New York Power Authority v. PJM Interconnection, L.L.C. and PJM Transmission Owners in Their Collective Capacity; Notice of Complaint, 47194-47195 [2017-21872]

Download as PDF 47194 Federal Register / Vol. 82, No. 195 / Wednesday, October 11, 2017 / Notices Description: Section 205(d) Rate Filing: Shelter Cove Improvement District No. 1 IA and WDT SA (SA No. 382) to be effective 12/1/2017. Filed Date: 9/29/17. Accession Number: 20170929–5277. Comments Due: 5 p.m. ET 10/20/17. Docket Numbers: ER17–2582–000. Applicants: New England Power Pool Participants Committee. Description: Section 205(d) Rate Filing: Oct 2017 Membership Filing to be effective 10/1/2017. Filed Date: 9/29/17. Accession Number: 20170929–5280. Comments Due: 5 p.m. ET 10/20/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and § 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 29, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–21870 Filed 10–10–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL18–2–000, QF82–169–011] asabaliauskas on DSKBBXCHB2PROD with NOTICES Applied Energy LLC; Notice of Waiver Request Take notice that on October 2, 2017, pursuant to section 292.205(c) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practices and Procedures implementing the Public Utility Regulatory Policies Act of 1978, as amended, 18 CFR 292.205(c) (2017), Applied Energy LLC (Applied Energy) requested a limited waiver of the operating standard set forth in section 292.205(a)(1) of the Commission’s regulations and the efficiency standard set forth in section 292.205(a)(2) for the topping-cycle VerDate Sep<11>2014 17:58 Oct 10, 2017 Jkt 244001 cogeneration facility owned and operated by Applied Energy located at the United States Marine Corps Recruit Depot in San Diego, California. Specifically, Applied Energy request waiver of the operating and efficiency standards for calendar years 2017 and 2018, as more fully explained in its waiver request. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on October 23, 2017. Dated: October 4, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–21834 Filed 10–10–17; 8:45 am] BILLING CODE 6717–01–P PO 00000 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL17–94–000] New York Power Authority v. PJM Interconnection, L.L.C. and PJM Transmission Owners in Their Collective Capacity; Notice of Complaint Take notice that on September 28, 2017, pursuant to sections 206, 306 1 and 309 of the Federal Power Act, and Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206 (2017). New York Power Authority (NYPA) (Complainant) filed a formal complaint against PJM Interconnection, L.L.C. (PJM) and the PJM Transmission Owners in their Collective Capacity, (jointly Respondents) alleging that, PJM’s continued invoicing of NYPA for monthly Regional Transmission Expansion Plan charges associated with the Hudson Transmission Project’s 320 MW of Firm Transmission Withdrawal Rights following Hudson Transmission Partners, LLC’s surrender of those rights constitutes a violation of the PJM Open Access Transmission Tariff and is unjust, unreasonable, and unduly discriminatory and preferential, all as more fully explained in the complaint. NYPA certifies that copies of the complaint were served on the contacts for PJM and the PJM Transmission Owners in their Collective Capacity. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 1 16 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\11OCN1.SGM U.S.C. 824e, 825e and 825h (2012). 11OCN1 Federal Register / Vol. 82, No. 195 / Wednesday, October 11, 2017 / Notices 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on October 18, 2017. Dated: September 29, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–21872 Filed 10–10–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission asabaliauskas on DSKBBXCHB2PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC17–196–000. Applicants: Kanstar Transmission, LLC, Midwest Power Transmission Arkansas, LLC. Description: Application for Approval of the Disposition of Jurisdictional Facilities Under Section 203 of the Federal Power Act of Kanstar Transmission, LLC, et al. Filed Date: 9/28/17. Accession Number: 20170928–5181. Comments Due: 5 p.m. ET 10/19/17. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER17–2029–002. Applicants: Entergy Arkansas, Inc. Description: Tariff Amendment: EAI– ESI Reimbursement Agreement Resumption to be effective 8/1/2017. Filed Date: 9/29/17. Accession Number: 20170929–5088. Comments Due: 5 p.m. ET 10/20/17. Docket Numbers: ER17–2030–002. Applicants: Entergy Louisiana, LLC. Description: Tariff Amendment: ELL– ESI Reimbursement Agreement Resumption to be effective 8/1/2017. Filed Date: 9/29/17. Accession Number: 20170929–5089. Comments Due: 5 p.m. ET 10/20/17. Docket Numbers: ER17–2031–002. Applicants: Entergy Mississippi, Inc. VerDate Sep<11>2014 17:58 Oct 10, 2017 Jkt 244001 Description: Tariff Amendment: EMI– ESI Reimbursement Agreement Resumption to be effective 8/1/2017. Filed Date: 9/29/17. Accession Number: 20170929–5090. Comments Due: 5 p.m. ET 10/20/17. Docket Numbers: ER17–2033–002. Applicants: Entergy New Orleans, Inc. Description: Tariff Amendment: ENO–ESI Reimbursement Agreement Resumption to be effective 8/1/2017. Filed Date: 9/29/17. Accession Number: 20170929–5091. Comments Due: 5 p.m. ET 10/20/17. Docket Numbers: ER17–2034–002. Applicants: Entergy Texas, Inc. Description: Tariff Amendment: ETI– ESI Reimbursement Agreement Resumption to be effective 8/1/2017. Filed Date: 9/29/17. Accession Number: 20170929–5092. Comments Due: 5 p.m. ET 10/20/17. Docket Numbers: ER17–2558–000. Applicants: NTE Ohio, LLC. Description: Baseline eTariff Filing: Baseline new to be effective 12/1/2017. Filed Date: 9/28/17. Accession Number: 20170928–5147. Comments Due: 5 p.m. ET 10/19/17. Docket Numbers: ER17–2559–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2017–09–28 Salt River Project EIM Implementation Agreement to be effective 4/1/2018. Filed Date: 9/28/17. Accession Number: 20170928–5157. Comments Due: 5 p.m. ET 10/19/17. Docket Numbers: ER17–2560–000. Applicants: Avista Corporation. Description: § 205(d) Rate Filing: Avista Corp NITSA BPA Kalispel SA T–1140 to be effective 10/1/2017. Filed Date: 9/28/17. Accession Number: 20170928–5160. Comments Due: 5 p.m. ET 10/19/17. Docket Numbers: ER17–2561–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Pechanga IFA and DSA, SA Nos. 976 and 977 to be effective 10/1/2017. Filed Date: 9/29/17. Accession Number: 20170929–5000. Comments Due: 5 p.m. ET 10/20/17. Docket Numbers: ER17–2562–000. Applicants: Cleco Power LLC. Description: § 205(d) Rate Filing: Amendment 2 to Interconnection Agreement between Cleco and LAGEN to be effective 10/1/2017. Filed Date: 9/29/17. Accession Number: 20170929–5067. Comments Due: 5 p.m. ET 10/20/17. The filings are accessible in the Commission’s eLibrary system by PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 47195 clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 29, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–21869 Filed 10–10–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG18–1–000. Applicants: Friendswood Energy Genco, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 10/4/17. Accession Number: 20171004–5058. Comments Due: 5 p.m. ET 10/25/17. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER17–2292–001. Applicants: Southampton Solar, LLC. Description: Tariff Amendment: Amendment to Tariff to be effective 10/6/2017. Filed Date: 10/4/17. Accession Number: 20171004–5133. Comments Due: 5 p.m. ET 10/25/17. Docket Numbers: ER18–22–000. Applicants: PPL Electric Utilities Corporation, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: PPL submits revisions to OATT, Attachment H–8G re: Depreciation Rate to be effective 1/1/2018. Filed Date: 10/4/17. Accession Number: 20171004–5042. Comments Due: 5 p.m. ET 10/25/17. E:\FR\FM\11OCN1.SGM 11OCN1

