commission
invites you to attend one of the public
scoping sessions its staff will conduct in
the project area, scheduled as follows:
Location
Tuesday, October 24, 2017, 4:30–7:30 p.m ........................
Wednesday, October 25, 2017, 4:30–7:30 p.m ...................
VerDate Sep<11>2014
49013
Ironton High School, 1701 South 7th Street, Ironton, Ohio 45638, 740–532–3911.
Jackson High School, 500 Vaughn Street, Jackson, Ohio 45640, 740–286–7575.
of people are interested in providing
verbal comments in the one-on-one
settings, a time limit of 5 minutes may
be implemented for each commentor.
It is important to note that verbal
comments hold the same weight as
written or electronically submitted
comments. Although there will not be a
formal presentation, Commission staff
will be available throughout the
comment session to answer your
questions about the environmental
review process. Representatives from
Columbia will also be present to answer
project-specific questions.
Summary of the Planned Project
Columbia plans to replace Columbia’s
aging system with newer and more
reliable pipeline facilities in Vinton,
Jackson, Gallia, and Lawrence Counties,
Ohio. The Project would provide about
275,000 dekatherms per day of
additional firm natural gas
transportation capacity. According to
Columbia, its project would ensure
reliability and flexibility for its firm
storage and storage transportation
services on a system-wide basis.
The Buckeye Project would consist of
the following facilities:
• Install 65.7 miles of new, 36-inchdiameter natural gas pipeline and
various associated facilities including
two tie-ins, four new MLVs, suction and
discharge lines to the Oak Hill
Compressor Station, and installation of
over-pressure protection at five
locations (planned R–801 system);
• abandon 58.8 miles of existing 20inch-diameter natural gas pipeline and
associated facilities (R–501 system); and
• abandon 2.0 miles of existing 20inch-diameter and 24-inch-diameter
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
natural gas pipeline and associated
facilities (R–500 system).
The general location of the project
facilities is shown in appendix 2.
Land Requirements for Construction
Construction of the planned R–801
facilities would disturb about 1,220
acres of land for the aboveground
facilities and the pipeline.
Abandonment of the existing R–500 and
R–501 systems would affect about 979
acres. Following construction, Columbia
would maintain about 402 acres for
permanent operation of the project’s
new R–801 facilities; the remaining
acreage would be restored and revert to
former uses. About 80 percent of the
planned pipeline route would parallel
existing pipeline, utility, or road rightsof-way.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 2 to
discover and address concerns the
public may have about proposals. This
process is referred to as scoping. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
2 We, us, and our refer to the environmental staff
of the Commission’s Office of Energy Projects.
E:\FR\FM\23OCN1.SGM
23OCN1
ethrower on DSK3G9T082PROD with NOTICES
49014
Federal Register / Vol. 82, No. 203 / Monday, October 23, 2017 / Notices
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
planned project under these general
headings:
• Geology and soils;
• land use;
• water resources, fisheries, and
wetlands;
• cultural resources;
• vegetation and wildlife;
• air quality and noise;
• endangered and threatened species;
• public safety; and
• cumulative impacts.
We will also evaluate possible
alternatives to the planned Project or
portions of the Project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Although no formal application has
been filed, we have already initiated our
NEPA review under the Commission’s
pre-filing process. The purpose of the
pre-filing process is to encourage early
involvement of interested stakeholders
and to identify and resolve issues before
the FERC receives an application. As
part of our pre-filing review, we have
begun to contact some federal and state
agencies to discuss their involvement in
the scoping process and the preparation
of the EA.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. Depending on the comments
received during the scoping process, we
may also publish and distribute the EA
to the public for an allotted comment
period. We will consider all comments
on the EA before we make our
recommendations to the Commission.
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section,
beginning on page 2.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues related to this
project to formally cooperate with us in
the preparation of the EA.3 Agencies
that would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice. Currently, the
U.S. Army Corps of Engineers has
expressed its intention to participate as
a cooperating agency in the preparation
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
VerDate Sep<11>2014
20:08 Oct 20, 2017
Jkt 244001
of the EA to satisfy its NEPA
responsibilities related to this project.
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with the
Ohio State Historic Preservation Office
(SHPO), and to solicit their views and
those of other government agencies,
interested Indian tribes, and the public
on the project’s potential effects on
historic properties.4 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project develops. On natural gas
facility projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
and access roads). Our EA for this
project will document our findings on
the impacts on historic properties and
summarize the status of consultations
under section 106.
