Ram Valley LLC; Notice of Declaration of Intention and Soliciting Comments, Protests, and Motions To Intervene, 47197-47198 [2017-21833]

Download as PDF Federal Register / Vol. 82, No. 195 / Wednesday, October 11, 2017 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 9968–002] asabaliauskas on DSKBBXCHB2PROD with NOTICES Massachusetts Water Resource Authority; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Applications: Exemption surrender. b. Project No.: 9968–002. c. Date Filed: September 18, 2017. d. Exemptee: Massachusetts Water Resource Authority (MWRA). e. Name of Projects: Aqueduct Transfer Project No. 9968. f. Location: City of Southborough, Worcester County, Massachusetts. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a—825r. h. Applicant Contact: Ms. Pamela Heidell, MWRA, 100 First Ave., Building 39, Boston, MA 02129, (617) 788–1102. i. FERC Contact: David Rudisail, (202) 502–6376, david.rudisail@ferc.gov. j. Deadline for filing comments, motions to intervene, protests, and recommendations is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please include the project number (P– 9968–002) on any comments, motions to intervene, protests, or recommendations filed. k. Description of Request: The project has had only intermittent use and has not generated power since June 7, 1995. MWRA has determined that the cost of maintaining the project is not economically feasible, and therefore, VerDate Sep<11>2014 17:58 Oct 10, 2017 Jkt 244001 petitioned to surrender the exemption. MWRA proposes maintain the valves to the turbine in an off position, lock out the electrical breaker from the generator, and disconnect the leads to the generator. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208- 3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE, as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene or protests should relate to project works PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 47197 which are the subject of the license proposed re-development. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: October 4, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–21836 Filed 10–10–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI17–12–000] Ram Valley LLC; Notice of Declaration of Intention and Soliciting Comments, Protests, and Motions To Intervene Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention. b. Docket No: DI17–12–000. c. Date Filed: September 22, 2017. d. Applicant: Ram Valley LLC. e. Name of Project: Juniper Creek Hydroelectric Project. f. Location: The proposed Juniper Creek Hydroelectric Project would be located near the Town of Shenandoah, in Schuylkill County, Pennsylvania. g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b) (2012). h. Applicant Contact: David Brailey, managing member, Ram Valley LLC, 3527 North Point Drive, Anchorage, AK 99502, telephone: (907) 248–0058; email: dbrailey@alaska.net; Agent Contact: David Brailey, owner, Brailey Hydrologic, 3527 North Point Drive, Anchorage, AK 99502, telephone: (907) 248–0058. i. FERC Contact: Any questions on this notice should be addressed to Jennifer Polardino, (202) 502–6437, or email: Jennifer.Polardino@ferc.gov. E:\FR\FM\11OCN1.SGM 11OCN1 asabaliauskas on DSKBBXCHB2PROD with NOTICES 47198 Federal Register / Vol. 82, No. 195 / Wednesday, October 11, 2017 / Notices j. Deadline for filing comments, protests, and motions to intervene is: 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file comments, protests, and motions to intervene using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number DI17–12–000. k. Description of Project: The proposed run-of-river Juniper Creek Hydroelectric Project would consist of: (1) A low-head diversion structure on Juniper Creek; (2) a 16-inch-diameter, 1,125-foot-long buried penstock; (3) a 20-foot-wide, 20-foot-long powerhouse containing a 320-kilowatt generating unit; (4) a 40-foot-long tailrace returning water to Juniper Creek; (5) a 1,700-footlong, 13.8-kilovolt underground transmission line; (6) access trails; and (7) appurtenant facilities. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the project would affect the interests of interstate or foreign commerce. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) would be located on a nonnavigable stream over which Congress has Commerce Clause jurisdiction and would be constructed or enlarged after 1935. l. Locations of the Application: This filing may be viewed on the Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. VerDate Sep<11>2014 17:58 Oct 10, 2017 Jkt 244001 For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above and in the Commission’s Public Reference Room located at 888 First Street NE., Room 2A, Washington, DC 20426 or by calling (202) 502–8371. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: All filings must bear in all capital letters the title COMMENTS, PROTESTS, and MOTIONS TO INTERVENE, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any Motion to Intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: October 4, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–21833 Filed 10–10–17; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL17–91–000] Dynegy Lee II, LLC; Notice of Institution of Section 206 Proceeding and Refund Effective Date On October 4, 2017, the Commission issued an order in Docket No. EL17–91– 000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into whether the proposed reactive power rates of Dynegy Lee II, LLC may be unjust and unreasonable. Dynegy Lee II, LLC, 161 FERC ¶ 61,016 (2017). The refund effective date in Docket No. EL17–91–000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. Any interested person desiring to be heard in Docket No. EL17–91–000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.214 (2017), within 21 days of the date of issuance of the order. Dated: October 4, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–21841 Filed 10–10–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI17–9–000] Cole Rhoten; Notice of Declaration of Intention and Soliciting Comments, Protests, and Motions To Intervene Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention. b. Docket No: DI17–9–000. c. Date Filed: July 31, 2017. d. Applicant: Cole Rhoten. e. Name of Project: William H. Harsha Lake Hydroelectric Project. f. Location: The proposed William H. Harsha Lake Hydroelectric Project would be located on the East Fork of the Little Miami River, near the Town of Batavia, in Clermont County, Ohio. E:\FR\FM\11OCN1.SGM 11OCN1

