American Electric Power Service Corporation v. Midcontinent Independent System Operator, Inc.; Notice of Complaint, 48221-48222 [2017-22462]

Download as PDF sradovich on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 82, No. 199 / Tuesday, October 17, 2017 / Notices Applicants: PacifiCorp, Nevada Power Company, Sierra Pacific Power Company, CalEnergy, LLC. Description: Errata to June 30, 2016 Triennial Market Power Analysis and Supplement for the Northwest Region of the BHE Northwest Companies. Filed Date: 10/6/17. Accession Number: 20171006–5119. Comments Due: 5 p.m. ET 10/27/17. Docket Numbers: ER17–2179–001. Applicants: California Independent System Operator Corporation. Description: Compliance filing: 2017– 10–10 Remove Conceptual Statewide Plan Compliance to be effective 9/27/ 2017. Filed Date: 10/10/17. Accession Number: 20171010–5344. Comments Due: 5 p.m. ET 10/31/17. Docket Numbers: ER17–2379–001. Applicants: Arizona Public Service Company. Description: Tariff Amendment: Administrative Filing Amendment for ER17–2379–000 to be effective 8/30/ 2017. Filed Date: 10/11/17. Accession Number: 20171011–5170. Comments Due: 5 p.m. ET 11/1/17. Docket Numbers: ER18–49–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Service Agreement Recollation to be effective 10/10/2017. Filed Date: 10/10/17. Accession Number: 20171010–5250. Comments Due: 5 p.m. ET 10/31/17. Docket Numbers: ER18–50–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Administrative Filing Amendment for ER17–2379–000 to be effective 8/30/ 2017. Filed Date: 10/10/17. Accession Number: 20171010–5265. Comments Due: 5 p.m. ET 10/31/17. Docket Numbers: ER18–51–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Interconnection Service Agreement No. 3808, Queue No. AB2–050 to be effective 9/7/2017. Filed Date: 10/10/17. Accession Number: 20171010–5285. Comments Due: 5 p.m. ET 10/31/17. Docket Numbers: ER18–52–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original Service Agreement No. 4795; Queue AC2–139 (WMPA) to be effective 9/8/2017. Filed Date: 10/10/17. VerDate Sep<11>2014 17:10 Oct 16, 2017 Jkt 244001 Accession Number: 20171010–5291. Comments Due: 5 p.m. ET 10/31/17. Docket Numbers: ER18–54–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: Balancing Accounts Update 2018 (TRBAA, RSBAA, ECRBAA) to be effective 1/1/2018. Filed Date: 10/10/17. Accession Number: 20171010–5332. Comments Due: 5 p.m. ET 10/31/17. Docket Numbers: ER18–55–000. Applicants: MP2 Energy LLC. Description: § 205(d) Rate Filing: Notice of Change in Category Seller Status to be effective 10/12/2017. Filed Date: 10/11/17. Accession Number: 20171011–5083. Comments Due: 5 p.m. ET 11/1/17. Docket Numbers: ER18–56–000. Applicants: Midcontinent Independent System Operator, Inc., Consumers Energy Company. Description: § 205(d) Rate Filing: 2017–10–11 Consumers Energy Company’s Transmission Depreciation Rates Filing to be effective 1/1/2018. Filed Date: 10/11/17. Accession Number: 20171011–5087. Comments Due: 5 p.m. ET 11/1/17. Docket Numbers: ER18–57–000. Applicants: MP2 Energy NE LLC. Description: § 205(d) Rate Filing: Notice in Change in Category Seller to be effective 10/12/2017. Filed Date: 10/11/17. Accession Number: 20171011–5091. Comments Due: 5 p.m. ET 11/1/17. Docket Numbers: ER18–58–000. Applicants: Dyon LLC. Description: Tariff Cancellation: Notice of Cancellation to be effective 10/12/2017. Filed Date: 10/11/17. Accession Number: 20171011–5148. Comments Due: 5 p.m. ET 11/1/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 48221 other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 11, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–22460 Filed 10–16–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL18–7–000] American Electric Power Service Corporation v. Midcontinent Independent System Operator, Inc.; Notice of Complaint Take notice that on October 10, 2017, pursuant to section 206 of the Federal Power Act, 16 U.S.C. 824(e), and Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206, American Electric Power Service Corporation on behalf of its operating company affiliates that are transmission owners (TOs) in the PJM Interconnection, L.L.C. (PJM) (together AEP or Complainants) 1 filed a formal complaint against Midcontinent Independent System Operator, Inc. (MISO or Respondent) alleging that MISO failed to provide AEP and other PJM TOs with more than $4.8 million of revenues from Seams Elimination Charge/Cost Adjustments/Assignments, a non-bypassable surcharge designed to recover all of the revenues lost due to the elimination of through and out rates on December 1, 2004 in the MISO/PJM region, all as more fully explained in the complaint. AEP certifies that copies of the complaint were served on the contacts for the Midcontinent Independent System Operator, Inc. as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as 1 American Electric Power Service Corporation (AEPSC) is filing this Complaint on behalf of its following operating company affiliates: Appalachian Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company, and Wheeling Power Company. E:\FR\FM\17OCN1.SGM 17OCN1 48222 Federal Register / Vol. 82, No. 199 / Tuesday, October 17, 2017 / Notices appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on October 30, 2017. Dated: October 11, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–22462 Filed 10–16–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator and Foreign Utility Company Status Docket Nos. sradovich on DSK3GMQ082PROD with NOTICES SunE Beacon Site 2 LLC ............ Great Bay Solar I, LLC ................ Lackawanna Energy Center LLC SunE Beacon Site 5 LLC ............ Rattlesnake Power, LLC .............. Apple Blossom Wind, LLC .......... Stuttgart Solar, LLC ..................... Cap Ridge Wind I, LLC ............... Cap Ridge Wind II, LLC .............. Cap Ridge Wind III, LLC ............. Cap Ridge Wind IV, LLC ............. Cap Ridge Interconnection, LLC Aguaytia Energy del Peru SRL (I Squared Capital). EG17–122–000 EG17–123–000 EG17–124–000 EG17–125–000 EG17–126–000 EG17–127–000 EG17–130–000 EG17–131–000 EG17–132–000 EG17–133–000 EG17–134–000 EG17–135–000 FC17–4–000 Take notice that during the month of September 2017, the status of the abovecaptioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission’s regulations. 18 CFR 366.7(a) (2017). VerDate Sep<11>2014 17:10 Oct 16, 2017 Jkt 244001 Dated: October 11, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–22461 Filed 10–16–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–47–000] Voyager Wind II, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Voyager Wind II, LLC‘s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is October 31, 2017. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 11, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–22464 Filed 10–16–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL18–6–000] FirstEnergy Service Company; Notice of Waiver Request Take notice that on October 6, 2017, pursuant to rule 207 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practices and Procedures 18 CFR 385.207, FirstEnergy Service Company (Service Company), submitted a request that the Commission waive specified portions of 18 CFR 35.39 and any other rules and regulations as may be necessary, to allow Service Company to establish a centralized RTO interface services group to provide services to certain franchised public utilities and market-regulated power sales affiliates within the FirstEnergy Corp. holding company system, as more fully explained in its waiver request. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the E:\FR\FM\17OCN1.SGM 17OCN1