Currently Identified Environmental
Issues
We have already identified several
issues that we think deserve attention
based on a preliminary review of the
planned facilities and the
environmental information provided by
Columbia. This preliminary list of
issues may change based on your
comments and our analysis and
includes:
• Agriculture and prime farmland;
• water resources;
• crossing of the Wayne National
Forest;
• endangered species; and
• steep terrain.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
4 The Advisory Council on Historic Preservation
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the planned project.
If we publish and distribute the EA,
copies of the EA will be sent to the
environmental mailing list for public
review and comment. If you would
prefer to receive a paper copy of the
document instead of the CD version or
would like to remove your name from
the mailing list, please return the
attached Information Request (appendix
3).
Becoming an Intervenor
Once Columbia files its application
with the Commission, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Motions to intervene are
more fully described at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp. Instructions for becoming
an intervenor are in the Document-less
Intervention Guide under the e-filing
link on the Commission’s Web site.
Please note that the Commission will
not accept requests for intervenor status
at this time. You must wait until the
Commission receives a formal
application for the project.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search’’ and enter the docket
number, excluding the last three digits
in the Docket Number field (i.e., PF17–
6). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
E:\FR\FM\23OCN1.SGM
23OCN1
Federal Register / Vol. 82, No. 203 / Monday, October 23, 2017 / Notices
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public sessions or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: October 16, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–22917 Filed 10–20–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2337–077]
ethrower on DSK3G9T082PROD with NOTICES
PacifiCorp; Notice of Availability of
Draft Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for new license for the
Prospect No. 3 Hydroelectric Project,
located on the South Fork of the Rogue
River in Jackson County, Oregon, and
has prepared a Draft Environmental
Assessment (DEA) for the project. The
project currently occupies 32.4 acres of
federal land managed by the U.S. Forest
Service as part of the Rogue RiverSiskiyou National Forest.
The DEA contains the staff’s analysis
of the potential environmental impacts
of continued operation and maintenance
of the project and concludes that
relicensing the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the DEA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
VerDate Sep<11>2014
20:08 Oct 20, 2017
Jkt 244001
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
45 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–2337–077.
For further information, contact
Dianne Rodman at (202) 502–6077.
Dated: October 17, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–22920 Filed 10–20–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–86–001.
Applicants: Green Mountain Power
Corporation.
Description: Notice of Non-Material
Change in Circumstances of Green
Mountain Power Corporation.
Filed Date: 10/13/17.
Accession Number: 20171013–5187.
Comments Due: 5 p.m. ET 11/3/17.
Docket Numbers: EC17–109–000.
Applicants: ALLETE, Inc., ALLETE
Clean Energy, Inc.
Description: Response of ALLETE,
Inc., et al. to September 15, 2017 letter
requesting additional information.
Filed Date: 10/13/17.
Accession Number: 20171013–5184.
Comments Due: 5 p.m. ET 11/3/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–1923–003;
ER10–2334–004; ER12–1924–003;
PO 00000
Frm 00045
Fmt 4703
Sfmt 9990
49015
ER11–3406–004; ER11–3407–004;
ER10–2897–006; ER12–1865–005;
ER12–1925–003.
Applicants: Big Savage, LLC, Big Sky
Wind, LLC, EverPower Commercial
Services LLC, Highland North LLC,
Howard Wind LLC, Krayn Wind LLC,
Mustang Hills, LLC, Patton Wind Farm,
LLC.
Description: Supplement to June 30,
2017 Triennial Market Power Update for
the Northeast Region of the EverPower
Companies.
Filed Date: 10/12/17.
Accession Number: 20171012–5153.
Comments Due: 5 p.m. ET 11/2/17.
Docket Numbers: ER15–1456–004;
ER11–4634–004; ER17–436–002; ER17–
437–004; ER15–1457–004.
Applicants: Beaver Falls, L.L.C.,
Hazleton Generation LLC, Marcus Hook
Energy, L.P., Marcus Hook 50, L.P.,
Syracuse, L.L.C.
Description: Supplement to June 30,
2017 Triennial Market Power Update for
the Northeast Region of Beaver Falls,
L.L.C., et al.
Filed Date: 10/12/17.
Accession Number: 20171012–5161.
Comments Due: 5 p.m. ET 11/2/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 16, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–22888 Filed 10–20–17; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\23OCN1.SGM
23OCN1
Agencies
[Federal Register Volume 82, Number 203 (Monday, October 23, 2017)]
[Notices]
[Pages 49012-49015]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-22917]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PF17-6-000]
Columbia Gas Transmission, LLC; Notice of Intent To Prepare an
Environmental Assessment for the Planned Buckeye Xpress Project;
Request for Comments on Environmental Issues, and Notice of Public
Scoping Sessions
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the planned Buckeye Xpress Project
(Buckeye Project) involving construction and operation of facilities by
Columbia Gas Transmission, LLC (Columbia) in Vinton, Jackson, Gallia,
and Lawrence Counties, Ohio. The Commission will use this EA in its
decision-making process to determine whether the project is in the
public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the Project. You can make a difference by providing us with
your specific comments or concerns about the Project. Your comments
should focus on the potential environmental effects, reasonable
alternatives, and measures to avoid or lessen environmental impacts.
