Cole Rhoten; Notice of Declaration of Intention and Soliciting Comments, Protests, and Motions To Intervene, 47198-47199 [2017-21840]
Download as PDF
asabaliauskas on DSKBBXCHB2PROD with NOTICES
47198
Federal Register / Vol. 82, No. 195 / Wednesday, October 11, 2017 / Notices
j. Deadline for filing comments,
protests, and motions to intervene is: 30
days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file comments,
protests, and motions to intervene using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number DI17–12–000.
k. Description of Project: The
proposed run-of-river Juniper Creek
Hydroelectric Project would consist of:
(1) A low-head diversion structure on
Juniper Creek; (2) a 16-inch-diameter,
1,125-foot-long buried penstock; (3) a
20-foot-wide, 20-foot-long powerhouse
containing a 320-kilowatt generating
unit; (4) a 40-foot-long tailrace returning
water to Juniper Creek; (5) a 1,700-footlong, 13.8-kilovolt underground
transmission line; (6) access trails; and
(7) appurtenant facilities.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the project would
affect the interests of interstate or
foreign commerce. The Commission also
determines whether or not the project:
(1) Would be located on a navigable
waterway; (2) would occupy public
lands or reservations of the United
States; (3) would utilize surplus water
or water power from a government dam;
or (4) would be located on a nonnavigable stream over which Congress
has Commerce Clause jurisdiction and
would be constructed or enlarged after
1935.
l. Locations of the Application: This
filing may be viewed on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
VerDate Sep<11>2014
17:58 Oct 10, 2017
Jkt 244001
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above and in the Commission’s Public
Reference Room located at 888 First
Street NE., Room 2A, Washington, DC
20426 or by calling (202) 502–8371.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must bear in all
capital letters the title COMMENTS,
PROTESTS, and MOTIONS TO
INTERVENE, as applicable, and the
Docket Number of the particular
application to which the filing refers. A
copy of any Motion to Intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Dated: October 4, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–21833 Filed 10–10–17; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL17–91–000]
Dynegy Lee II, LLC; Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
On October 4, 2017, the Commission
issued an order in Docket No. EL17–91–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into whether the proposed reactive
power rates of Dynegy Lee II, LLC may
be unjust and unreasonable. Dynegy Lee
II, LLC, 161 FERC ¶ 61,016 (2017).
The refund effective date in Docket
No. EL17–91–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL17–91–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426, in accordance with Rule 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2017),
within 21 days of the date of issuance
of the order.
Dated: October 4, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–21841 Filed 10–10–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI17–9–000]
Cole Rhoten; Notice of Declaration of
Intention and Soliciting Comments,
Protests, and Motions To Intervene
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No: DI17–9–000.
c. Date Filed: July 31, 2017.
d. Applicant: Cole Rhoten.
e. Name of Project: William H. Harsha
Lake Hydroelectric Project.
f. Location: The proposed William H.
Harsha Lake Hydroelectric Project
would be located on the East Fork of the
Little Miami River, near the Town of
Batavia, in Clermont County, Ohio.
E:\FR\FM\11OCN1.SGM
11OCN1
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Federal Register / Vol. 82, No. 195 / Wednesday, October 11, 2017 / Notices
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b) (2012).
h. Applicant Contact: Cole Rhoten,
677 Milford Hills Drive, Milford, OH
45150, telephone: (317) 945–3936;
email: C.Rhoten@outlook.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Jennifer Polardino, (202) 502–6437, or
email: Jennifer.Polardino@ferc.gov.
j. Deadline for filing comments,
protests, and motions to intervene is: 30
Days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file comments,
protests, and motions to intervene using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The first page of any filing should
include docket number DI17–9–000.
k. Description of Project: The
proposed run-of-river William H.
Harsha Lake Hydroelectric Project
would consist of: (1) An existing
William H. Harsha Dam; (2) an existing
conduit; (3) a 50–170 foot long conduit
extension with an end gate; (4) a
powerhouse built into the existing
spillway structure with a Pelton-turbine
generating unit with a generating
capacity of one megawatt; (5) a
transmission line connecting the
generating units with Cincinnati Gas
and Electric Company’s electric
distribution system; and (6) appurtenant
facilities. The area of the proposed
project is part of the East Fork State Park
and the dam is under the jurisdiction of
the U.S. Corps of Engineers.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the project would
affect the interests of interstate or
foreign commerce. The Commission also
determines whether or not the project:
(1) Would be located on a navigable
waterway; (2) would occupy public
lands or reservations of the United
States; (3) would utilize surplus water
or water power from a government dam;
VerDate Sep<11>2014
17:58 Oct 10, 2017
Jkt 244001
or (4) would be located on a nonnavigable stream over which Congress
has Commerce Clause jurisdiction and
would be constructed or enlarged after
1935.
