Federal Register / Vol. 82, No. 195 / Wednesday, October 11, 2017 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 9968–002]
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Massachusetts Water Resource
Authority; Notice of Application
Accepted for Filing, Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Applications: Exemption
surrender.
b. Project No.: 9968–002.
c. Date Filed: September 18, 2017.
d. Exemptee: Massachusetts Water
Resource Authority (MWRA).
e. Name of Projects: Aqueduct
Transfer Project No. 9968.
f. Location: City of Southborough,
Worcester County, Massachusetts.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a—825r.
h. Applicant Contact: Ms. Pamela
Heidell, MWRA, 100 First Ave.,
Building 39, Boston, MA 02129, (617)
788–1102.
i. FERC Contact: David Rudisail, (202)
502–6376, david.rudisail@ferc.gov.
j. Deadline for filing comments,
motions to intervene, protests, and
recommendations is 30 days from the
issuance date of this notice by the
Commission. The Commission strongly
encourages electronic filing. Please file
motions to intervene, protests,
comments, or recommendations using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please include the project number (P–
9968–002) on any comments, motions to
intervene, protests, or recommendations
filed.
k. Description of Request: The project
has had only intermittent use and has
not generated power since June 7, 1995.
MWRA has determined that the cost of
maintaining the project is not
economically feasible, and therefore,
VerDate Sep<11>2014
17:58 Oct 10, 2017
Jkt 244001
petitioned to surrender the exemption.
MWRA proposes maintain the valves to
the turbine in an off position, lock out
the electrical breaker from the generator,
and disconnect the leads to the
generator.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
efiling.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208- 3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title COMMENTS,
PROTEST, or MOTION TO
INTERVENE, as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, motions to intervene or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene or
protests should relate to project works
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
47197
which are the subject of the license
proposed re-development. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: October 4, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–21836 Filed 10–10–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI17–12–000]
Ram Valley LLC; Notice of Declaration
of Intention and Soliciting Comments,
Protests, and Motions To Intervene
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No: DI17–12–000.
c. Date Filed: September 22, 2017.
d. Applicant: Ram Valley LLC.
e. Name of Project: Juniper Creek
Hydroelectric Project.
f. Location: The proposed Juniper
Creek Hydroelectric Project would be
located near the Town of Shenandoah,
in Schuylkill County, Pennsylvania.
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b) (2012).
h. Applicant Contact: David Brailey,
managing member, Ram Valley LLC,
3527 North Point Drive, Anchorage, AK
99502, telephone: (907) 248–0058;
email: dbrailey@alaska.net; Agent
Contact: David Brailey, owner, Brailey
Hydrologic, 3527 North Point Drive,
Anchorage, AK 99502, telephone: (907)
248–0058.
i. FERC Contact: Any questions on
this notice should be addressed to
Jennifer Polardino, (202) 502–6437, or
email: Jennifer.Polardino@ferc.gov.
E:\FR\FM\11OCN1.SGM
11OCN1
asabaliauskas on DSKBBXCHB2PROD with NOTICES
47198
Federal Register / Vol. 82, No. 195 / Wednesday, October 11, 2017 / Notices
j. Deadline for filing comments,
protests, and motions to intervene is: 30
days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file comments,
protests, and motions to intervene using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number DI17–12–000.
k. Description of Project: The
proposed run-of-river Juniper Creek
Hydroelectric Project would consist of:
(1) A low-head diversion structure on
Juniper Creek; (2) a 16-inch-diameter,
1,125-foot-long buried penstock; (3) a
20-foot-wide, 20-foot-long powerhouse
containing a 320-kilowatt generating
unit; (4) a 40-foot-long tailrace returning
water to Juniper Creek; (5) a 1,700-footlong, 13.8-kilovolt underground
transmission line; (6) access trails; and
(7) appurtenant facilities.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the project would
affect the interests of interstate or
foreign commerce. The Commission also
determines whether or not the project:
(1) Would be located on a navigable
waterway; (2) would occupy public
lands or reservations of the United
States; (3) would utilize surplus water
or water power from a government dam;
or (4) would be located on a nonnavigable stream over which Congress
has Commerce Clause jurisdiction and
would be constructed or enlarged after
1935.
l. Locations of the Application: This
filing may be viewed on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
VerDate Sep<11>2014
17:58 Oct 10, 2017
Jkt 244001
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above and in the Commission’s Public
Reference Room located at 888 First
Street NE., Room 2A, Washington, DC
20426 or by calling (202) 502–8371.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must bear in all
capital letters the title COMMENTS,
PROTESTS, and MOTIONS TO
INTERVENE, as applicable, and the
Docket Number of the particular
application to which the filing refers. A
copy of any Motion to Intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Dated: October 4, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–21833 Filed 10–10–17; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL17–91–000]
Dynegy Lee II, LLC; Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
On October 4, 2017, the Commission
issued an order in Docket No. EL17–91–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into whether the proposed reactive
power rates of Dynegy Lee II, LLC may
be unjust and unreasonable. Dynegy Lee
II, LLC, 161 FERC ¶ 61,016 (2017).
