Promulgation of State Implementation Plan Revisions; Infrastructure Requirements for the 2010 SO2, 46681-46682 [2017-21520]
Download as PDF
46681
Federal Register / Vol. 82, No. 193 / Friday, October 6, 2017 / Rules and Regulations
Authority: 42 U.S.C. 7401 et seq.
PART 52—APPROVAL AND
PROMULGATION OF
IMPLEMENTATION PLANS
§ 52.1320
*
Subpart AA—Missouri
Identification of plan.
*
*
(e)* * *
*
*
2. Amend § 52.1320(e) by adding
entry (63) in numerical order to read as
follows:
■
1. The authority citation for part 52
continues to read as follows:
■
EPA-APPROVED MISSOURI NONREGULATORY SIP PROVISIONS
Name of nonregulatory SIP revision
*
(63) Sections 110 (a)(1)
and 110(a)(2) Infrastructure Requirements
for the 2008 Ozone
NAAQS.
*
Applicable
geographic or
nonattainment
area
*
Statewide ..........
*
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 52
[EPA–R08–OAR–2013–0558, FRL–9969–00–
Region 8]
Promulgation of State Implementation
Plan Revisions; Infrastructure
Requirements for the 2010 SO2 and
2012 PM2.5 National Ambient Air
Quality Standards; North Dakota
Environmental Protection
Agency (EPA).
ACTION: Final rule.
AGENCY:
The Environmental Protection
Agency (EPA) is approving elements of
State Implementation Plan (SIP)
revisions from the State of North Dakota
to demonstrate the State meets
infrastructure requirements of the Clean
Air Act (CAA) for the National Ambient
Air Quality Standards (NAAQS)
promulgated for sulfur dioxide (SO2) on
June 2, 2010, and fine particulate matter
(PM2.5) on December 14, 2012.
DATES: This rule is effective on
November 6, 2017.
ADDRESSES: The EPA has established a
docket for this action under Docket ID
No. EPA–R08–OAR–2013–0558. All
documents in the docket are listed on
the https://www.regulations.gov Web
site. Although listed in the index, some
information is not publicly available,
e.g., CBI or other information whose
disclosure is restricted by statute.
asabaliauskas on DSKBBXCHB2PROD with RULES
SUMMARY:
16:21 Oct 05, 2017
*
7/8/13
EPA approval date
*
10/6/17, [Insert Federal
Register citation].
*
[FR Doc. 2017–21528 Filed 10–5–17; 8:45 am]
VerDate Sep<11>2014
State submittal
date
Jkt 244001
*
Explanation
*
*
*
This action approves the following CAA elements:
110(a)(1) and 110(a)(2)(A), (B), (C), (D)(i)(II)—
prong 3, (D)(ii), (E), (F), (G), (H), (J), (K), (L),
and (M). 110(a)(2)(D)(i)(I)—prongs 1 and 2 are
addressed by a Federal Implementation Plan.
110(a)(2)(I) is not applicable. [EPA–R07–OAR–
2015–0356; FRL–9968–82–Region 7.]
*
Certain other material, such as
copyrighted material, is not placed on
the Internet and will be publicly
available only in hard copy form.
Publicly available docket materials are
available either electronically through
https://www.regulations.gov or in hard
copy at the Air Program, Environmental
Protection Agency (EPA), Region 8,
1595 Wynkoop Street, Denver, Colorado
80202–1129. The EPA requests that if at
all possible, you contact the individual
listed in the FOR FURTHER INFORMATION
CONTACT section to view the hard copy
of the docket. You may view the hard
copy of the docket Monday through
Friday, 8:00 a.m. to 4:00 p.m., excluding
federal holidays.
FOR FURTHER INFORMATION CONTACT: Kate
Gregory, Air Program, U.S.
Environmental Protection Agency
(EPA), Region 8, Mail Code 8P–AR,
1595 Wynkoop Street, Denver, Colorado
80202–1129, (303) 312–6175,
gregory.kate@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Background
Infrastructure requirements for SIPs
are set forth in section 110(a)(1) and (2)
of the CAA. Section 110(a)(2) lists the
specific infrastructure elements that a
SIP must contain or satisfy. The
elements that are the subject of this
action are described in detail in our
notice of proposed rulemaking
published on June 6, 2017 (82 FR
25999).
