DTE Midstream Appalachia, LLC; Notice of Schedule for Environmental Review of the Birdsboro Pipeline Project, 47500-47501 [2017-22001]
Download as PDF
asabaliauskas on DSKBBXCHB2PROD with NOTICES
47500
Federal Register / Vol. 82, No. 196 / Thursday, October 12, 2017 / Notices
Jurisdictional Facilities, et al. of Pattern
Energy Group LP, et al. under EC17–
192.Energy Group Inc. and El Cabo
Wind LLC.
Filed Date: 10/4/17.
Accession Number: 20171004–5156.
Comments Due: 5 p.m. ET 10/18/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–2426–000.
Applicants: PSEG Keys Energy Center
LLC.
Description: Amendment to
September 1, 2017 PSEG Keys Energy
Center LLC tariff filing.
Filed Date: 10/4/17.
Accession Number: 20171004–5160.
Comments Due: 5 p.m. ET 10/25/17.
Docket Numbers: ER18–29–000.
Applicants: Public Service Company
of New Mexico.
Description: Notice of Cancellation of
Interconnection Agreement (Rate
Schedule No. 55) of Public Service
Company of New Mexico.
Filed Date: 10/5/17.
Accession Number: 20171005–5031.
Comments Due: 5 p.m. ET 10/26/17.
Docket Numbers: ER18–30–000.
Applicants: Mississippi Power
Company.
Description: § 205(d) Rate Filing:
MRA Shared Sevice Agreement (with
Cooperative Energy) Filing to be
effective 12/4/2017.
Filed Date: 10/5/17.
Accession Number: 20171005–5086.
Comments Due: 5 p.m. ET 10/26/17.
Docket Numbers: ER18–31–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Illinois Company.
Description: § 205(d) Rate Filing:
2017–10–05_SA 3028 Ameren IL-Prairie
Power Project#6 Yantisville to be
effective 10/6/2017.
Filed Date: 10/5/17.
Accession Number: 20171005–5099.
Comments Due: 5 p.m. ET 10/26/17.
Docket Numbers: ER18–32–000.
Applicants: Southern California
Edison Company.
Description: Tariff Cancellation:
Notice of Cancellation SCE and City of
Pasadena Letter Agreement to be
effective 12/5/2017.
Filed Date: 10/5/17.
Accession Number: 20171005–5101.
Comments Due: 5 p.m. ET 10/26/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
VerDate Sep<11>2014
22:35 Oct 11, 2017
Jkt 244001
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 5, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–22003 Filed 10–11–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–409–000]
DTE Midstream Appalachia, LLC;
Notice of Schedule for Environmental
Review of the Birdsboro Pipeline
Project
On May 1, 2017, DTE Midstream
Appalachia, LLC (DTE) filed an
application in Docket No. CP17–409–
000 requesting a Certificate of Public
Convenience and Necessity pursuant to
Section 7(c) of the Natural Gas Act to
construct and operate certain natural gas
pipeline facilities. The proposed project
is known as the Birdsboro Pipeline
Project (Project), and would provide
approximately 79 million cubic feet per
day of firm transportation service from
an interconnect with the Texas Eastern
Transmission Company pipeline system
to the Birdsboro Power Facility in
Birdsboro, Pennsylvania.
On May 9, 2017, the Federal Energy
Regulatory Commission (Commission or
FERC) issued its Notice of Application
for the Project. Among other things, that
notice alerted agencies issuing federal
authorizations of the requirement to
complete all necessary reviews and to
reach a final decision on a request for
a federal authorization within 90 days of
the date of issuance of the Commission
staff’s Environmental Assessment (EA)
for the Project. This instant notice
identifies the FERC staff’s planned
schedule for the completion of the EA
for the Project.
Schedule for Environmental Review
Issuance of EA—November 15, 2017
90-day Federal Authorization Decision
Deadline—February 13, 2018
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
DTE is seeking to construct and
operate approximately 13.2 miles of 12inch-diameter natural gas transmission
pipeline in Berks County, Pennsylvania.
The Project would also involve
construction of a new meter station and
appurtenant facilities. The Project
would deliver firm transportation
service from an interconnect with the
Texas Eastern Transmission Company
pipeline system in Rockland Township
to the Birdsboro Power Facility in the
Borough of Birdsboro.
