University of Notre Dame; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 46978-46979 [2017-21730]
Download as PDF
46978
Federal Register / Vol. 82, No. 194 / Tuesday, October 10, 2017 / Notices
Filed Date: 9/29/17.
Accession Number: 20170929–5292.
Comments Due: 5 p.m. ET 10/11/17.
Docket Numbers: RP17–1141–000.
Applicants: ConocoPhillips Company.
Description: Petition of
ConocoPhillips Company For Limited
Waiver And Request For Expedited
Action And Shortened Comment Period.
Filed Date: 9/29/17.
Accession Number: 20170929–5305.
Comments Due: 5 p.m. ET 10/6/17.
Docket Numbers: RP17–598–001.
Applicants: Great Lakes Gas
Transmission Limited Par.
Description: Compliance filing
Compliance to RP17–598 to be effective
10/1/2017.
Filed Date: 9/29/17.
Accession Number: 20170929–5116.
Comments Due: 5 p.m. ET 10/11/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 2, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–21677 Filed 10–6–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sradovich on DSK3GMQ082PROD with NOTICES
[Project No. 7569–006]
University of Notre Dame; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Application to
amend 5 MW exemption from licensing.
b. Project No.: 7569–006.
VerDate Sep<11>2014
17:26 Oct 06, 2017
Jkt 244001
c. Date Filed: April 24, 2017, and
supplemented on September 21, 2017.
d. Applicant: University of Notre
Dame.
e. Name of Project: South Bend
Hydroelectric Project.
f. Location: The project is located on
the St. Joseph River in St. Joseph
County, Indiana.
g. Filed Pursuant to: 18 CFR 4.104
(2016).
h. Applicant Contact: Mr. Paul A.
Kempf, University of Notre Dame, 100
Facilities Building, Notre Dame, IN
46556, (574) 631–0142.
i. FERC Contact: Jennifer Polardino,
(202) 502–6437, or Jennifer.Polardino@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, protests, and
recommendations is 30 days from the
issuance date of this notice by the
Commission.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please include the project number (P–
7569–006) on any comments, motions to
intervene, protests, or recommendations
filed.
k. Project as Authorized: The South
Bend project consists of: (1) An existing
reservoir with a surface area of 150 acres
and a storage capacity of 800 acre-feet
at a pool elevation of 680 feet mean sea
level; (2) an existing concrete and
timber-crib dam approximately 18-feethigh and 435 feet long; (3) powerhouse
containing one 50-kilowatt (kW) and
two 890 kW generating units, for a total
authorized capacity of 1,830 kW; and (4)
appurtenant facilities.
l. Description of Request: The
exemptee requests approval to amend
the exemption for the South Bend
Hydroelectric Project with the following
modifications to the project’s facilities:
ten 250 kilowatt (kW) units for a total
generating capacity of 2,500 kW; a 390foot-long conveyance channel, a coarse
trash rack at the inlet to the conveyance
channel; a secondary trash rack with a
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
traveling brush; and a 1.5 mile long,
1.47 kilovolt transmission line buried
from the hydro site to the tie-in point at
the Notre Dame campus. The proposed
modifications would require changes to
the project’s boundary.
m. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
p. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title COMMENTS,
PROTEST, or MOTION TO INTERVENE
as applicable; (2) set forth in the
heading, the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
E:\FR\FM\10OCN1.SGM
10OCN1
Federal Register / Vol. 82, No. 194 / Tuesday, October 10, 2017 / Notices
which are the subject of the license
amendment. Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: October 3, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–21730 Filed 10–6–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL18–4–000]
sradovich on DSK3GMQ082PROD with NOTICES
Notice of Petition for Partial Waiver;
Indiana Municipal Power Agency,
Indiana Utility Regulatory Commission
Take notice that on October 3, 2017,
pursuant to section 292.402 of the
Federal Energy Regulatory
Commission’s (Commission) Rules and
Regulations,1 Indiana Municipal Power
Agency (IMPA) on behalf of itself and
its authorizing member municipal cities
(Authorizing Members) that are
nonregulated electric utilities, and the
Indiana Utility Regulatory Commission
(Indiana Commission) on behalf of those
Authorizing Members subject to Indiana
Commission rate regulation, filed a joint
request for a partial waiver of certain
obligations imposed on IMPA and its
Authorizing Members through the
Commission’s regulations 2
implementing section 210 of the Public
Utility Regulatory Policies Act of 1978,
as amended,3 as more fully explained in
the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
1 18
CFR 292.402.
CFR 292.303(a), .303(b).
3 16 U.S.C. 824a–3.
2 18
VerDate Sep<11>2014
17:26 Oct 06, 2017
Jkt 244001
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comments: 5:00 p.m. Eastern Time on
October 24, 2017.
Dated: October 3, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–21728 Filed 10–6–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1342–004;
ER10–1886–007; ER17–742–001.
Applicants: CP Bloom Wind LLC, CP
Energy Marketing (US) Inc., Decatur
Energy Center, LLC.
Description: Supplement to July 21,
2017 Notice of Change in Status and
Limited Request for Privileged
Treatment of CP Bloom Wind LLC, et al.
Filed Date: 10/2/17.
Accession Number: 20171002–5321.
