California Public Utilities Commission, Transmission Agency of Northern California, Sacramento Municipal Utility District, M-S-R Public Power Agency, City of Santa Clara, California, State Water Contractors, Modesto Irrigation District, Northern California Power Agency v. Pacific Gas and Electric Company; Notice of Complaint, 46973-46974 [2017-21725]

Download as PDF sradovich on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 82, No. 194 / Tuesday, October 10, 2017 / Notices Accession Number: 20170922–5177. Comments Due: 5 p.m. ET 10/6/17. Docket Numbers: ER18–1–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2017–09–29 Reliability Services Phase 1b and 2 Amendment to be effective 2/15/2018. Filed Date: 10/2/17. Accession Number: 20171002–5000. Comments Due: 5 p.m. ET 10/23/17. Docket Numbers: ER18–2–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of Original Service Agreement No. 4625, Queue No. AB1–164 to be effective 10/1/2017. Filed Date: 10/2/17. Accession Number: 20171002–5087. Comments Due: 5 p.m. ET 10/23/17. Docket Numbers: ER18–3–000. Applicants: Nylon Corporation of America. Description: Baseline eTariff Filing: Application of Nylon Corporation of America for MBR Authorization to be effective 12/1/2017. Filed Date: 10/2/17. Accession Number: 20171002–5089. Comments Due: 5 p.m. ET 10/23/17. Docket Numbers: ER18–4–000. Applicants: Mid-Atlantic Interstate Transmission, LLC. Description: § 205(d) Rate Filing: MAIT submits Interconnection Agreement SA No. 4578 to be effective 12/2/2017. Filed Date: 10/2/17. Accession Number: 20171002–5111. Comments Due: 5 p.m. ET 10/23/17. Docket Numbers: ER18–5–000. Applicants: PacifiCorp. Description: Tariff Cancellation: Term of PacifiCorp Energy Construction Agmt ? Pavant 2 to be effective 12/11/2017. Filed Date: 10/2/17. Accession Number: 20171002–5160. Comments Due: 5 p.m. ET 10/23/17. Docket Numbers: ER18–6–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: SCE and CDWR Amended Cherry Valley SA and Amended Crafton Hills SA to be effective 12/1/2017. Filed Date: 10/2/17. Accession Number: 20171002–5161. Comments Due: 5 p.m. ET 10/23/17. Docket Numbers: ER18–7–000. Applicants: Lamarr Energy, LLC. Description: Baseline eTariff Filing: Market Based Rate Tariff to be effective 12/1/2017. Filed Date: 10/2/17. Accession Number: 20171002–5162. VerDate Sep<11>2014 17:26 Oct 06, 2017 Jkt 244001 Comments Due: 5 p.m. ET 10/23/17. Docket Numbers: ER18–8–000. Applicants: Tucson Electric Power Company. Description: § 205(d) Rate Filing: Cancellation of Rate Schedule Nos. 89 and 90 to be effective 12/31/2017. Filed Date: 10/2/17. Accession Number: 20171002–5168. Comments Due: 5 p.m. ET 10/23/17. Docket Numbers: ER18–9–000. Applicants: BE Alabama LLC. Description: Tariff Cancellation: MBR Tariff cancellation to be effective 12/1/2017. Filed Date: 10/2/17. Accession Number: 20171002–5243. Comments Due: 5 p.m. ET 10/23/17. Docket Numbers: ER18–10–000. Applicants: Utility Contract Funding, L.L.C. Description: Tariff Cancellation: MBR tariff cancellation to be effective 12/1/2017. Filed Date: 10/2/17. Accession Number: 20171002–5244. Comments Due: 5 p.m. ET 10/23/17. Docket Numbers: ER18–11–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1313R10 Oklahoma Gas and Electric Company NITSA and NOA to be effective 9/1/2017. Filed Date: 10/2/17. Accession Number: 20171002–5245. Comments Due: 5 p.m. ET 10/23/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 2, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–21676 Filed 10–6–17; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 46973 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL17–95–000] California Public Utilities Commission, Transmission Agency of Northern California, Sacramento Municipal Utility District, M–S–R Public Power Agency, City of Santa Clara, California, State Water Contractors, Modesto Irrigation District, Northern California Power Agency v. Pacific Gas and Electric Company; Notice of Complaint Take notice that on September 29, 2017, the California Public Utilities Commission, Transmission Agency of Northern California, Sacramento Municipal Utility District, M–S–R Public Power Agency, City of Santa Clara, California, doing business as Silicon Valley Power, State Water Contractors, Modesto Irrigation District, and Northern California Power Agency (collectively, Complainants) filed a formal complaint against Pacific Gas and Electric Company (Respondent) pursuant to section 206 of the Federal Power Act, 16 U.S.C. 824(e), 825(e) (2012), and Rule 206 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (Commission), 18 CFR 385.206 (2017), alleging that Respondent’s proposed Transmission Owner (TO) rates substantially exceed its cost of service and may well exceed the revenue requirement comprising its last clean rate. Complainants request that the Commission order an investigation into Respondent’s TO rates and exercise its authority to establish the earliest possible refund effective date, all as more fully explained in the complaint. Complainants certify that copies of the complaint were served on the contact for PG&E. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR 385.211, 385.214 (2017). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests, must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and E:\FR\FM\10OCN1.SGM 10OCN1 46974 Federal Register / Vol. 82, No. 194 / Tuesday, October 10, 2017 / Notices interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on October 19, 2017. Dated: October 2, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–21725 Filed 10–6–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–496–000] sradovich on DSK3GMQ082PROD with NOTICES Texas Eastern Transmission, LP; Notice of Request Under Blanket Authorization Take notice that on September 28, 2017, Texas Eastern Transmission, LP (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056–5310, filed in Docket No. CP17–496–000 a prior notice request pursuant to sections 157.205 and 157.208 of the Commission’s regulations under the Natural Gas Act (NGA), and Columbia’s blanket certificate issued in Docket No. CP82– 535–000, to offset and replace a segment of its 20-inch-diameter Line 1 pipeline in Linden and Woodbridge, New Jersey at a crossing of the Rahway River (Rahway River Pipe Replacement Project). Specifically, Texas Eastern proposes to install a new, approximate 1,250-foot section of 20-inch diameter pipeline beneath the Rahway River. The new segment will replace the existing segment of Line 1 pipeline, only a small portion of which will be removed. Texas Eastern states that the Rahway River Pipe Replacement Project is designed to ensure the continued safe operation of Texas Eastern’s pipeline VerDate Sep<11>2014 17:26 Oct 06, 2017 Jkt 244001 facilities. Texas Eastern asserts that the project will have no impact on the certificated capacity of its system, and there will be no abandonment or reduction in service to its customers. Texas Eastern estimates the cost of the project to be approximately $20 million, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Lisa A. Connolly, Director Rates and Certificates, Texas Eastern Transmission, LP, P.O. Box 1642, Houston, Texas 77251–1642, by telephone at (713) 627–4102, by facsimile at (713) 627–5947, or by email at lisa.connolly@enbridge.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and seven copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: October 4, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–21832 Filed 10–6–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER17–2577–000] Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization; York Haven Power Company, LLC This is a supplemental notice in the above-referenced proceeding of York Haven Power Company, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. E:\FR\FM\10OCN1.SGM 10OCN1

