System Energy Resources, Inc.; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 47199 [2017-21871]
Download as PDF
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Federal Register / Vol. 82, No. 195 / Wednesday, October 11, 2017 / Notices
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b) (2012).
h. Applicant Contact: Cole Rhoten,
677 Milford Hills Drive, Milford, OH
45150, telephone: (317) 945–3936;
email: C.Rhoten@outlook.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Jennifer Polardino, (202) 502–6437, or
email: Jennifer.Polardino@ferc.gov.
j. Deadline for filing comments,
protests, and motions to intervene is: 30
Days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file comments,
protests, and motions to intervene using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The first page of any filing should
include docket number DI17–9–000.
k. Description of Project: The
proposed run-of-river William H.
Harsha Lake Hydroelectric Project
would consist of: (1) An existing
William H. Harsha Dam; (2) an existing
conduit; (3) a 50–170 foot long conduit
extension with an end gate; (4) a
powerhouse built into the existing
spillway structure with a Pelton-turbine
generating unit with a generating
capacity of one megawatt; (5) a
transmission line connecting the
generating units with Cincinnati Gas
and Electric Company’s electric
distribution system; and (6) appurtenant
facilities. The area of the proposed
project is part of the East Fork State Park
and the dam is under the jurisdiction of
the U.S. Corps of Engineers.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the project would
affect the interests of interstate or
foreign commerce. The Commission also
determines whether or not the project:
(1) Would be located on a navigable
waterway; (2) would occupy public
lands or reservations of the United
States; (3) would utilize surplus water
or water power from a government dam;
VerDate Sep<11>2014
17:58 Oct 10, 2017
Jkt 244001
or (4) would be located on a nonnavigable stream over which Congress
has Commerce Clause jurisdiction and
would be constructed or enlarged after
1935.
l. Locations of the Application: This
filing may be viewed on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above and in the Commission’s Public
Reference Room located at 888 First
Street NE., Room 2A, Washington, DC
20426, or by calling (202) 502–8371.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must bear in all
capital letters the title COMMENTS,
PROTESTS, and MOTIONS TO
INTERVENE, as applicable, and the
Docket Number of the particular
application to which the filing refers. A
copy of any Motion to Intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
47199
Dated: October 4, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–21840 Filed 10–10–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL17–93–000]
System Energy Resources, Inc.; Notice
of Institution of Section 206
Proceeding and Refund Effective Date
On September 29, 2017, the
Commission issued an order in Docket
No. EL17–93–000, pursuant to section
206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an
investigation into whether the proposed
rate decreases of System Energy
Resources, Inc. may be unjust and
unreasonable. System Energy Resources,
Inc., 160 FERC ¶61,140 (2017).
The refund effective date in Docket
No. EL17–93–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL17–93–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426, in accordance with Rule 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2017),
within 21 days of the date of issuance
of the order.
Dated: September 29, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–21871 Filed 10–10–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14854–000]
Dominion Energy Services, Inc.; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On September 6, 2017, Dominion
Energy Services, Inc., filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Tazewell Hybrid
E:\FR\FM\11OCN1.SGM
11OCN1
Agencies
[Federal Register Volume 82, Number 195 (Wednesday, October 11, 2017)]
[Notices]
[Page 47199]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-21871]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL17-93-000]
System Energy Resources, Inc.; Notice of Institution of Section
206 Proceeding and Refund Effective Date
On September 29, 2017, the Commission issued an order in Docket No.
EL17-93-000, pursuant to section 206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an investigation into whether the
proposed rate decreases of System Energy Resources, Inc. may be unjust
and unreasonable. System Energy Resources, Inc., 160 FERC ]61,140
(2017).
The refund effective date in Docket No. EL17-93-000, established
pursuant to section 206(b) of the FPA, will be the date of publication
of this notice in the Federal Register.
Any interested person desiring to be heard in Docket No. EL17-93-
000 must file a notice of intervention or motion to intervene, as
appropriate, with the Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426, in accordance with Rule 214 of the
Commission's Rules of Practice and Procedure, 18 CFR 385.214 (2017),
within 21 days of the date of issuance of the order.
Dated: September 29, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-21871 Filed 10-10-17; 8:45 am]
BILLING CODE 6717-01-P