New York Power Authority v. PJM Interconnection, L.L.C. and PJM Transmission Owners in Their Collective Capacity; Notice of Complaint, 47194-47195 [2017-21872]
Download as PDF
47194
Federal Register / Vol. 82, No. 195 / Wednesday, October 11, 2017 / Notices
Description: Section 205(d) Rate
Filing: Shelter Cove Improvement
District No. 1 IA and WDT SA (SA No.
382) to be effective 12/1/2017.
Filed Date: 9/29/17.
Accession Number: 20170929–5277.
Comments Due: 5 p.m. ET 10/20/17.
Docket Numbers: ER17–2582–000.
Applicants: New England Power Pool
Participants Committee.
Description: Section 205(d) Rate
Filing: Oct 2017 Membership Filing to
be effective 10/1/2017.
Filed Date: 9/29/17.
Accession Number: 20170929–5280.
Comments Due: 5 p.m. ET 10/20/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 29, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–21870 Filed 10–10–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL18–2–000, QF82–169–011]
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Applied Energy LLC; Notice of Waiver
Request
Take notice that on October 2, 2017,
pursuant to section 292.205(c) of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practices and Procedures implementing
the Public Utility Regulatory Policies
Act of 1978, as amended, 18 CFR
292.205(c) (2017), Applied Energy LLC
(Applied Energy) requested a limited
waiver of the operating standard set
forth in section 292.205(a)(1) of the
Commission’s regulations and the
efficiency standard set forth in section
292.205(a)(2) for the topping-cycle
VerDate Sep<11>2014
17:58 Oct 10, 2017
Jkt 244001
cogeneration facility owned and
operated by Applied Energy located at
the United States Marine Corps Recruit
Depot in San Diego, California.
Specifically, Applied Energy request
waiver of the operating and efficiency
standards for calendar years 2017 and
2018, as more fully explained in its
waiver request.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. This filing is accessible on-line
at https://www.ferc.gov, using the
eLibrary link and is available for review
in the Commission’s Public Reference
Room in Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on October 23, 2017.
Dated: October 4, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–21834 Filed 10–10–17; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL17–94–000]
New York Power Authority v. PJM
Interconnection, L.L.C. and PJM
Transmission Owners in Their
Collective Capacity; Notice of
Complaint
Take notice that on September 28,
2017, pursuant to sections 206, 306 1
and 309 of the Federal Power Act, and
Rule 206 of the Federal Energy
Regulatory Commission’s (Commission)
Rules of Practice and Procedure, 18 CFR
385.206 (2017). New York Power
Authority (NYPA) (Complainant) filed a
formal complaint against PJM
Interconnection, L.L.C. (PJM) and the
PJM Transmission Owners in their
Collective Capacity, (jointly
Respondents) alleging that, PJM’s
continued invoicing of NYPA for
monthly Regional Transmission
Expansion Plan charges associated with
the Hudson Transmission Project’s 320
MW of Firm Transmission Withdrawal
Rights following Hudson Transmission
Partners, LLC’s surrender of those rights
constitutes a violation of the PJM Open
Access Transmission Tariff and is
unjust, unreasonable, and unduly
discriminatory and preferential, all as
more fully explained in the complaint.
NYPA certifies that copies of the
complaint were served on the contacts
for PJM and the PJM Transmission
Owners in their Collective Capacity.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
1 16
Frm 00024
Fmt 4703
Sfmt 4703
E:\FR\FM\11OCN1.SGM
U.S.C. 824e, 825e and 825h (2012).
11OCN1
Federal Register / Vol. 82, No. 195 / Wednesday, October 11, 2017 / Notices
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on October 18, 2017.
Dated: September 29, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–21872 Filed 10–10–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–196–000.
Applicants: Kanstar Transmission,
LLC, Midwest Power Transmission
Arkansas, LLC.
Description: Application for Approval
of the Disposition of Jurisdictional
Facilities Under Section 203 of the
Federal Power Act of Kanstar
Transmission, LLC, et al.
Filed Date: 9/28/17.
Accession Number: 20170928–5181.
Comments Due: 5 p.m. ET 10/19/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–2029–002.
Applicants: Entergy Arkansas, Inc.
Description: Tariff Amendment: EAI–
ESI Reimbursement Agreement
Resumption to be effective 8/1/2017.
Filed Date: 9/29/17.
Accession Number: 20170929–5088.
Comments Due: 5 p.m. ET 10/20/17.
Docket Numbers: ER17–2030–002.
Applicants: Entergy Louisiana, LLC.
Description: Tariff Amendment: ELL–
ESI Reimbursement Agreement
Resumption to be effective 8/1/2017.
Filed Date: 9/29/17.
Accession Number: 20170929–5089.
Comments Due: 5 p.m. ET 10/20/17.
Docket Numbers: ER17–2031–002.
Applicants: Entergy Mississippi, Inc.
VerDate Sep<11>2014
17:58 Oct 10, 2017
Jkt 244001
Description: Tariff Amendment: EMI–
ESI Reimbursement Agreement
Resumption to be effective 8/1/2017.
Filed Date: 9/29/17.
Accession Number: 20170929–5090.
