Drawbridge Operation Regulation; Grand Lake, Calcasieu Parish, Louisiana, 47975 [2017-22292]
Download as PDF
Federal Register / Vol. 82, No. 198 / Monday, October 16, 2017 / Rules and Regulations
rescue, law enforcement, and
recreational.
The drawspan will be secured in the
closed-to-navigation position from 8
a.m. through noon on October 20, 2017,
to allow the bridge owner to install
necessary electrical equipment inside
the bridge machinery room and operator
house. This temporary deviation has
been coordinated with the waterway
users. No objections to the proposed
temporary deviation were raised.
Vessels able to pass through the
bridge in the closed position may do so
at any time. The bridge will not be able
to open for emergencies. Los Angeles
Harbor can be used as an alternate route
for vessels unable to pass through the
bridge in the closed position. The Coast
Guard will also inform the users of the
waterway through our Local and
Broadcast Notices to Mariners of the
change in operating schedule for the
bridge so vessel operators can arrange
their transits to minimize any impact
caused by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: October 10, 2017.
Carl T. Hausner,
District Bridge Chief, Eleventh Coast Guard
District.
[FR Doc. 2017–22293 Filed 10–13–17; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2017–0959]
Drawbridge Operation Regulation;
Grand Lake, Calcasieu Parish,
Louisiana
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Black Bayou
Pontoon Bridge on State Road 384
across the Gulf Intracoastal Waterway
(GIWW) at mile marker (MM) 237.5,
West of Harvey Locks (WHL) at Grand
Lake, Calcasieu Parish, Louisiana. The
deviation is necessary to make extensive
repairs to the bridge.
DATES: This deviation is effective
without actual notice from October 16,
jstallworth on DSKBBY8HB2PROD with RULES
SUMMARY:
VerDate Sep<11>2014
14:58 Oct 13, 2017
Jkt 244001
2017 until December 20, 2017. For the
purposes of enforcement, actual notice
will be used from October 9, 2017 until
October 16, 2017.
ADDRESSES: The docket for this
deviation, USCG–2017–0959 is available
at https://www.regulations.gov. Type the
docket number in the ‘‘SEARCH’’ box
and click ‘‘SEARCH’’. Click on Open
Docket Folder on the line associated
with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Douglas
Blakemore, Bridge Administration
Branch, Coast Guard; telephone 504–
671–2128, email Douglas.A.Blakemore@
uscg.mil.
SUPPLEMENTARY INFORMATION: Louisiana
Department of Transportation and
Development (LA–DOTD) has requested
to change the operating schedule that
governs the Black Bayou Pontoon Bridge
on State Road 384 across the Gulf
Intracoastal Waterway (GIWW) mile
237.5 West of Harvey Locks (WHL) at
Grand Lake, Calcasieu Parish,
Louisiana. Closures to navigation traffic
are required to make extensive repairs to
the bridge protective system, tower and
mechanical systems. This bridge
operates under 33 CFR 117.5.
This deviation allows the bridge to
close to vessel traffic during specific
dates and times from October 9, 2017
through December 20, 2017 as follows:
October 9–10, 2017 from 7 a.m. to 7
p.m.; October 18–19, 2017 from 7 a.m.
to 7 p.m.; October 23–26 from 8:30 a.m.
to 7 p.m.; October 30–31, 2017 from
8:30 a.m. to 7 p.m.; November 7, 2017
from 7 a.m. to 7 p.m.; November 17–18,
2017 from 8 a.m. to 7 p.m.; November
20–22 from 8 a.m. to 7 p.m.; November
27, 2017 from 8 a.m. to 7 p.m.;
November 28–30, 2017 from 8 a.m. to 7
p.m.; December 1–2, 2017 from 8 a.m.
to 7 p.m.; December 4–7, 2017 from 8
a.m. to 7 p.m.; December 11–12, 2017
from 8 a.m. to 7 p.m.; December 13,
2017 from 7 a.m. to 7 p.m.; December
14–16, 2017 from 8 a.m. to 7 p.m.;
December 18–19, 2017 from 8 a.m. to 7
p.m.
During the above periods of closures,
vessels will not be able to pass through
the bridge.
Navigation at the site primarily
consists of tugs and tows. The bridge
will be able to open to vessel traffic
during emergencies. The Coast Guard
will inform waterways users of the
bridge closures through Local and
Broadcast Notices to Mariners so that
vessel operators can arrange their
transits to minimize any impact caused
by the temporary deviation.
PO 00000
Frm 00023
Fmt 4700
Sfmt 4700
47975
In accordance with 33 CFR 117.35(e)
the drawbridge will return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulation is
authorized under 33 CFR 117.35.
Dated: October 10, 2017.
Douglas Allen Blakemore, Sr.,
Bridge Administrator, Eight Coast Guard
District.