In our proposed rule, the EPA
proposed to approve some infrastructure
elements and to take no action on others
for the 2010 SO2 and 2012 PM2.5
NAAQS from the State’s March 7, 2013
PO 00000
Frm 00027
Fmt 4700
Sfmt 4700
*
*
and August 23, 2015 certifications,1
respectively. In this rulemaking, we are
taking final action to approve those
infrastructure elements from the State’s
certifications for which we proposed
approval.
II. Response to Comments
No comments were received on our
June 29, 2017 notice of proposed
rulemaking.
III. Final Action
For reasons expressed in the proposed
rule, the EPA is taking final action to
approve infrastructure elements from
the State’s certifications as shown in
Table 1. Elements we are taking no
action on are reflected in Table 2.
TABLE 1—LIST OF NORTH DAKOTA INFRASTRUCTURE ELEMENTS AND REVISIONS THE EPA IS APPROVING
Approval
March 7, 2013 submittal—2010 SO2 NAAQS:
(A), (B), (C), (D)(i)(II) prongs 3 and 4,
(D)(ii), (E), (F), (G), (H), (J), (K), (L) and
(M).
August 23, 2015 submittal—2012 PM2.5
NAAQS: (A), (B), (C), (D)(i)(II) prongs 3
and 4, (D)(ii), (E), (F), (G), (H), (J), (K), (L)
and (M).
1 ‘‘Where an air agency determines that the
provisions in or referred to by its existing EPA
approved SIP are adequate with respect to a given
infrastructure SIP element (or sub element) even in
light of the promulgation of a new or revised
NAAQS, the air agency may make a SIP submission
in the form of a certification.’’ EPA’s ‘‘Guidance on
Infrastructure State Implementation Plan (SIP)
Elements under Clean Air Act Sections 110(a)(1)
and (2),’’ September 13, 2013, at 7.
E:\FR\FM\06OCR1.SGM
06OCR1
46682
Federal Register / Vol. 82, No. 193 / Friday, October 6, 2017 / Rules and Regulations
• Does not provide the EPA with the
TABLE 2—LIST OF NORTH DAKOTA INFRASTRUCTURE ELEMENTS AND RE- discretionary authority to address, as
VISIONS THAT THE EPA IS TAKING appropriate, disproportionate human
health or environmental effects, using
NO ACTION ON
No action
(revision to be made in separate rulemaking
action)
asabaliauskas on DSKBBXCHB2PROD with RULES
March 7, 2013 submittal—2010 SO2 NAAQS:
(D)(i)(I) prongs 1 and 2.
August 23, 2015 submittal—2012 PM2.5
NAAQS: (D)(i)(I) prongs 1 and 2.
IV. Statutory and Executive Orders
Review
Under the Clean Air Act, the
Administrator is required to approve a
SIP submission that complies with the
provisions of the Act and applicable
federal regulations. 42 U.S.C. 7410(k);
40 CFR 52.02(a). Thus, in reviewing SIP
submissions, the EPA’s role is to
approve state choices, provided that
they meet the criteria of the Clean Air
Act. Accordingly, this action merely
approves state law as meeting federal
requirements and does not impose
additional requirements beyond those
imposed by state law. For that reason,
this action:
• Is not a significant regulatory action
subject to review by the Office of
Management and Budget under
Executive Orders 12866 (58 FR 51735,
October 4, 1993) and 13563 (76 FR 3821,
January 21, 2011);
• Does not impose an information
collection burden under the provisions
of the Paperwork Reduction Act (44
U.S.C. 3501 et seq.);
• Is certified as not having a
significant economic impact on a
substantial number of small entities
under the Regulatory Flexibility Act (5
U.S.C. 601 et seq.);
• Does not contain any unfunded
mandate or significantly or uniquely
affect small governments, as described
in the Unfunded Mandates Reform Act
of 1995 (Pub. L. 104–4);
• Does not have federalism
implications as specified in Executive
Order 13132 (64 FR 43255, August 10,
1999);
• Is not an economically significant
regulatory action based on health or
safety risks subject to Executive Order
13045 (62 FR 19885, April 23, 1997);
• Is not a significant regulatory action
subject to Executive Order 13211 (66 FR
28355, May 22, 2001);
• Is not subject to requirements of
section 12(d) of the National
Technology Transfer and Advancement
Act of 1995 (15 U.S.C. 272 note) because
application of those requirements would
be inconsistent with the Clean Air Act;
and
VerDate Sep<11>2014
16:21 Oct 05, 2017
Jkt 244001
practicable and legally permissible
methods, under Executive Order 12898
(59 FR 7629, February 16, 1994).