Agencies

[Federal Register Volume 82, Number 195 (Wednesday, October 11, 2017)]
[Notices]
[Pages 47197-47198]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-21833]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. DI17-12-000]


Ram Valley LLC; Notice of Declaration of Intention and Soliciting 
Comments, Protests, and Motions To Intervene

    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Declaration of Intention.
    b. Docket No: DI17-12-000.
    c. Date Filed: September 22, 2017.
    d. Applicant: Ram Valley LLC.
    e. Name of Project: Juniper Creek Hydroelectric Project.
    f. Location: The proposed Juniper Creek Hydroelectric Project would 
be located near the Town of Shenandoah, in Schuylkill County, 
Pennsylvania.
    g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 
U.S.C. 817(b) (2012).
    h. Applicant Contact: David Brailey, managing member, Ram Valley 
LLC, 3527 North Point Drive, Anchorage, AK 99502, telephone: (907) 248-
0058; email: dbrailey@alaska.net; Agent Contact: David Brailey, owner, 
Brailey Hydrologic, 3527 North Point Drive, Anchorage, AK 99502, 
telephone: (907) 248-0058.
    i. FERC Contact: Any questions on this notice should be addressed 
to Jennifer Polardino, (202) 502-6437, or email: 
Jennifer.Polardino@ferc.gov.

[[Page 47198]]

    j. Deadline for filing comments, protests, and motions to intervene 
is: 30 days from the issuance date of this notice by the Commission.
    The Commission strongly encourages electronic filing. Please file 
comments, protests, and motions to intervene using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE., Washington, DC 20426. The first page of any 
filing should include docket number DI17-12-000.
    k. Description of Project: The proposed run-of-river Juniper Creek 
Hydroelectric Project would consist of: (1) A low-head diversion 
structure on Juniper Creek; (2) a 16-inch-diameter, 1,125-foot-long 
buried penstock; (3) a 20-foot-wide, 20-foot-long powerhouse containing 
a 320-kilowatt generating unit; (4) a 40-foot-long tailrace returning 
water to Juniper Creek; (5) a 1,700-foot-long, 13.8-kilovolt 
underground transmission line; (6) access trails; and (7) appurtenant 
facilities.
    When a Declaration of Intention is filed with the Federal Energy 
Regulatory Commission, the Federal Power Act requires the Commission to 
investigate and determine if the project would affect the interests of 
interstate or foreign commerce. The Commission also determines whether 
or not the project: (1) Would be located on a navigable waterway; (2) 
would occupy public lands or reservations of the United States; (3) 
would utilize surplus water or water power from a government dam; or 
(4) would be located on a non-navigable stream over which Congress has 
Commerce Clause jurisdiction and would be constructed or enlarged after 
1935.
    l. Locations of the Application: This filing may be viewed on the 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. You may also register online at 
https://www.ferc.gov/docs-filing/esubscription.asp to be notified via 
email of new filings and issuances related to this or other pending 
projects. For assistance, call 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above and in the Commission's Public Reference Room located at 888 
First Street NE., Room 2A, Washington, DC 20426 or by calling (202) 
502-8371.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
and .214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: All filings must 
bear in all capital letters the title COMMENTS, PROTESTS, and MOTIONS 
TO INTERVENE, as applicable, and the Docket Number of the particular 
application to which the filing refers. A copy of any Motion to 
Intervene must also be served upon each representative of the Applicant 
specified in the particular application.
    p. Agency Comments: Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

    Dated: October 4, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-21833 Filed 10-10-17; 8:45 am]
 BILLING CODE 6717-01-P