l. Locations of the Application: This
filing may be viewed on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above and in the Commission’s Public
Reference Room located at 888 First
Street NE., Room 2A, Washington, DC
20426, or by calling (202) 502–8371.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must bear in all
capital letters the title COMMENTS,
PROTESTS, and MOTIONS TO
INTERVENE, as applicable, and the
Docket Number of the particular
application to which the filing refers. A
copy of any Motion to Intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
47199
Dated: October 4, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–21840 Filed 10–10–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL17–93–000]
System Energy Resources, Inc.; Notice
of Institution of Section 206
Proceeding and Refund Effective Date
On September 29, 2017, the
Commission issued an order in Docket
No. EL17–93–000, pursuant to section
206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an
investigation into whether the proposed
rate decreases of System Energy
Resources, Inc. may be unjust and
unreasonable. System Energy Resources,
Inc., 160 FERC ¶61,140 (2017).
The refund effective date in Docket
No. EL17–93–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL17–93–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426, in accordance with Rule 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2017),
within 21 days of the date of issuance
of the order.
Dated: September 29, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–21871 Filed 10–10–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14854–000]
Dominion Energy Services, Inc.; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On September 6, 2017, Dominion
Energy Services, Inc., filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Tazewell Hybrid
E:\FR\FM\11OCN1.SGM
11OCN1
Agencies
[Federal Register Volume 82, Number 195 (Wednesday, October 11, 2017)]
[Notices]
[Pages 47198-47199]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-21840]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. DI17-9-000]
Cole Rhoten; Notice of Declaration of Intention and Soliciting
Comments, Protests, and Motions To Intervene
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Declaration of Intention.
b. Docket No: DI17-9-000.
c. Date Filed: July 31, 2017.
d. Applicant: Cole Rhoten.
e. Name of Project: William H. Harsha Lake Hydroelectric Project.
f. Location: The proposed William H. Harsha Lake Hydroelectric
Project would be located on the East Fork of the Little Miami River,
near the Town of Batavia, in Clermont County, Ohio.
[[Page 47199]]
g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16
U.S.C. 817(b) (2012).
h. Applicant Contact: Cole Rhoten, 677 Milford Hills Drive,
Milford, OH 45150, telephone: (317) 945-3936; email:
C.Rhoten@outlook.com.
i. FERC Contact: Any questions on this notice should be addressed
to Jennifer Polardino, (202) 502-6437, or email:
Jennifer.Polardino@ferc.gov.
j. Deadline for filing comments, protests, and motions to intervene
is: 30 Days from the issuance date of this notice by the Commission.
The Commission strongly encourages electronic filing. Please file
comments, protests, and motions to intervene using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426. The first page of any
filing should include docket number DI17-9-000.
k. Description of Project: The proposed run-of-river William H.
Harsha Lake Hydroelectric Project would consist of: (1) An existing
William H. Harsha Dam; (2) an existing conduit; (3) a 50-170 foot long
conduit extension with an end gate; (4) a powerhouse built into the
existing spillway structure with a Pelton-turbine generating unit with
a generating capacity of one megawatt; (5) a transmission line
connecting the generating units with Cincinnati Gas and Electric
Company's electric distribution system; and (6) appurtenant facilities.
The area of the proposed project is part of the East Fork State Park
and the dam is under the jurisdiction of the U.S. Corps of Engineers.
When a Declaration of Intention is filed with the Federal Energy
Regulatory Commission, the Federal Power Act requires the Commission to
investigate and determine if the project would affect the interests of
interstate or foreign commerce. The Commission also determines whether
or not the project: (1) Would be located on a navigable waterway; (2)
would occupy public lands or reservations of the United States; (3)
would utilize surplus water or water power from a government dam; or
(4) would be located on a non-navigable stream over which Congress has
Commerce Clause jurisdiction and would be constructed or enlarged after
1935.
l. Locations of the Application: This filing may be viewed on the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the last three digits in the docket
number field to access the document. You may also register online at
https://www.ferc.gov/docs-filing/esubscription.asp to be notified via
email of new filings and issuances related to this or other pending
projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above and in the Commission's Public Reference Room located at 888
First Street NE., Room 2A, Washington, DC 20426, or by calling (202)
502-8371.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: All filings must
bear in all capital letters the title COMMENTS, PROTESTS, and MOTIONS
TO INTERVENE, as applicable, and the Docket Number of the particular
application to which the filing refers. A copy of any Motion to
Intervene must also be served upon each representative of the Applicant
specified in the particular application.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Dated: October 4, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-21840 Filed 10-10-17; 8:45 am]
BILLING CODE 6717-01-P