Agencies

[Federal Register Volume 82, Number 199 (Tuesday, October 17, 2017)]
[Notices]
[Pages 48221-48222]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-22462]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL18-7-000]


American Electric Power Service Corporation v. Midcontinent 
Independent System Operator, Inc.; Notice of Complaint

    Take notice that on October 10, 2017, pursuant to section 206 of 
the Federal Power Act, 16 U.S.C. 824(e), and Rule 206 of the Federal 
Energy Regulatory Commission's (Commission) Rules of Practice and 
Procedure, 18 CFR 385.206, American Electric Power Service Corporation 
on behalf of its operating company affiliates that are transmission 
owners (TOs) in the PJM Interconnection, L.L.C. (PJM) (together AEP or 
Complainants) \1\ filed a formal complaint against Midcontinent 
Independent System Operator, Inc. (MISO or Respondent) alleging that 
MISO failed to provide AEP and other PJM TOs with more than $4.8 
million of revenues from Seams Elimination Charge/Cost Adjustments/
Assignments, a non-bypassable surcharge designed to recover all of the 
revenues lost due to the elimination of through and out rates on 
December 1, 2004 in the MISO/PJM region, all as more fully explained in 
the complaint.
---------------------------------------------------------------------------

    \1\ American Electric Power Service Corporation (AEPSC) is 
filing this Complaint on behalf of its following operating company 
affiliates: Appalachian Power Company, Indiana Michigan Power 
Company, Kentucky Power Company, Kingsport Power Company, Ohio Power 
Company, and Wheeling Power Company.
---------------------------------------------------------------------------

    AEP certifies that copies of the complaint were served on the 
contacts for the Midcontinent Independent System Operator, Inc. as 
listed on the Commission's list of Corporate Officials.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as

[[Page 48222]]

appropriate. The Respondent's answer and all interventions, or protests 
must be filed on or before the comment date. The Respondent's answer, 
motions to intervene, and protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
eLibrary link and is available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the Web site that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on October 30, 2017.

    Dated: October 11, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-22462 Filed 10-16-17; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.