Your input will help the Commission staff determine what issues they
need to evaluate in the EA. To ensure that your comments are timely and
properly recorded, please send your comments so that the Commission
receives them in Washington, DC on or before November 16, 2017.
If you sent comments on this Project to the Commission before the
opening of this docket on August 1, 2017, you will need to file those
comments in Docket No. PF17-6-000 to ensure they are considered as part
of this proceeding. This notice is being sent to the Commission's
current environmental mailing list for this project. State and local
government representatives should notify their constituents of this
planned Project and encourage them to comment on their areas of
concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the planned facilities. The company
would seek to negotiate a mutually acceptable agreement. However, if
the Commission approves the project, that approval conveys with it the
right of eminent domain. Therefore, if easement negotiations fail to
produce an agreement, the pipeline company could initiate condemnation
proceedings where compensation would be determined in accordance with
state law.
A fact sheet prepared by the FERC entitled An Interstate Natural
Gas Facility On My Land? What Do I Need To Know? is available for
viewing on the FERC Web site (www.ferc.gov). This fact sheet addresses
a number of typically asked questions, including the use of eminent
domain and how to participate in the Commission's proceedings.
[[Page 49013]]
Public Participation
For your convenience, there are four methods you can use to submit
your comments to the Commission. The Commission will provide equal
consideration to all comments received, whether filed in written form
or provided verbally. The Commission encourages electronic filing of
comments and has expert staff available to assist you at (202) 502-8258
or [email protected]. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for submitting brief,
text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
eRegister. If you are filing a comment on a particular project, please
select ``Comment on a Filing'' as the filing type;
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the project docket number
(PF17-6-000) with your submission: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Room 1A,
Washington, DC 20426; or
(4) In lieu of sending written or electronic comments, the
Commission invites you to attend one of the public scoping sessions its
staff will conduct in the project area, scheduled as follows:
------------------------------------------------------------------------
Date and time Location
------------------------------------------------------------------------
Tuesday, October 24, 2017, 4:30-7:30 Ironton High School, 1701 South
p.m. 7th Street, Ironton, Ohio
45638, 740-532-3911.
Wednesday, October 25, 2017, 4:30-7:30 Jackson High School, 500 Vaughn
p.m. Street, Jackson, Ohio 45640,
740-286-7575.
------------------------------------------------------------------------
The primary goal of these scoping sessions is to have you identify
the specific environmental issues and concerns that should be
considered in the EA to be prepared for this project. Individual verbal
comments will be taken on a one-on-one basis with a court reporter.
This format is designed to receive the maximum amount of verbal
comments, in a convenient way during the timeframe allotted.
Each scoping session is scheduled from 4:30 p.m. to 7:30 p.m.
Eastern time. You may arrive at any time after 4:30 p.m. There will not
be a formal presentation by Commission staff when the session opens. If
you wish to speak, the Commission staff will hand out numbers in the
order of your arrival. Comments will be taken until 6:30 p.m. However,
if no additional numbers have been handed out and all individuals who
wish to provide comments have had an opportunity to do so, staff may
conclude the session at 7:00 p.m. Please see appendix 1 for additional
information on the session format and conduct.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of the appendices were sent to all
those receiving this notice in the mail and are available at
www.ferc.gov using the link called ``eLibrary'' or from the
Commission's Public Reference Room, 888 First Street NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------
Your scoping comments will be recorded by the court reporter (with
FERC staff or representative present) and become part of the public
record for this proceeding. Transcripts will be publicly available on
FERC's eLibrary system (see below for instructions on using eLibrary).
If a significant number of people are interested in providing verbal
comments in the one-on-one settings, a time limit of 5 minutes may be
implemented for each commentor.
It is important to note that verbal comments hold the same weight
as written or electronically submitted comments. Although there will
not be a formal presentation, Commission staff will be available
throughout the comment session to answer your questions about the
environmental review process. Representatives from Columbia will also
be present to answer project-specific questions.
Summary of the Planned Project
Columbia plans to replace Columbia's aging system with newer and
more reliable pipeline facilities in Vinton, Jackson, Gallia, and
Lawrence Counties, Ohio. The Project would provide about 275,000
dekatherms per day of additional firm natural gas transportation
capacity. According to Columbia, its project would ensure reliability
and flexibility for its firm storage and storage transportation
services on a system-wide basis.