Comments Due: 5 p.m. ET 10/20/17.
Docket Numbers: ER17–2033–002.
Applicants: Entergy New Orleans, Inc.
Description: Tariff Amendment:
ENO–ESI Reimbursement Agreement
Resumption to be effective 8/1/2017.
Filed Date: 9/29/17.
Accession Number: 20170929–5091.
Comments Due: 5 p.m. ET 10/20/17.
Docket Numbers: ER17–2034–002.
Applicants: Entergy Texas, Inc.
Description: Tariff Amendment: ETI–
ESI Reimbursement Agreement
Resumption to be effective 8/1/2017.
Filed Date: 9/29/17.
Accession Number: 20170929–5092.
Comments Due: 5 p.m. ET 10/20/17.
Docket Numbers: ER17–2558–000.
Applicants: NTE Ohio, LLC.
Description: Baseline eTariff Filing:
Baseline new to be effective 12/1/2017.
Filed Date: 9/28/17.
Accession Number: 20170928–5147.
Comments Due: 5 p.m. ET 10/19/17.
Docket Numbers: ER17–2559–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2017–09–28 Salt River Project EIM
Implementation Agreement to be
effective 4/1/2018.
Filed Date: 9/28/17.
Accession Number: 20170928–5157.
Comments Due: 5 p.m. ET 10/19/17.
Docket Numbers: ER17–2560–000.
Applicants: Avista Corporation.
Description: § 205(d) Rate Filing:
Avista Corp NITSA BPA Kalispel SA
T–1140 to be effective 10/1/2017.
Filed Date: 9/28/17.
Accession Number: 20170928–5160.
Comments Due: 5 p.m. ET 10/19/17.
Docket Numbers: ER17–2561–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Pechanga IFA and DSA, SA Nos. 976
and 977 to be effective 10/1/2017.
Filed Date: 9/29/17.
Accession Number: 20170929–5000.
Comments Due: 5 p.m. ET 10/20/17.
Docket Numbers: ER17–2562–000.
Applicants: Cleco Power LLC.
Description: § 205(d) Rate Filing:
Amendment 2 to Interconnection
Agreement between Cleco and LAGEN
to be effective 10/1/2017.
Filed Date: 9/29/17.
Accession Number: 20170929–5067.
Comments Due: 5 p.m. ET 10/20/17.
The filings are accessible in the
Commission’s eLibrary system by
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
47195
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 29, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–21869 Filed 10–10–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–1–000.
Applicants: Friendswood Energy
Genco, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status.
Filed Date: 10/4/17.
Accession Number: 20171004–5058.
Comments Due: 5 p.m. ET 10/25/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–2292–001.
Applicants: Southampton Solar, LLC.
Description: Tariff Amendment:
Amendment to Tariff to be effective
10/6/2017.
Filed Date: 10/4/17.
Accession Number: 20171004–5133.
Comments Due: 5 p.m. ET 10/25/17.
Docket Numbers: ER18–22–000.
Applicants: PPL Electric Utilities
Corporation, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: PPL
submits revisions to OATT, Attachment
H–8G re: Depreciation Rate to be
effective 1/1/2018.
Filed Date: 10/4/17.
Accession Number: 20171004–5042.
Comments Due: 5 p.m. ET 10/25/17.
E:\FR\FM\11OCN1.SGM
11OCN1
Agencies
[Federal Register Volume 82, Number 195 (Wednesday, October 11, 2017)]
[Notices]
[Pages 47194-47195]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-21872]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL17-94-000]
New York Power Authority v. PJM Interconnection, L.L.C. and PJM
Transmission Owners in Their Collective Capacity; Notice of Complaint
Take notice that on September 28, 2017, pursuant to sections 206,
306 \1\ and 309 of the Federal Power Act, and Rule 206 of the Federal
Energy Regulatory Commission's (Commission) Rules of Practice and
Procedure, 18 CFR 385.206 (2017). New York Power Authority (NYPA)
(Complainant) filed a formal complaint against PJM Interconnection,
L.L.C. (PJM) and the PJM Transmission Owners in their Collective
Capacity, (jointly Respondents) alleging that, PJM's continued
invoicing of NYPA for monthly Regional Transmission Expansion Plan
charges associated with the Hudson Transmission Project's 320 MW of
Firm Transmission Withdrawal Rights following Hudson Transmission
Partners, LLC's surrender of those rights constitutes a violation of
the PJM Open Access Transmission Tariff and is unjust, unreasonable,
and unduly discriminatory and preferential, all as more fully explained
in the complaint.
---------------------------------------------------------------------------
\1\ 16 U.S.C. 824e, 825e and 825h (2012).
---------------------------------------------------------------------------
NYPA certifies that copies of the complaint were served on the
contacts for PJM and the PJM Transmission Owners in their Collective
Capacity.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. The Respondent's
answer and all interventions, or protests must be filed on or before
the comment date. The Respondent's answer, motions to intervene, and
protests must be served on the Complainants.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission,
[[Page 47195]]
888 First Street NE., Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the Web site that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on October 18, 2017.
Dated: September 29, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-21872 Filed 10-10-17; 8:45 am]
BILLING CODE 6717-01-P