[FR Doc. 2017–22292 Filed 10–13–17; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 155
[Docket No. USCG–2016–0437]
Update to Alternative Planning Criteria
National Guidelines
Coast Guard, Department of
Homeland Security.
ACTION: National guidelines; update.
AGENCY:
The Coast Guard announces
the availability of the updated
alternative planning criteria national
guidelines for vessel response plans
(VRPs). These national guidelines
provide the maritime industry with
updated information on developing and
submitting alternative planning criteria
(alternatives). Furthermore, they
facilitate consistency in the Coast
Guard’s review of proposed alternatives.
DATES: The updated alternative
planning criteria national guidelines are
available on October 16, 2017. The
Coast Guard recommends that new
alternatives and alternatives submitted
for renewal follow the updated
alternative planning criteria national
guidelines. Requests for extension of
currently accepted alternatives may be
approved for a period not to exceed six
months from the date of expiration.
ADDRESSES: MER Policy Letter 01–17:
Alternative Planning Criteria National
Guidelines for Vessel Response Plans is
available in our online docket at https://
www.regulations.gov, and on https://
homeport.uscg.mil under
Environmental > Vessel Response Plan
Program. Comments and material
received from the public, as well as
documents mentioned in this notice of
availability, are in our online docket at
https://www.regulations.gov and can be
viewed by following that Web site’s
instructions.
FOR FURTHER INFORMATION CONTACT: For
further information about this
SUMMARY:
E:\FR\FM\16OCR1.SGM
16OCR1
Agencies
[Federal Register Volume 82, Number 198 (Monday, October 16, 2017)]
[Rules and Regulations]
[Page 47975]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-22292]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2017-0959]
Drawbridge Operation Regulation; Grand Lake, Calcasieu Parish,
Louisiana
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Black Bayou Pontoon Bridge on State
Road 384 across the Gulf Intracoastal Waterway (GIWW) at mile marker
(MM) 237.5, West of Harvey Locks (WHL) at Grand Lake, Calcasieu Parish,
Louisiana. The deviation is necessary to make extensive repairs to the
bridge.
DATES: This deviation is effective without actual notice from October
16, 2017 until December 20, 2017. For the purposes of enforcement,
actual notice will be used from October 9, 2017 until October 16, 2017.
ADDRESSES: The docket for this deviation, USCG-2017-0959 is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Douglas Blakemore, Bridge
Administration Branch, Coast Guard; telephone 504-671-2128, email
Douglas.A.Blakemore@uscg.mil.
SUPPLEMENTARY INFORMATION: Louisiana Department of Transportation and
Development (LA-DOTD) has requested to change the operating schedule
that governs the Black Bayou Pontoon Bridge on State Road 384 across
the Gulf Intracoastal Waterway (GIWW) mile 237.5 West of Harvey Locks
(WHL) at Grand Lake, Calcasieu Parish, Louisiana. Closures to
navigation traffic are required to make extensive repairs to the bridge
protective system, tower and mechanical systems. This bridge operates
under 33 CFR 117.5.
This deviation allows the bridge to close to vessel traffic during
specific dates and times from October 9, 2017 through December 20, 2017
as follows: October 9-10, 2017 from 7 a.m. to 7 p.m.; October 18-19,
2017 from 7 a.m. to 7 p.m.; October 23-26 from 8:30 a.m. to 7 p.m.;
October 30-31, 2017 from 8:30 a.m. to 7 p.m.; November 7, 2017 from 7
a.m. to 7 p.m.; November 17-18, 2017 from 8 a.m. to 7 p.m.; November
20-22 from 8 a.m. to 7 p.m.; November 27, 2017 from 8 a.m. to 7 p.m.;
November 28-30, 2017 from 8 a.m. to 7 p.m.; December 1-2, 2017 from 8
a.m. to 7 p.m.; December 4-7, 2017 from 8 a.m. to 7 p.m.; December 11-
12, 2017 from 8 a.m. to 7 p.m.; December 13, 2017 from 7 a.m. to 7
p.m.; December 14-16, 2017 from 8 a.m. to 7 p.m.; December 18-19, 2017
from 8 a.m. to 7 p.m.
During the above periods of closures, vessels will not be able to
pass through the bridge.
Navigation at the site primarily consists of tugs and tows. The
bridge will be able to open to vessel traffic during emergencies. The
Coast Guard will inform waterways users of the bridge closures through
Local and Broadcast Notices to Mariners so that vessel operators can
arrange their transits to minimize any impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e) the drawbridge will return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulation is authorized under 33 CFR 117.35.
Dated: October 10, 2017.
Douglas Allen Blakemore, Sr.,
Bridge Administrator, Eight Coast Guard District.
[FR Doc. 2017-22292 Filed 10-13-17; 8:45 am]
BILLING CODE 9110-04-P