In addition, the SIP is not approved
to apply on any Indian reservation land
or in any other area where the EPA or
an Indian tribe has demonstrated that a
tribe has jurisdiction. In those areas of
Indian country, the rule does not have
tribal implications and will not impose
substantial direct costs on tribal
governments or preempt tribal law as
specified by Executive Order 13175 (65
FR 67249, November 9, 2000).
The Congressional Review Act, 5
U.S.C. 801 et seq., as added by the Small
Business Regulatory Enforcement
Fairness Act of 1996, generally provides
that before a rule may take effect, the
agency promulgating the rule must
submit a rule report, which includes a
copy of the rule, to each House of the
Congress and to the Comptroller General
of the United States. The EPA will
submit a report containing this action
and other required information to the
U.S. Senate, the U.S. House of
Representatives, and the Comptroller
General of the United States prior to
publication of the rule in the Federal
Register. A major rule cannot take effect
until 60 days after it is published in the
Federal Register. This action is not a
‘‘major rule’’ as defined by 5 U.S.C.
804(2).
Under Section 307(b)(1) of the Clean
Air Act, petitions for judicial review of
this action must be filed in the United
States Court of Appeals for the
appropriate circuit by December 5,
2017. Filing a petition for
reconsideration by the Administrator of
this final rule does not affect the finality
of this action for the purposes of judicial
review nor does it extend the time
within which a petition for judicial
review may be filed, and shall not
postpone the effectiveness of such rule
or action. This action may not be
challenged later in proceedings to
enforce its requirements. (See CAA
Section 307(b)(2)).
List of Subjects in 40 CFR Part 52
Environmental protection, Air
pollution control, Carbon monoxide,
Incorporation by reference,
Intergovernmental relations,
Greenhouse gases, Lead, Nitrogen
dioxide, Ozone, Particulate matter,
Reporting and recordkeeping
requirements, Sulfur oxides, Volatile
organic compounds.
Authority: 42 U.S.C. 7401 et seq.
PO 00000
Frm 00028
Fmt 4700
Sfmt 4700
Dated: September 18, 2017.
Suzanne J. Bohan,
Acting Regional Administrator, Region 8.
40 CFR part 52 is amended to read as
follows:
PART 52—APPROVAL AND
PROMULGATION OF
IMPLEMENTATION PLANS
1. The authority citation for Part 52
continues to read as follows:
■
Authority: 42 U.S.C. 7401 et seq.
Subpart JJ—North Dakota
2. Section 52.1833 is amended by
adding paragraph (f) to read as follows:
■
§ 52.1833 Section 110(a)(2) infrastructure
requirements.
*
*
*
*
*
(f) The North Dakota Department of
Health provided submissions to meet
infrastructure requirements for the State
of North Dakota for the 2010 SO2 and
2012 PM2.5 NAAQS on March 7, 2013
and August 23, 2015, respectively. The
State’s Infrastructure SIP for the 2010
SO2 and 2012 PM2.5 NAAQS is
approved with respect to section
(110)(a)(1) and the following elements of
section (110)(a)(2): (A), (B), (C) with
respect to minor NSR and PSD
requirements, (D)(i)(II), (D)(ii), (E), (F),
(G), (H), (J), (K), (L), and (M).
[FR Doc. 2017–21520 Filed 10–5–17; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 52
[EPA–R04–OAR–2017–0105; FRL–9968–92–
Region 4]
Air Plan Approval; Florida; Permitting
Revisions
Environmental Protection
Agency (EPA).
ACTION: Final rule.
