City of Holyoke Gas & Electric Department; Notice Soliciting Scoping Comments, 48218-48219 [2017-22414]
Download as PDF
sradovich on DSK3GMQ082PROD with NOTICES
48218
Federal Register / Vol. 82, No. 199 / Tuesday, October 17, 2017 / Notices
following issues: (1) Is this collection
necessary to the proper functions of the
Department; (2) will this information be
processed and used in a timely manner;
(3) is the estimate of burden accurate;
(4) how might the Department enhance
the quality, utility, and clarity of the
information to be collected; and (5) how
might the Department minimize the
burden of this collection on the
respondents, including through the use
of information technology. Please note
that written comments received in
response to this notice will be
considered public records.
Title of Collection: Implementation of
Title I/II–A Program Initiatives.
OMB Control Number: 1850–0902.
Type of Review: A reinstatement of a
previously approved information
collection.
Respondents/Affected Public: State,
Local, and Tribal Governments.
Total Estimated Number of Annual
Responses: 770.
Total Estimated Number of Annual
Burden Hours: 821.
Abstract: The second round of data
collection for the Implementation of
Title I/II–A Program Initiatives study
will continue to examine the
implementation of policies promoted
through the Elementary and Secondary
Education Act (ESEA) at the state and
district levels, in four core areas: School
accountability and support for lowperforming schools, improving teacher
and leader effectiveness, state content
standards, and assessments. The first
round of data collection for this study
was conducted in Spring and Summer
2014.
The purpose of this follow-up data
collection is to provide policy makers
with detailed information on the core
policies promoted by Title I and Title
II–A being implemented at the state and
district levels, and the resources and
supports they provide to schools and
teachers. The timing of the data
collection is critical to provide early
information on the implementation of
the Every Student Succeeds Act (ESSA)
in the 2017–18 school year.
This study will rely on information
collected from existing sources, for
which there are no respondents or
burden, and on a set of revised state and
district surveys based on the 2014 data
collection in order to address the
study’s research questions. Extant data
sources include (a) the National
Assessment of Educational Progress
(NAEP) and (b) EDFacts data.
The revised surveys of states and
school districts will begin in March
2018. All respondents will have the
opportunity to complete an electronic
(e.g., web-based) survey (or paper
VerDate Sep<11>2014
17:10 Oct 16, 2017
Jkt 244001
survey, if preferred). The survey
respondents are described briefly below:
State Surveys: The state survey will
be sent to the chief state school officer
in each of the 50 states and the District
of Columbia. The state surveys will be
administered using an electronic
instrument divided into modules
corresponding to the four core areas.
School District Surveys. The school
district survey will be sent to school
superintendents from the same
nationally representative sample of 570
school districts that participated in the
2014 survey, as well as a new nationally
representative sample of 149 charter
school districts. The district survey will
be web-based and modularized,
corresponding to the four core areas, to
allow for completion by one or multiple
respondents.
Dated: October 12, 2017.
Stephanie Valentine,
Acting Director, Information Collection
Clearance Division, Office of the Chief Privacy
Officer, Office of Management.
[FR Doc. 2017–22445 Filed 10–16–17; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2386–004, Project No. 2387–
003, and Project No. 2388–004]
City of Holyoke Gas & Electric
Department; Notice Soliciting Scoping
Comments
Take notice that the following
hydroelectric applications have been
filed with the Commission and are
available for public inspection.
a. Type of Applications: Subsequent
Licenses.
b. Project Nos.: 2386–004, 2387–003,
and 2388–004.
c. Date filed: August 31, 2016.
d. Applicant: City of Holyoke Gas &
Electric Department.
e. Names of Projects: Holyoke Number
1 Hydro Project, P–2386–004; Holyoke
Number 2 Hydro Project, P–2387–003;
and Holyoke Number 3 Hydro Project,
P–2388–004.
f. Locations: Holyoke Number 1 (P–
2386–004) and Holyoke Number 2 (P–
2387–003) are located between the first
and second level canals, and Holyoke
Number 3 (P–2388–004) is located
between the second and third level
canals on the Holyoke Canal System
(Canal System), adjacent to the
Connecticut River, in the city of
Holyoke in Hampden County,
Massachusetts. The projects do not
occupy federal land.
