University of Notre Dame; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 46978-46979 [2017-21730]

Download as PDF 46978 Federal Register / Vol. 82, No. 194 / Tuesday, October 10, 2017 / Notices Filed Date: 9/29/17. Accession Number: 20170929–5292. Comments Due: 5 p.m. ET 10/11/17. Docket Numbers: RP17–1141–000. Applicants: ConocoPhillips Company. Description: Petition of ConocoPhillips Company For Limited Waiver And Request For Expedited Action And Shortened Comment Period. Filed Date: 9/29/17. Accession Number: 20170929–5305. Comments Due: 5 p.m. ET 10/6/17. Docket Numbers: RP17–598–001. Applicants: Great Lakes Gas Transmission Limited Par. Description: Compliance filing Compliance to RP17–598 to be effective 10/1/2017. Filed Date: 9/29/17. Accession Number: 20170929–5116. Comments Due: 5 p.m. ET 10/11/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and § 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 2, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–21677 Filed 10–6–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission sradovich on DSK3GMQ082PROD with NOTICES [Project No. 7569–006] University of Notre Dame; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Application to amend 5 MW exemption from licensing. b. Project No.: 7569–006. VerDate Sep<11>2014 17:26 Oct 06, 2017 Jkt 244001 c. Date Filed: April 24, 2017, and supplemented on September 21, 2017. d. Applicant: University of Notre Dame. e. Name of Project: South Bend Hydroelectric Project. f. Location: The project is located on the St. Joseph River in St. Joseph County, Indiana. g. Filed Pursuant to: 18 CFR 4.104 (2016). h. Applicant Contact: Mr. Paul A. Kempf, University of Notre Dame, 100 Facilities Building, Notre Dame, IN 46556, (574) 631–0142. i. FERC Contact: Jennifer Polardino, (202) 502–6437, or Jennifer.Polardino@ ferc.gov. j. Deadline for filing comments, motions to intervene, protests, and recommendations is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please include the project number (P– 7569–006) on any comments, motions to intervene, protests, or recommendations filed. k. Project as Authorized: The South Bend project consists of: (1) An existing reservoir with a surface area of 150 acres and a storage capacity of 800 acre-feet at a pool elevation of 680 feet mean sea level; (2) an existing concrete and timber-crib dam approximately 18-feethigh and 435 feet long; (3) powerhouse containing one 50-kilowatt (kW) and two 890 kW generating units, for a total authorized capacity of 1,830 kW; and (4) appurtenant facilities. l. Description of Request: The exemptee requests approval to amend the exemption for the South Bend Hydroelectric Project with the following modifications to the project’s facilities: ten 250 kilowatt (kW) units for a total generating capacity of 2,500 kW; a 390foot-long conveyance channel, a coarse trash rack at the inlet to the conveyance channel; a secondary trash rack with a PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 traveling brush; and a 1.5 mile long, 1.47 kilovolt transmission line buried from the hydro site to the tie-in point at the Notre Dame campus. The proposed modifications would require changes to the project’s boundary. m. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. n. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. o. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. p. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as applicable; (2) set forth in the heading, the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works E:\FR\FM\10OCN1.SGM 10OCN1 Federal Register / Vol. 82, No. 194 / Tuesday, October 10, 2017 / Notices which are the subject of the license amendment. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: October 3, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–21730 Filed 10–6–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL18–4–000] sradovich on DSK3GMQ082PROD with NOTICES Notice of Petition for Partial Waiver; Indiana Municipal Power Agency, Indiana Utility Regulatory Commission Take notice that on October 3, 2017, pursuant to section 292.402 of the Federal Energy Regulatory Commission’s (Commission) Rules and Regulations,1 Indiana Municipal Power Agency (IMPA) on behalf of itself and its authorizing member municipal cities (Authorizing Members) that are nonregulated electric utilities, and the Indiana Utility Regulatory Commission (Indiana Commission) on behalf of those Authorizing Members subject to Indiana Commission rate regulation, filed a joint request for a partial waiver of certain obligations imposed on IMPA and its Authorizing Members through the Commission’s regulations 2 implementing section 210 of the Public Utility Regulatory Policies Act of 1978, as amended,3 as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the 1 18 CFR 292.402. CFR 292.303(a), .303(b). 3 16 U.S.C. 824a–3. 2 18 VerDate Sep<11>2014 17:26 Oct 06, 2017 Jkt 244001 Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comments: 5:00 p.m. Eastern Time on October 24, 2017. Dated: October 3, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–21728 Filed 10–6–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1342–004; ER10–1886–007; ER17–742–001. Applicants: CP Bloom Wind LLC, CP Energy Marketing (US) Inc., Decatur Energy Center, LLC. Description: Supplement to July 21, 2017 Notice of Change in Status and Limited Request for Privileged Treatment of CP Bloom Wind LLC, et al. Filed Date: 10/2/17. Accession Number: 20171002–5321. Comments Due: 5 p.m. ET 10/23/17. Docket Numbers: ER10–2564–007; ER10–2600–007; ER10–2289–007; EL17–9–000. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 46979 Applicants: Tucson Electric Power Company, UNS Electric, Inc., UniSource Energy Development Company, Central Hudson Gas & Electric Corporation. Description: Amendment to October 17, 2016 Notification of Changes in Status of Tucson Electric Power Company, et al. Filed Date: 9/25/17. Accession Number: 20170925–5121. Comments Due: 5 p.m. ET 10/16/17. Docket Numbers: ER17–2583–000. Applicants: Southwest Power Pool, Inc. Description: Informational Filing of True-Up and Final Rellocation of Revenue Requirements for the Balanced Portfolio of Southwest Power Pool, Inc. Filed Date: 9/29/17. Accession Number: 20170929–5330. Comments Due: 5 p.m. ET 10/20/17. Docket Numbers: ER18–12–000. Applicants: Midcontinent Independent System Operator, Inc., Northern States Power Company, a Minnesota corporation. Description: § 205(d) Rate Filing: 2017–10–02_Filing to revise NSP Attachment O for Abandoned Plant Incentive to be effective 12/1/2017. Filed Date: 10/2/17. Accession Number: 20171002–5246. Comments Due: 5 p.m. ET 10/23/17. Docket Numbers: ER18–13–000. Applicants: PPL Electric Utilities Corporation, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: PPL Electric submits ECSA, SA No. 4809 with MAIT to be effective 10/3/2017. Filed Date: 10/2/17. Accession Number: 20171002–5298. Comments Due: 5 p.m. ET 10/23/17. Docket Numbers: ER18–14–000. Applicants: Sierra Pacific Power Company. Description: § 205(d) Rate Filing: Rate Schedule No. 27—Annual BPA–GTA Update 2017 to be effective 10/31/2017. Filed Date: 10/2/17. Accession Number: 20171002–5299. Comments Due: 5 p.m. ET 10/23/17. Docket Numbers: ER18–15–000. Applicants: Westwood Generation, LLC. Description: Compliance filing: Westwood Generation, LLC Informational Filing and Request for Waiver to be effective 10/27/2017. Filed Date: 10/2/17. Accession Number: 20171002–5318. Comments Due: 5 p.m. ET 10/23/17. Docket Numbers: ER18–16–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Southwestern Public Service Company E:\FR\FM\10OCN1.SGM 10OCN1

