American Electric Power Service Corporation v. Midcontinent Independent System Operator, Inc.; Notice of Complaint, 48221-48222 [2017-22462]
Download as PDF
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 82, No. 199 / Tuesday, October 17, 2017 / Notices
Applicants: PacifiCorp, Nevada Power
Company, Sierra Pacific Power
Company, CalEnergy, LLC.
Description: Errata to June 30, 2016
Triennial Market Power Analysis and
Supplement for the Northwest Region of
the BHE Northwest Companies.
Filed Date: 10/6/17.
Accession Number: 20171006–5119.
Comments Due: 5 p.m. ET 10/27/17.
Docket Numbers: ER17–2179–001.
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing: 2017–
10–10 Remove Conceptual Statewide
Plan Compliance to be effective 9/27/
2017.
Filed Date: 10/10/17.
Accession Number: 20171010–5344.
Comments Due: 5 p.m. ET 10/31/17.
Docket Numbers: ER17–2379–001.
Applicants: Arizona Public Service
Company.
Description: Tariff Amendment:
Administrative Filing Amendment for
ER17–2379–000 to be effective 8/30/
2017.
Filed Date: 10/11/17.
Accession Number: 20171011–5170.
Comments Due: 5 p.m. ET 11/1/17.
Docket Numbers: ER18–49–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Service Agreement Recollation to be
effective 10/10/2017.
Filed Date: 10/10/17.
Accession Number: 20171010–5250.
Comments Due: 5 p.m. ET 10/31/17.
Docket Numbers: ER18–50–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Administrative Filing Amendment for
ER17–2379–000 to be effective 8/30/
2017.
Filed Date: 10/10/17.
Accession Number: 20171010–5265.
Comments Due: 5 p.m. ET 10/31/17.
Docket Numbers: ER18–51–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Interconnection Service Agreement No.
3808, Queue No. AB2–050 to be
effective 9/7/2017.
Filed Date: 10/10/17.
Accession Number: 20171010–5285.
Comments Due: 5 p.m. ET 10/31/17.
Docket Numbers: ER18–52–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original Service Agreement No. 4795;
Queue AC2–139 (WMPA) to be effective
9/8/2017.
Filed Date: 10/10/17.
VerDate Sep<11>2014
17:10 Oct 16, 2017
Jkt 244001
Accession Number: 20171010–5291.
Comments Due: 5 p.m. ET 10/31/17.
Docket Numbers: ER18–54–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
Balancing Accounts Update 2018
(TRBAA, RSBAA, ECRBAA) to be
effective 1/1/2018.
Filed Date: 10/10/17.
Accession Number: 20171010–5332.
Comments Due: 5 p.m. ET 10/31/17.
Docket Numbers: ER18–55–000.
Applicants: MP2 Energy LLC.
Description: § 205(d) Rate Filing:
Notice of Change in Category Seller
Status to be effective 10/12/2017.
Filed Date: 10/11/17.
Accession Number: 20171011–5083.
Comments Due: 5 p.m. ET 11/1/17.
Docket Numbers: ER18–56–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Consumers Energy Company.
Description: § 205(d) Rate Filing:
2017–10–11 Consumers Energy
Company’s Transmission Depreciation
Rates Filing to be effective 1/1/2018.
Filed Date: 10/11/17.
Accession Number: 20171011–5087.
Comments Due: 5 p.m. ET 11/1/17.
Docket Numbers: ER18–57–000.
Applicants: MP2 Energy NE LLC.
Description: § 205(d) Rate Filing:
Notice in Change in Category Seller to
be effective 10/12/2017.
Filed Date: 10/11/17.
Accession Number: 20171011–5091.
Comments Due: 5 p.m. ET 11/1/17.
Docket Numbers: ER18–58–000.
Applicants: Dyon LLC.
Description: Tariff Cancellation:
Notice of Cancellation to be effective
10/12/2017.
Filed Date: 10/11/17.
Accession Number: 20171011–5148.
Comments Due: 5 p.m. ET 11/1/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
48221
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 11, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–22460 Filed 10–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL18–7–000]
American Electric Power Service
Corporation v. Midcontinent
Independent System Operator, Inc.;
Notice of Complaint
Take notice that on October 10, 2017,
pursuant to section 206 of the Federal
Power Act, 16 U.S.C. 824(e), and Rule
206 of the Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.206,
American Electric Power Service
Corporation on behalf of its operating
company affiliates that are transmission
owners (TOs) in the PJM
Interconnection, L.L.C. (PJM) (together
AEP or Complainants) 1 filed a formal
complaint against Midcontinent
Independent System Operator, Inc.
(MISO or Respondent) alleging that
MISO failed to provide AEP and other
PJM TOs with more than $4.8 million of
revenues from Seams Elimination
Charge/Cost Adjustments/Assignments,
a non-bypassable surcharge designed to
recover all of the revenues lost due to
the elimination of through and out rates
on December 1, 2004 in the MISO/PJM
region, all as more fully explained in the
complaint.