PO 00000
Frm 00007
Fmt 4703
Sfmt 4703
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Paul Ducheney,
Superintendent, City of Holyoke Gas
and Electric Department, 99 Suffolk
Street, Holyoke, MA 01040, (413) 536–
9340 or ducheney@hged.com.
i. FERC Contact: Kyle Olcott, (202)
502–8963 or kyle.olcott@ferc.gov.
j. Deadline for filing scoping
comments: November 9, 2017.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket numbers P–2386–004,
P–2387–003, and/or P–2388–004.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. These applications are not ready for
environmental analysis at this time.
l. The City 1 project consists of: (1) An
intake at the wall of the First Level
Canal fed by the Canal System with two
14.7-foot-tall by 24.6-foot-wide
trashrack screens with 3.5-inch clear
spacing; (2) two parallel 10-footdiameter, 36.5-foot-long penstocks; (3) a
50-foot-long by 38-foot-wide brick
powerhouse with two 240-kilowatt and
two 288-kilowatt turbine generator
units; (4) two parallel 20-foot-wide,
328.5-foot-long brick arched tailrace
conduits discharging into the Second
Level Canal; and, (5) appurtenant
facilities. There is no transmission line
associated with the project as it is
located adjacent to the substation of
interconnection.
The City 2 project consists of: (1) An
intake at the wall of the First Level
Canal fed by the Canal System with
three trashrack screens (one 16.2-foot-
E:\FR\FM\17OCN1.SGM
17OCN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 82, No. 199 / Tuesday, October 17, 2017 / Notices
tall by 26.2-foot-wide and two 14.8-foottall by 21.8-foot-long) with 3-inch clear
spacing; (2) two 9-foot-diameter, 240foot-long penstocks; (3) a 17-foot-high
by 10-foot-diameter surge tank; (4) a 60foot-long by 40-foot-wide by 50-foot
high powerhouse with one 800-kilowatt
vertical turbine generator unit; (5) two
parallel 9-foot-wide, 10-foot-high, 120foot-long brick arched tailrace conduits
discharging into the Second Level
Canal; (6) an 800-foot-long, 4.8-kilovolt
transmission line; and (7) appurtenant
facilities.
The City 3 project consists of: (1) A
52.3-foot-long by 14-foot-high intake
trashrack covering an opening in the
Second Level Canal fed by the Canal
System; (2) two 11-foot-high by 11-footwide headgates; (3) two 85-foot-long, 93square-foot in cross section low pressure
brick penstocks; (4) a 42-foot-long by 34foot-wide by 28-foot-high reinforced
concrete powerhouse with one 450kilowatt turbine generator unit; (5) a
29.7-foot-wide, 10-foot-deep, 118-footlong open tailrace discharging into the
Third Level Canal; and, (6) 4.8-kilovolt
generator leads that connect directly to
the 4.8-kilovolt area distribution system;
and (7) appurtenant facilities.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to address the document.
For assistance, contact FERC Online
Support. A copy is available for
inspection and reproduction at the
address in Item H above.
n. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Scoping Process
The Commission staff intends to
prepare a single Environmental
Assessment (EA) for the Holyoke
Number 1 Hydro Project, Holyoke
Number 2 Hydro Project, and Holyoke
Number 3 Hydro Project in accordance
with the National Environmental Policy
Act. The EA will consider both sitespecific and cumulative environmental
impacts and reasonable alternatives to
the proposed action.
Commission staff does not propose to
conduct any on-site scoping meetings at
this time. Instead, we are soliciting
comments, recommendations, and
information on the Scoping Document
(SD) issued on October 10, 2017.