The refund effective date in Docket
No. EL17–91–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL17–91–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426, in accordance with Rule 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2017),
within 21 days of the date of issuance
of the order.
Dated: October 4, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–21841 Filed 10–10–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI17–9–000]
Cole Rhoten; Notice of Declaration of
Intention and Soliciting Comments,
Protests, and Motions To Intervene
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No: DI17–9–000.
c. Date Filed: July 31, 2017.
d. Applicant: Cole Rhoten.
e. Name of Project: William H. Harsha
Lake Hydroelectric Project.
f. Location: The proposed William H.
Harsha Lake Hydroelectric Project
would be located on the East Fork of the
Little Miami River, near the Town of
Batavia, in Clermont County, Ohio.
E:\FR\FM\11OCN1.SGM
11OCN1
Agencies
[Federal Register Volume 82, Number 195 (Wednesday, October 11, 2017)]
[Notices]
[Pages 47197-47198]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-21833]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. DI17-12-000]
Ram Valley LLC; Notice of Declaration of Intention and Soliciting
Comments, Protests, and Motions To Intervene
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Declaration of Intention.
b. Docket No: DI17-12-000.
c. Date Filed: September 22, 2017.
d. Applicant: Ram Valley LLC.
e. Name of Project: Juniper Creek Hydroelectric Project.
f. Location: The proposed Juniper Creek Hydroelectric Project would
be located near the Town of Shenandoah, in Schuylkill County,
Pennsylvania.
g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16
U.S.C. 817(b) (2012).
h. Applicant Contact: David Brailey, managing member, Ram Valley
LLC, 3527 North Point Drive, Anchorage, AK 99502, telephone: (907) 248-
0058; email: dbrailey@alaska.net; Agent Contact: David Brailey, owner,
Brailey Hydrologic, 3527 North Point Drive, Anchorage, AK 99502,
telephone: (907) 248-0058.
i. FERC Contact: Any questions on this notice should be addressed
to Jennifer Polardino, (202) 502-6437, or email:
Jennifer.Polardino@ferc.gov.
[[Page 47198]]
j. Deadline for filing comments, protests, and motions to intervene
is: 30 days from the issuance date of this notice by the Commission.
The Commission strongly encourages electronic filing. Please file
comments, protests, and motions to intervene using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC 20426. The first page of any
filing should include docket number DI17-12-000.
k. Description of Project: The proposed run-of-river Juniper Creek
Hydroelectric Project would consist of: (1) A low-head diversion
structure on Juniper Creek; (2) a 16-inch-diameter, 1,125-foot-long
buried penstock; (3) a 20-foot-wide, 20-foot-long powerhouse containing
a 320-kilowatt generating unit; (4) a 40-foot-long tailrace returning
water to Juniper Creek; (5) a 1,700-foot-long, 13.8-kilovolt
underground transmission line; (6) access trails; and (7) appurtenant
facilities.
When a Declaration of Intention is filed with the Federal Energy
Regulatory Commission, the Federal Power Act requires the Commission to
investigate and determine if the project would affect the interests of
interstate or foreign commerce. The Commission also determines whether
or not the project: (1) Would be located on a navigable waterway; (2)
would occupy public lands or reservations of the United States; (3)
would utilize surplus water or water power from a government dam; or
(4) would be located on a non-navigable stream over which Congress has
Commerce Clause jurisdiction and would be constructed or enlarged after
1935.
l. Locations of the Application: This filing may be viewed on the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the last three digits in the docket
number field to access the document. You may also register online at
https://www.ferc.gov/docs-filing/esubscription.asp to be notified via
email of new filings and issuances related to this or other pending
projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above and in the Commission's Public Reference Room located at 888
First Street NE., Room 2A, Washington, DC 20426 or by calling (202)
502-8371.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: All filings must
bear in all capital letters the title COMMENTS, PROTESTS, and MOTIONS
TO INTERVENE, as applicable, and the Docket Number of the particular
application to which the filing refers. A copy of any Motion to
Intervene must also be served upon each representative of the Applicant
specified in the particular application.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Dated: October 4, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-21833 Filed 10-10-17; 8:45 am]