AGENCY:
The Environmental Protection
Agency (EPA) is finalizing approval of
portions of five State Implementation
Plan (SIP) revisions submitted by the
State of Florida, Department of
Environmental Protection (FDEP),
through the Florida Division of Air
Resource Management, on June 23,
1999, July 1, 2011, December 12, 2011,
February 27, 2013, and February 1,
2017. Florida’s SIP revisions recodify,
clarify, and reorganize the State’s nontitle V air permitting and compliance
assurance program regulations
consistent with flexibility provided
SUMMARY:
E:\FR\FM\06OCR1.SGM
06OCR1
Agencies
[Federal Register Volume 82, Number 193 (Friday, October 6, 2017)]
[Rules and Regulations]
[Pages 46681-46682]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-21520]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R08-OAR-2013-0558, FRL-9969-00-Region 8]
Promulgation of State Implementation Plan Revisions;
Infrastructure Requirements for the 2010 SO2 and 2012 PM2.5 National
Ambient Air Quality Standards; North Dakota
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) is approving
elements of State Implementation Plan (SIP) revisions from the State of
North Dakota to demonstrate the State meets infrastructure requirements
of the Clean Air Act (CAA) for the National Ambient Air Quality
Standards (NAAQS) promulgated for sulfur dioxide (SO2) on
June 2, 2010, and fine particulate matter (PM2.5) on
December 14, 2012.
DATES: This rule is effective on November 6, 2017.
ADDRESSES: The EPA has established a docket for this action under
Docket ID No. EPA-R08-OAR-2013-0558. All documents in the docket are
listed on the https://www.regulations.gov Web site. Although listed in
the index, some information is not publicly available, e.g., CBI or
other information whose disclosure is restricted by statute. Certain
other material, such as copyrighted material, is not placed on the
Internet and will be publicly available only in hard copy form.
Publicly available docket materials are available either electronically
through https://www.regulations.gov or in hard copy at the Air Program,
Environmental Protection Agency (EPA), Region 8, 1595 Wynkoop Street,
Denver, Colorado 80202-1129. The EPA requests that if at all possible,
you contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section to view the hard copy of the docket. You may view the
hard copy of the docket Monday through Friday, 8:00 a.m. to 4:00 p.m.,
excluding federal holidays.
FOR FURTHER INFORMATION CONTACT: Kate Gregory, Air Program, U.S.
Environmental Protection Agency (EPA), Region 8, Mail Code 8P-AR, 1595
Wynkoop Street, Denver, Colorado 80202-1129, (303) 312-6175,
gregory.kate@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Background
Infrastructure requirements for SIPs are set forth in section
110(a)(1) and (2) of the CAA. Section 110(a)(2) lists the specific
infrastructure elements that a SIP must contain or satisfy. The
elements that are the subject of this action are described in detail in
our notice of proposed rulemaking published on June 6, 2017 (82 FR
25999).
In our proposed rule, the EPA proposed to approve some
infrastructure elements and to take no action on others for the 2010
SO2 and 2012 PM2.5 NAAQS from the State's March
7, 2013 and August 23, 2015 certifications,\1\ respectively. In this
rulemaking, we are taking final action to approve those infrastructure
elements from the State's certifications for which we proposed
approval.
---------------------------------------------------------------------------
\1\ ``Where an air agency determines that the provisions in or
referred to by its existing EPA approved SIP are adequate with
respect to a given infrastructure SIP element (or sub element) even
in light of the promulgation of a new or revised NAAQS, the air
agency may make a SIP submission in the form of a certification.''
EPA's ``Guidance on Infrastructure State Implementation Plan (SIP)
Elements under Clean Air Act Sections 110(a)(1) and (2),'' September
13, 2013, at 7.
---------------------------------------------------------------------------
II. Response to Comments
No comments were received on our June 29, 2017 notice of proposed
rulemaking.
III. Final Action
For reasons expressed in the proposed rule, the EPA is taking final
action to approve infrastructure elements from the State's
certifications as shown in Table 1. Elements we are taking no action on
are reflected in Table 2.
Table 1--List of North Dakota Infrastructure Elements and Revisions the
EPA Is Approving
------------------------------------------------------------------------
Approval
-------------------------------------------------------------------------
March 7, 2013 submittal--2010 SO2 NAAQS: (A), (B), (C), (D)(i)(II)
prongs 3 and 4, (D)(ii), (E), (F), (G), (H), (J), (K), (L) and (M).
August 23, 2015 submittal--2012 PM2.5 NAAQS: (A), (B), (C), (D)(i)(II)
prongs 3 and 4, (D)(ii), (E), (F), (G), (H), (J), (K), (L) and (M).
------------------------------------------------------------------------
[[Page 46682]]
Table 2--List of North Dakota Infrastructure Elements and Revisions That
the EPA Is Taking No Action On
------------------------------------------------------------------------
No action (revision to be made in separate rulemaking action)
-------------------------------------------------------------------------
March 7, 2013 submittal--2010 SO2 NAAQS: (D)(i)(I) prongs 1 and 2.