The Buckeye Project would consist of the following facilities:
Install 65.7 miles of new, 36-inch-diameter natural gas
pipeline and various associated facilities including two tie-ins, four
new MLVs, suction and discharge lines to the Oak Hill Compressor
Station, and installation of over-pressure protection at five locations
(planned R-801 system);
abandon 58.8 miles of existing 20-inch-diameter natural
gas pipeline and associated facilities (R-501 system); and
abandon 2.0 miles of existing 20-inch-diameter and 24-
inch-diameter natural gas pipeline and associated facilities (R-500
system).
The general location of the project facilities is shown in appendix
2.
Land Requirements for Construction
Construction of the planned R-801 facilities would disturb about
1,220 acres of land for the aboveground facilities and the pipeline.
Abandonment of the existing R-500 and R-501 systems would affect about
979 acres. Following construction, Columbia would maintain about 402
acres for permanent operation of the project's new R-801 facilities;
the remaining acreage would be restored and revert to former uses.
About 80 percent of the planned pipeline route would parallel existing
pipeline, utility, or road rights-of-way.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. This process is referred to as scoping. The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. We will
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------
\2\ We, us, and our refer to the environmental staff of the
Commission's Office of Energy Projects.
---------------------------------------------------------------------------
[[Page 49014]]
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the planned project under these
general headings:
Geology and soils;
land use;
water resources, fisheries, and wetlands;
cultural resources;
vegetation and wildlife;
air quality and noise;
endangered and threatened species;
public safety; and
cumulative impacts.
We will also evaluate possible alternatives to the planned Project
or portions of the Project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Although no formal application has been filed, we have already
initiated our NEPA review under the Commission's pre-filing process.
The purpose of the pre-filing process is to encourage early involvement
of interested stakeholders and to identify and resolve issues before
the FERC receives an application. As part of our pre-filing review, we
have begun to contact some federal and state agencies to discuss their
involvement in the scoping process and the preparation of the EA.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Depending on
the comments received during the scoping process, we may also publish
and distribute the EA to the public for an allotted comment period. We
will consider all comments on the EA before we make our recommendations
to the Commission. To ensure we have the opportunity to consider and
address your comments, please carefully follow the instructions in the
Public Participation section, beginning on page 2.
With this notice, we are asking agencies with jurisdiction by law
and/or special expertise with respect to the environmental issues
related to this project to formally cooperate with us in the
preparation of the EA.\3\ Agencies that would like to request
cooperating agency status should follow the instructions for filing
comments provided under the Public Participation section of this
notice. Currently, the U.S. Army Corps of Engineers has expressed its
intention to participate as a cooperating agency in the preparation of
the EA to satisfy its NEPA responsibilities related to this project.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with the Ohio State Historic Preservation Office (SHPO), and to solicit
their views and those of other government agencies, interested Indian
tribes, and the public on the project's potential effects on historic
properties.\4\ We will define the project-specific Area of Potential
Effects (APE) in consultation with the SHPO as the project develops. On
natural gas facility projects, the APE at a minimum encompasses all
areas subject to ground disturbance (examples include construction
right-of-way, contractor/pipe storage yards, compressor stations, and
access roads). Our EA for this project will document our findings on
the impacts on historic properties and summarize the status of
consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Currently Identified Environmental Issues
We have already identified several issues that we think deserve
attention based on a preliminary review of the planned facilities and
the environmental information provided by Columbia. This preliminary
list of issues may change based on your comments and our analysis and
includes:
Agriculture and prime farmland;
water resources;
crossing of the Wayne National Forest;
endangered species; and
steep terrain.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
planned project.
If we publish and distribute the EA, copies of the EA will be sent
to the environmental mailing list for public review and comment. If you
would prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (appendix 3).
Becoming an Intervenor
Once Columbia files its application with the Commission, you may
want to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Motions to intervene are more fully described at
https://www.ferc.gov/resources/guides/how-to/intervene.asp. Instructions
for becoming an intervenor are in the Document-less Intervention Guide
under the e-filing link on the Commission's Web site. Please note that
the Commission will not accept requests for intervenor status at this
time. You must wait until the Commission receives a formal application
for the project.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., PF17-
6). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which
[[Page 49015]]
allows you to keep track of all formal issuances and submittals in
specific dockets. This can reduce the amount of time you spend
researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Finally, public sessions or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: October 16, 2017.
Kimberly D. Bose,
Secretary.