VerDate Sep<11>2014
17:10 Oct 16, 2017
Jkt 244001
Copies of the SD outlining the subject
areas to be addressed in the EA were
distributed to the parties on the
Commission’s mailing list and the
applicant’s distribution list. Copies of
the SD may be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call 1–866–
208–3676 or for TTY, (202) 502–8659.
Dated: October 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–22414 Filed 10–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP18–22–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: Compliance filing Leach
XPress Implementation, CP15–514 to be
effective 11/6/2017.
Filed Date: 10/6/17.
Accession Number: 20171006–5054.
Comments Due: 5 p.m. ET 10/18/17.
Docket Numbers: RP18–23–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: Petition for Limited
Tariff Waiver Due of Iroquois Gas
Transmission System, L.P.
Filed Date: 10/6/17.
Accession Number: 20171006–5084.
Comments Due: 5 p.m. ET 10/18/17.
Docket Numbers: RP18–24–000.
Applicants: Viking Gas Transmission
Company.
Description: § 4(d) Rate Filing: Update
Non-Conforming Agreements—
November 2017 to be effective
11/1/2017.
Filed Date: 10/6/17.
Accession Number: 20171006–5126.
Comments Due: 5 p.m. ET 10/18/17.
Docket Numbers: RP18–25–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated & Non-Conforming Service
Agreements—LXP to be effective
11/6/2017.
Filed Date: 10/6/17.
Accession Number: 20171006–5138.
PO 00000
Frm 00008
Fmt 4703
Sfmt 4703
48219
Comments Due: 5 p.m. ET 10/18/17.
Docket Numbers: RP18–26–000.
Applicants: Dominion Energy Questar
Pipeline, LLC.
Description: § 4(d) Rate Filing: QPC
Tariff Part 1 ? 5 Revision to be effective
12/1/2017.
Filed Date: 10/10/17.
Accession Number: 20171010–5022.
Comments Due: 5 p.m. ET 10/23/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 10, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–22416 Filed 10–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL18–9–000]
Xcel Energy Services Inc. v. Southwest
Power Pool, Inc.; Notice of Complaint
Take notice that on October 10, 2017,
Xcel Energy Services Inc.
(Complainant), on behalf of its public
utility affiliate Southwestern Public
Service Company (SPS), filed a formal
complaint against Southwest Power
Pool, Inc. (SPP or Respondent) pursuant
to sections 206 and 306 of the Federal
Power Act (FPA), 16 U.S.C. 824(e) and
825(e), and Rule 206 of the Rules of
Practice and Procedure of the Federal
Energy Regulatory Commission
(Commission), 18 CFR 385.206 (2017),
alleging that SPP has violated its Tariff
by assessing Attachment Z2 credit
payment obligations to SPS in a manner
that is inconsistent with the SPP Tariff,
violates the filed rate doctrine, is
inconsistent with SPS’s network
transmission service agreements with
E:\FR\FM\17OCN1.SGM
17OCN1
Agencies
[Federal Register Volume 82, Number 199 (Tuesday, October 17, 2017)]
[Notices]
[Pages 48218-48219]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-22414]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2386-004, Project No. 2387-003, and Project No. 2388-004]
City of Holyoke Gas & Electric Department; Notice Soliciting
Scoping Comments
Take notice that the following hydroelectric applications have been
filed with the Commission and are available for public inspection.
a. Type of Applications: Subsequent Licenses.
b. Project Nos.: 2386-004, 2387-003, and 2388-004.
c. Date filed: August 31, 2016.
d. Applicant: City of Holyoke Gas & Electric Department.
e. Names of Projects: Holyoke Number 1 Hydro Project, P-2386-004;
Holyoke Number 2 Hydro Project, P-2387-003; and Holyoke Number 3 Hydro
Project, P-2388-004.
f. Locations: Holyoke Number 1 (P-2386-004) and Holyoke Number 2
(P-2387-003) are located between the first and second level canals, and
Holyoke Number 3 (P-2388-004) is located between the second and third
level canals on the Holyoke Canal System (Canal System), adjacent to
the Connecticut River, in the city of Holyoke in Hampden County,
Massachusetts. The projects do not occupy federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Paul Ducheney, Superintendent, City of
Holyoke Gas and Electric Department, 99 Suffolk Street, Holyoke, MA
01040, (413) 536-9340 or ducheney@hged.com.
i. FERC Contact: Kyle Olcott, (202) 502-8963 or
kyle.olcott@ferc.gov.
j. Deadline for filing scoping comments: November 9, 2017.