August 23, 2015 submittal--2012 PM2.5 NAAQS: (D)(i)(I) prongs 1 and 2.
------------------------------------------------------------------------
IV. Statutory and Executive Orders Review
Under the Clean Air Act, the Administrator is required to approve a
SIP submission that complies with the provisions of the Act and
applicable federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a).
Thus, in reviewing SIP submissions, the EPA's role is to approve state
choices, provided that they meet the criteria of the Clean Air Act.
Accordingly, this action merely approves state law as meeting federal
requirements and does not impose additional requirements beyond those
imposed by state law. For that reason, this action:
Is not a significant regulatory action subject to review
by the Office of Management and Budget under Executive Orders 12866 (58
FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);
Does not impose an information collection burden under the
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
Is certified as not having a significant economic impact
on a substantial number of small entities under the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.);
Does not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4);
Does not have federalism implications as specified in
Executive Order 13132 (64 FR 43255, August 10, 1999);
Is not an economically significant regulatory action based
on health or safety risks subject to Executive Order 13045 (62 FR
19885, April 23, 1997);
Is not a significant regulatory action subject to
Executive Order 13211 (66 FR 28355, May 22, 2001);
Is not subject to requirements of section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) because application of those requirements would be inconsistent
with the Clean Air Act; and
Does not provide the EPA with the discretionary authority
to address, as appropriate, disproportionate human health or
environmental effects, using practicable and legally permissible
methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).
In addition, the SIP is not approved to apply on any Indian
reservation land or in any other area where the EPA or an Indian tribe
has demonstrated that a tribe has jurisdiction. In those areas of
Indian country, the rule does not have tribal implications and will not
impose substantial direct costs on tribal governments or preempt tribal
law as specified by Executive Order 13175 (65 FR 67249, November 9,
2000).
The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the
Small Business Regulatory Enforcement Fairness Act of 1996, generally
provides that before a rule may take effect, the agency promulgating
the rule must submit a rule report, which includes a copy of the rule,
to each House of the Congress and to the Comptroller General of the
United States. The EPA will submit a report containing this action and
other required information to the U.S. Senate, the U.S. House of
Representatives, and the Comptroller General of the United States prior
to publication of the rule in the Federal Register. A major rule cannot
take effect until 60 days after it is published in the Federal
Register. This action is not a ``major rule'' as defined by 5 U.S.C.
804(2).
Under Section 307(b)(1) of the Clean Air Act, petitions for
judicial review of this action must be filed in the United States Court
of Appeals for the appropriate circuit by December 5, 2017. Filing a
petition for reconsideration by the Administrator of this final rule
does not affect the finality of this action for the purposes of
judicial review nor does it extend the time within which a petition for
judicial review may be filed, and shall not postpone the effectiveness
of such rule or action. This action may not be challenged later in
proceedings to enforce its requirements. (See CAA Section 307(b)(2)).
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Carbon monoxide,
Incorporation by reference, Intergovernmental relations, Greenhouse
gases, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and
recordkeeping requirements, Sulfur oxides, Volatile organic compounds.
Authority: 42 U.S.C. 7401 et seq.
Dated: September 18, 2017.
Suzanne J. Bohan,
Acting Regional Administrator, Region 8.
40 CFR part 52 is amended to read as follows:
PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
0
1. The authority citation for Part 52 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
Subpart JJ--North Dakota
0
2. Section 52.1833 is amended by adding paragraph (f) to read as
follows:
Sec. 52.1833 Section 110(a)(2) infrastructure requirements.
* * * * *
(f) The North Dakota Department of Health provided submissions to
meet infrastructure requirements for the State of North Dakota for the
2010 SO2 and 2012 PM2.5 NAAQS on March 7, 2013
and August 23, 2015, respectively. The State's Infrastructure SIP for
the 2010 SO2 and 2012 PM2.5 NAAQS is approved
with respect to section (110)(a)(1) and the following elements of
section (110)(a)(2): (A), (B), (C) with respect to minor NSR and PSD
requirements, (D)(i)(II), (D)(ii), (E), (F), (G), (H), (J), (K), (L),
and (M).
[FR Doc. 2017-21520 Filed 10-5-17; 8:45 am]
BILLING CODE 6560-50-P