AEP certifies that copies of the
complaint were served on the contacts
for the Midcontinent Independent
System Operator, Inc. as listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
1 American Electric Power Service Corporation
(AEPSC) is filing this Complaint on behalf of its
following operating company affiliates:
Appalachian Power Company, Indiana Michigan
Power Company, Kentucky Power Company,
Kingsport Power Company, Ohio Power Company,
and Wheeling Power Company.
E:\FR\FM\17OCN1.SGM
17OCN1
48222
Federal Register / Vol. 82, No. 199 / Tuesday, October 17, 2017 / Notices
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for electronic
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on October 30, 2017.
Dated: October 11, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–22462 Filed 10–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator and Foreign
Utility Company Status
Docket Nos.
sradovich on DSK3GMQ082PROD with NOTICES
SunE Beacon Site 2 LLC ............
Great Bay Solar I, LLC ................
Lackawanna Energy Center LLC
SunE Beacon Site 5 LLC ............
Rattlesnake Power, LLC ..............
Apple Blossom Wind, LLC ..........
Stuttgart Solar, LLC .....................
Cap Ridge Wind I, LLC ...............
Cap Ridge Wind II, LLC ..............
Cap Ridge Wind III, LLC .............
Cap Ridge Wind IV, LLC .............
Cap Ridge Interconnection, LLC
Aguaytia Energy del Peru SRL (I
Squared Capital).
EG17–122–000
EG17–123–000
EG17–124–000
EG17–125–000
EG17–126–000
EG17–127–000
EG17–130–000
EG17–131–000
EG17–132–000
EG17–133–000
EG17–134–000
EG17–135–000
FC17–4–000
Take notice that during the month of
September 2017, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a) (2017).
VerDate Sep<11>2014
17:10 Oct 16, 2017
Jkt 244001
Dated: October 11, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–22461 Filed 10–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–47–000]
Voyager Wind II, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Voyager
Wind II, LLC‘s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 31,
2017.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: October 11, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–22464 Filed 10–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL18–6–000]
FirstEnergy Service Company; Notice
of Waiver Request
Take notice that on October 6, 2017,
pursuant to rule 207 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practices and
Procedures 18 CFR 385.207, FirstEnergy
Service Company (Service Company),
submitted a request that the
Commission waive specified portions of
18 CFR 35.39 and any other rules and
regulations as may be necessary, to
allow Service Company to establish a
centralized RTO interface services group
to provide services to certain franchised
public utilities and market-regulated
power sales affiliates within the
FirstEnergy Corp. holding company
system, as more fully explained in its
waiver request.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
E:\FR\FM\17OCN1.SGM
17OCN1
Agencies
[Federal Register Volume 82, Number 199 (Tuesday, October 17, 2017)]
[Notices]
[Pages 48221-48222]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-22462]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL18-7-000]
American Electric Power Service Corporation v. Midcontinent
Independent System Operator, Inc.; Notice of Complaint
Take notice that on October 10, 2017, pursuant to section 206 of
the Federal Power Act, 16 U.S.C. 824(e), and Rule 206 of the Federal
Energy Regulatory Commission's (Commission) Rules of Practice and
Procedure, 18 CFR 385.206, American Electric Power Service Corporation
on behalf of its operating company affiliates that are transmission
owners (TOs) in the PJM Interconnection, L.L.C. (PJM) (together AEP or
Complainants) \1\ filed a formal complaint against Midcontinent
Independent System Operator, Inc. (MISO or Respondent) alleging that
MISO failed to provide AEP and other PJM TOs with more than $4.8
million of revenues from Seams Elimination Charge/Cost Adjustments/
Assignments, a non-bypassable surcharge designed to recover all of the
revenues lost due to the elimination of through and out rates on
December 1, 2004 in the MISO/PJM region, all as more fully explained in
the complaint.
---------------------------------------------------------------------------
\1\ American Electric Power Service Corporation (AEPSC) is
filing this Complaint on behalf of its following operating company
affiliates: Appalachian Power Company, Indiana Michigan Power
Company, Kentucky Power Company, Kingsport Power Company, Ohio Power
Company, and Wheeling Power Company.
---------------------------------------------------------------------------
AEP certifies that copies of the complaint were served on the
contacts for the Midcontinent Independent System Operator, Inc. as
listed on the Commission's list of Corporate Officials.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as
[[Page 48222]]
appropriate. The Respondent's answer and all interventions, or protests
must be filed on or before the comment date. The Respondent's answer,
motions to intervene, and protests must be served on the Complainants.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
eLibrary link and is available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the Web site that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on October 30, 2017.
Dated: October 11, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-22462 Filed 10-16-17; 8:45 am]
BILLING CODE 6717-01-P