Agencies

[Federal Register Volume 82, Number 194 (Tuesday, October 10, 2017)]
[Notices]
[Pages 46978-46979]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-21730]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 7569-006]


University of Notre Dame; Notice of Application Accepted for 
Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Application to amend 5 MW exemption from 
licensing.
    b. Project No.: 7569-006.
    c. Date Filed: April 24, 2017, and supplemented on September 21, 
2017.
    d. Applicant: University of Notre Dame.
    e. Name of Project: South Bend Hydroelectric Project.
    f. Location: The project is located on the St. Joseph River in St. 
Joseph County, Indiana.
    g. Filed Pursuant to: 18 CFR 4.104 (2016).
    h. Applicant Contact: Mr. Paul A. Kempf, University of Notre Dame, 
100 Facilities Building, Notre Dame, IN 46556, (574) 631-0142.
    i. FERC Contact: Jennifer Polardino, (202) 502-6437, or 
Jennifer.Polardino@ferc.gov.
    j. Deadline for filing comments, motions to intervene, protests, 
and recommendations is 30 days from the issuance date of this notice by 
the Commission.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, or recommendations using the 
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. Please include the project number (P-7569-006) on 
any comments, motions to intervene, protests, or recommendations filed.
    k. Project as Authorized: The South Bend project consists of: (1) 
An existing reservoir with a surface area of 150 acres and a storage 
capacity of 800 acre-feet at a pool elevation of 680 feet mean sea 
level; (2) an existing concrete and timber-crib dam approximately 18-
feet-high and 435 feet long; (3) powerhouse containing one 50-kilowatt 
(kW) and two 890 kW generating units, for a total authorized capacity 
of 1,830 kW; and (4) appurtenant facilities.
    l. Description of Request: The exemptee requests approval to amend 
the exemption for the South Bend Hydroelectric Project with the 
following modifications to the project's facilities: ten 250 kilowatt 
(kW) units for a total generating capacity of 2,500 kW; a 390-foot-long 
conveyance channel, a coarse trash rack at the inlet to the conveyance 
channel; a secondary trash rack with a traveling brush; and a 1.5 mile 
long, 1.47 kilovolt transmission line buried from the hydro site to the 
tie-in point at the Notre Dame campus. The proposed modifications would 
require changes to the project's boundary.
    m. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    n. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    o. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    p. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO 
INTERVENE as applicable; (2) set forth in the heading, the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions 
to intervene, or protests must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). All comments, 
motions to intervene, or protests should relate to project works

[[Page 46979]]

which are the subject of the license amendment. Agencies may obtain 
copies of the application directly from the applicant. A copy of any 
protest or motion to intervene must be served upon each representative 
of the applicant specified in the particular application. If an 
intervener files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency. A copy of all other filings in reference to 
this application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: October 3, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-21730 Filed 10-6-17; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.