Agencies

[Federal Register Volume 82, Number 195 (Wednesday, October 11, 2017)]
[Notices]
[Pages 47194-47195]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-21872]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL17-94-000]


New York Power Authority v. PJM Interconnection, L.L.C. and PJM 
Transmission Owners in Their Collective Capacity; Notice of Complaint

    Take notice that on September 28, 2017, pursuant to sections 206, 
306 \1\ and 309 of the Federal Power Act, and Rule 206 of the Federal 
Energy Regulatory Commission's (Commission) Rules of Practice and 
Procedure, 18 CFR 385.206 (2017). New York Power Authority (NYPA) 
(Complainant) filed a formal complaint against PJM Interconnection, 
L.L.C. (PJM) and the PJM Transmission Owners in their Collective 
Capacity, (jointly Respondents) alleging that, PJM's continued 
invoicing of NYPA for monthly Regional Transmission Expansion Plan 
charges associated with the Hudson Transmission Project's 320 MW of 
Firm Transmission Withdrawal Rights following Hudson Transmission 
Partners, LLC's surrender of those rights constitutes a violation of 
the PJM Open Access Transmission Tariff and is unjust, unreasonable, 
and unduly discriminatory and preferential, all as more fully explained 
in the complaint.
---------------------------------------------------------------------------

    \1\ 16 U.S.C. 824e, 825e and 825h (2012).
---------------------------------------------------------------------------

    NYPA certifies that copies of the complaint were served on the 
contacts for PJM and the PJM Transmission Owners in their Collective 
Capacity.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests must be filed on or before 
the comment date. The Respondent's answer, motions to intervene, and 
protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission,

[[Page 47195]]

888 First Street NE., Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the Web site that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on October 18, 2017.

    Dated: September 29, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-21872 Filed 10-10-17; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.