The Commission strongly encourages electronic filing. Please file
scoping comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket numbers P-2386-004, P-2387-003, and/or P-2388-004.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. These applications are not ready for environmental analysis at
this time.
l. The City 1 project consists of: (1) An intake at the wall of the
First Level Canal fed by the Canal System with two 14.7-foot-tall by
24.6-foot-wide trashrack screens with 3.5-inch clear spacing; (2) two
parallel 10-foot-diameter, 36.5-foot-long penstocks; (3) a 50-foot-long
by 38-foot-wide brick powerhouse with two 240-kilowatt and two 288-
kilowatt turbine generator units; (4) two parallel 20-foot-wide, 328.5-
foot-long brick arched tailrace conduits discharging into the Second
Level Canal; and, (5) appurtenant facilities. There is no transmission
line associated with the project as it is located adjacent to the
substation of interconnection.
The City 2 project consists of: (1) An intake at the wall of the
First Level Canal fed by the Canal System with three trashrack screens
(one 16.2-foot-
[[Page 48219]]
tall by 26.2-foot-wide and two 14.8-foot-tall by 21.8-foot-long) with
3-inch clear spacing; (2) two 9-foot-diameter, 240-foot-long penstocks;
(3) a 17-foot-high by 10-foot-diameter surge tank; (4) a 60-foot-long
by 40-foot-wide by 50-foot high powerhouse with one 800-kilowatt
vertical turbine generator unit; (5) two parallel 9-foot-wide, 10-foot-
high, 120-foot-long brick arched tailrace conduits discharging into the
Second Level Canal; (6) an 800-foot-long, 4.8-kilovolt transmission
line; and (7) appurtenant facilities.
The City 3 project consists of: (1) A 52.3-foot-long by 14-foot-
high intake trashrack covering an opening in the Second Level Canal fed
by the Canal System; (2) two 11-foot-high by 11-foot-wide headgates;
(3) two 85-foot-long, 93-square-foot in cross section low pressure
brick penstocks; (4) a 42-foot-long by 34-foot-wide by 28-foot-high
reinforced concrete powerhouse with one 450-kilowatt turbine generator
unit; (5) a 29.7-foot-wide, 10-foot-deep, 118-foot-long open tailrace
discharging into the Third Level Canal; and, (6) 4.8-kilovolt generator
leads that connect directly to the 4.8-kilovolt area distribution
system; and (7) appurtenant facilities.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the eLibrary link.
Enter the docket number excluding the last three digits in the docket
number field to address the document. For assistance, contact FERC
Online Support. A copy is available for inspection and reproduction at
the address in Item H above.
n. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
o. Scoping Process
The Commission staff intends to prepare a single Environmental
Assessment (EA) for the Holyoke Number 1 Hydro Project, Holyoke Number
2 Hydro Project, and Holyoke Number 3 Hydro Project in accordance with
the National Environmental Policy Act. The EA will consider both site-
specific and cumulative environmental impacts and reasonable
alternatives to the proposed action.
Commission staff does not propose to conduct any on-site scoping
meetings at this time. Instead, we are soliciting comments,
recommendations, and information on the Scoping Document (SD) issued on
October 10, 2017.
Copies of the SD outlining the subject areas to be addressed in the
EA were distributed to the parties on the Commission's mailing list and
the applicant's distribution list. Copies of the SD may be viewed on
the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, call 1-866-208-3676 or
for TTY, (202) 502-8659.
Dated: October 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-22414 Filed 10-16-17; 8:45 am]
BILLING CODE 6717-01-P