Background
On January 18, 2017, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Planned Birdsboro Pipeline Project, and
Request for Comments on
Environmental Issues, and Notice of
Public Scoping Session (NOI). The NOI
was issued during the pre-filing review
of the Project in Docket No. PF17–1–000
and was sent to affected landowners;
federal, state, and local government
agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties; and local libraries
and newspapers. In response to the NOI,
the Commission received comments
from the U.S. Army Corps of Engineers,
the U.S. Environmental Protection
Agency, the Stockbridge Munsee Tribal
Historic Preservation Officer, the
Pennsylvania Department of
Environmental Protection, the
Pennsylvania Game Commission, Berks
County, and multiple non-governmental
organizations and members of the
public. The primary issues raised by the
commentors are cultural and historic
resources, including the Oley Township
Historic District; construction of the
non-jurisdictional Birdsboro Power
Plant; geologic concerns, including karst
terrain and blasting at an existing
quarry; and impacts on streams,
wetlands, and wildlife habitat.
The U.S. Army Corps of Engineers
and the U.S. Environmental Protection
Agency are cooperating agencies in the
preparation of the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
E:\FR\FM\12OCN1.SGM
12OCN1
Federal Register / Vol. 82, No. 196 / Thursday, October 12, 2017 / Notices
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the eLibrary
link, select General Search from the
eLibrary menu, enter the selected date
range and Docket Number excluding the
last three digits (i.e., CP17–409), and
follow the instructions. For assistance
with access to eLibrary, the helpline can
be reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
Web site also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
Dated: October 5, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–22001 Filed 10–11–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3102–025]
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Jason and Carol Victoria Presley;
Notice of Intent To File Subsequent
License Application, and Request To
Waive Pre-Filing Requirements
a. Type of Filing: Notice of Intent To
File Subsequent License Application
and Request To Waive Pre-Filing
Requirements.
b. Project No.: 3102–025.
c. Dated Filed: September 12, 2017.
d. Submitted By: Jason and Carol
Victoria Presley.
e. Name of Project: High Shoals
Project.
f. Location: On the Apalachee River in
Walton, Morgan, and Oconee Counties,
Georgia. The project does not occupy
federal lands.
g. Filed Pursuant to: Part 5 of the
Commission’s regulations. 18. CFR pt. 5
(2017).
h. Applicant Contact: Mr. Jason
Presley and Ms. Carol Victoria Presley,
110 Frazier Hill Road, Bishop, GA
30621, (706) 769–8293, email: jason@
presley.us, victoria@presley.us.
i. FERC Contact: Monte TerHaar at
(202) 502–6035 or email at
monte.terhaar@ferc.gov.
j. On September 12, 2017, Jason and
Carol Victoria Presley (licensee) filed a
VerDate Sep<11>2014
22:35 Oct 11, 2017
Jkt 244001
Notice of Intent to file a subsequent
license application (Notice of Intent),
and a request that the Commission
waive certain deadlines, as required by
the Commission’s regulations, for filing
the Notice of Intent, Pre-Application
Document (PAD), and request to use the
Traditional Licensing Process (TLP).1
The licensee requests waiver of the
Commission’s regulations to allow for
additional time to: (1) Consult with
agencies and stakeholders to support a
request to use the TLP; (2) compile
project documents for public inspection;
and (3) submit a PAD and request to use
the TLP. The licensee states that it plans
to submit its PAD and request to use the
TLP by October 31, 2017.
k. The licensee requests a waiver of
the Commission’s regulatory deadlines
for the Notice of Intent, PAD, and
Request to Use the TLP because of
exigent circumstances relating to the
death of the prior licensee and the
subsequent transfer of license to current
licensee.2
l. With this notice we are soliciting
comments on the licensee’s Notice of
Intent and request to waive certain prefiling requirements. All comments
should be sent to the address in
paragraph n below. Any individual or
entity interested in submitting
comments must do so within 30 days
from the date that the Commission
issues this notice.
m. The Notice of Intent, waiver
request, and associated filings are
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site
(https://www.ferc.gov), using the eLibrary
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
Register online at https://www.ferc.gov
/docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
n. The Commission strongly
encourages electronic filing. Please file
all documents using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
1 The licensee requests that sections 5.2, 5.3, 5.5,
5.6, 16.6, and 16.7 of the Commission’s regulations
be waived. 18 CFR 5.2, 5.3, 5.5, 5.6, 16.6, 16.7
(2017).