Agencies

[Federal Register Volume 82, Number 194 (Tuesday, October 10, 2017)]
[Notices]
[Pages 46973-46974]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-21725]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL17-95-000]


California Public Utilities Commission, Transmission Agency of 
Northern California, Sacramento Municipal Utility District, M-S-R 
Public Power Agency, City of Santa Clara, California, State Water 
Contractors, Modesto Irrigation District, Northern California Power 
Agency v. Pacific Gas and Electric Company; Notice of Complaint

    Take notice that on September 29, 2017, the California Public 
Utilities Commission, Transmission Agency of Northern California, 
Sacramento Municipal Utility District, M-S-R Public Power Agency, City 
of Santa Clara, California, doing business as Silicon Valley Power, 
State Water Contractors, Modesto Irrigation District, and Northern 
California Power Agency (collectively, Complainants) filed a formal 
complaint against Pacific Gas and Electric Company (Respondent) 
pursuant to section 206 of the Federal Power Act, 16 U.S.C. 824(e), 
825(e) (2012), and Rule 206 of the Rules of Practice and Procedure of 
the Federal Energy Regulatory Commission (Commission), 18 CFR 385.206 
(2017), alleging that Respondent's proposed Transmission Owner (TO) 
rates substantially exceed its cost of service and may well exceed the 
revenue requirement comprising its last clean rate. Complainants 
request that the Commission order an investigation into Respondent's TO 
rates and exercise its authority to establish the earliest possible 
refund effective date, all as more fully explained in the complaint.
    Complainants certify that copies of the complaint were served on 
the contact for PG&E.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure. 18 CFR 385.211, 385.214 (2017). Protests will 
be considered by the Commission in determining the appropriate action 
to be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests, must be filed on or before 
the comment date. The Respondent's answer, motions to intervene, and 
protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and

[[Page 46974]]

interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible online at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on October 19, 2017.

    Dated: October 2, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-21725 Filed 10-6-17; 8:45 am]