Comments Due: 5 p.m. ET 10/23/17.
Docket Numbers: ER10–2564–007;
ER10–2600–007; ER10–2289–007;
EL17–9–000.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
46979
Applicants: Tucson Electric Power
Company, UNS Electric, Inc., UniSource
Energy Development Company, Central
Hudson Gas & Electric Corporation.
Description: Amendment to October
17, 2016 Notification of Changes in
Status of Tucson Electric Power
Company, et al.
Filed Date: 9/25/17.
Accession Number: 20170925–5121.
Comments Due: 5 p.m. ET 10/16/17.
Docket Numbers: ER17–2583–000.
Applicants: Southwest Power Pool,
Inc.
Description: Informational Filing of
True-Up and Final Rellocation of
Revenue Requirements for the Balanced
Portfolio of Southwest Power Pool, Inc.
Filed Date: 9/29/17.
Accession Number: 20170929–5330.
Comments Due: 5 p.m. ET 10/20/17.
Docket Numbers: ER18–12–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Northern States Power Company, a
Minnesota corporation.
Description: § 205(d) Rate Filing:
2017–10–02_Filing to revise NSP
Attachment O for Abandoned Plant
Incentive to be effective 12/1/2017.
Filed Date: 10/2/17.
Accession Number: 20171002–5246.
Comments Due: 5 p.m. ET 10/23/17.
Docket Numbers: ER18–13–000.
Applicants: PPL Electric Utilities
Corporation, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: PPL
Electric submits ECSA, SA No. 4809
with MAIT to be effective 10/3/2017.
Filed Date: 10/2/17.
Accession Number: 20171002–5298.
Comments Due: 5 p.m. ET 10/23/17.
Docket Numbers: ER18–14–000.
Applicants: Sierra Pacific Power
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 27—Annual BPA–GTA
Update 2017 to be effective 10/31/2017.
Filed Date: 10/2/17.
Accession Number: 20171002–5299.
Comments Due: 5 p.m. ET 10/23/17.
Docket Numbers: ER18–15–000.
Applicants: Westwood Generation,
LLC.
Description: Compliance filing:
Westwood Generation, LLC
Informational Filing and Request for
Waiver to be effective 10/27/2017.
Filed Date: 10/2/17.
Accession Number: 20171002–5318.
Comments Due: 5 p.m. ET 10/23/17.
Docket Numbers: ER18–16–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Southwestern Public Service Company
E:\FR\FM\10OCN1.SGM
10OCN1
Agencies
[Federal Register Volume 82, Number 194 (Tuesday, October 10, 2017)]
[Notices]
[Pages 46978-46979]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-21730]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7569-006]
University of Notre Dame; Notice of Application Accepted for
Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Application to amend 5 MW exemption from
licensing.
b. Project No.: 7569-006.
c. Date Filed: April 24, 2017, and supplemented on September 21,
2017.
d. Applicant: University of Notre Dame.
e. Name of Project: South Bend Hydroelectric Project.
f. Location: The project is located on the St. Joseph River in St.
Joseph County, Indiana.
g. Filed Pursuant to: 18 CFR 4.104 (2016).
h. Applicant Contact: Mr. Paul A. Kempf, University of Notre Dame,
100 Facilities Building, Notre Dame, IN 46556, (574) 631-0142.
i. FERC Contact: Jennifer Polardino, (202) 502-6437, or
Jennifer.Polardino@ferc.gov.
j. Deadline for filing comments, motions to intervene, protests,
and recommendations is 30 days from the issuance date of this notice by
the Commission.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, comments, or recommendations using the
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. Please include the project number (P-7569-006) on
any comments, motions to intervene, protests, or recommendations filed.
k. Project as Authorized: The South Bend project consists of: (1)
An existing reservoir with a surface area of 150 acres and a storage
capacity of 800 acre-feet at a pool elevation of 680 feet mean sea
level; (2) an existing concrete and timber-crib dam approximately 18-
feet-high and 435 feet long; (3) powerhouse containing one 50-kilowatt
(kW) and two 890 kW generating units, for a total authorized capacity
of 1,830 kW; and (4) appurtenant facilities.
l. Description of Request: The exemptee requests approval to amend
the exemption for the South Bend Hydroelectric Project with the
following modifications to the project's facilities: ten 250 kilowatt
(kW) units for a total generating capacity of 2,500 kW; a 390-foot-long
conveyance channel, a coarse trash rack at the inlet to the conveyance
channel; a secondary trash rack with a traveling brush; and a 1.5 mile
long, 1.47 kilovolt transmission line buried from the hydro site to the
tie-in point at the Notre Dame campus. The proposed modifications would
require changes to the project's boundary.
m. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
n. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
o. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
p. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO
INTERVENE as applicable; (2) set forth in the heading, the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions
to intervene, or protests must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). All comments,
motions to intervene, or protests should relate to project works
[[Page 46979]]
which are the subject of the license amendment. Agencies may obtain
copies of the application directly from the applicant. A copy of any
protest or motion to intervene must be served upon each representative
of the applicant specified in the particular application. If an
intervener files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency. A copy of all other filings in reference to
this application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Dated: October 3, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-21730 Filed 10-6-17; 8:45 am]
BILLING CODE 6717-01-P