2 Gaynor L. Bracewell and John and Carol
Victoria Presley, 159 FERC 62,314 (2017).
PO 00000
Frm 00056
Fmt 4703
Sfmt 9990
47501
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov. In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–3102–025. All filings with
the Commission must bear the
appropriate heading: Comments on
Notice of Intent.
Dated: October 5, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–22006 Filed 10–11–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL17–79–000]
Tilton Energy LLC; Notice of Institution
of Section 206 Proceeding and Refund
Effective Date
On October 5, 2017, the Commission
issued an order in Docket No. EL17–79–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into whether the rates for Reactive
Supply and Voltage Control Service
(Reactive Service) of Tilton Energy LLC
may be unjust and unreasonable. Tilton
Energy LLC, 161 FERC 61,023 (2017).
The refund effective date in Docket
No. EL17–79–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL17–79–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426, in accordance with Rule 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214, within 21
days of the date of issuance of the order.
Dated: October 5, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–22008 Filed 10–11–17; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\12OCN1.SGM
12OCN1
Agencies
[Federal Register Volume 82, Number 196 (Thursday, October 12, 2017)]
[Notices]
[Pages 47500-47501]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-22001]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-409-000]
DTE Midstream Appalachia, LLC; Notice of Schedule for
Environmental Review of the Birdsboro Pipeline Project
On May 1, 2017, DTE Midstream Appalachia, LLC (DTE) filed an
application in Docket No. CP17-409-000 requesting a Certificate of
Public Convenience and Necessity pursuant to Section 7(c) of the
Natural Gas Act to construct and operate certain natural gas pipeline
facilities. The proposed project is known as the Birdsboro Pipeline
Project (Project), and would provide approximately 79 million cubic
feet per day of firm transportation service from an interconnect with
the Texas Eastern Transmission Company pipeline system to the Birdsboro
Power Facility in Birdsboro, Pennsylvania.
On May 9, 2017, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA--November 15, 2017
90-day Federal Authorization Decision Deadline--February 13, 2018
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
DTE is seeking to construct and operate approximately 13.2 miles of
12-inch-diameter natural gas transmission pipeline in Berks County,
Pennsylvania. The Project would also involve construction of a new
meter station and appurtenant facilities. The Project would deliver
firm transportation service from an interconnect with the Texas Eastern
Transmission Company pipeline system in Rockland Township to the
Birdsboro Power Facility in the Borough of Birdsboro.
Background
On January 18, 2017, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Planned Birdsboro Pipeline
Project, and Request for Comments on Environmental Issues, and Notice
of Public Scoping Session (NOI). The NOI was issued during the pre-
filing review of the Project in Docket No. PF17-1-000 and was sent to
affected landowners; federal, state, and local government agencies;
elected officials; environmental and public interest groups; Native
American tribes; other interested parties; and local libraries and
newspapers. In response to the NOI, the Commission received comments
from the U.S. Army Corps of Engineers, the U.S. Environmental
Protection Agency, the Stockbridge Munsee Tribal Historic Preservation
Officer, the Pennsylvania Department of Environmental Protection, the
Pennsylvania Game Commission, Berks County, and multiple non-
governmental organizations and members of the public. The primary
issues raised by the commentors are cultural and historic resources,
including the Oley Township Historic District; construction of the non-
jurisdictional Birdsboro Power Plant; geologic concerns, including
karst terrain and blasting at an existing quarry; and impacts on
streams, wetlands, and wildlife habitat.
The U.S. Army Corps of Engineers and the U.S. Environmental
Protection Agency are cooperating agencies in the preparation of the
EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you
[[Page 47501]]
spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC Web site (www.ferc.gov). Using the eLibrary link, select General
Search from the eLibrary menu, enter the selected date range and Docket
Number excluding the last three digits (i.e., CP17-409), and follow the
instructions. For assistance with access to eLibrary, the helpline can
be reached at (866) 208-3676, TTY (202) 502-8659, or at
FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC Web site also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: October 5, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-22001 Filed 10-11-17; 8:45 am]